ATH-Madison St Bridge
ATH County · est $2.1M
Bid dateThursday, May 22—
ATH County · est $2.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2D G M INC | R3George J Igel & CO INC | R4Shelly & Sands INC | R5Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 515E15080 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $115,000 | $91,200 | $72,000 | $74,464 | $69,000 | 36% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 156 CY | $910 | $1,215 | $1,400 | $1,150 | $1,290 | 9% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 63,658 LB | $2.00 | $1.20 | $1.75 | $2.00 | $1.75 | 8% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 155 CY | $580 | $715 | $850 | $975 | $905 | 6% |
| 524E94805 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK, AS PER | 180 FT | $450 | $550 | $575 | $643 | $840 | 5% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING |
| Item | Quantity | R1Alan Stone CO INC | R2D G M INC | R3George J Igel & CO INC | R4Shelly & Sands INC | R5Double Z Construction Company |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 265 SY | $15.00 | $4.00 | $8.25 | $10.00 | $30.00 |
| 202E30000 WALK REMOVED | 239 SF | $7.00 | $5.00 | $3.20 | $4.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 100 FT | $20.00 | $20.00 | $12.00 | $12.00 | $35.00 |
| 202E38000 GUARDRAIL REMOVED | 63 FT | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 80 CY |
| $910 |
| $665 |
| $720 |
| $760 |
| $625 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $56,000 | $30,000 | $100,000 | $119,542 | $100,000 | 4% |
| 524E94903 DRILLED SHAFTS, 48" DIAMETER ABOVE BEDROCK, AS PER | 98 FT | $550 | $510 | $210 | $758 | $315 | 3% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 178 SY | $300 | $300 | $450 | $527 | $440 | 3% |
| 517E70001 RAILING (TWIN STEEL TUBE), AS PER PLAN | 139 FT | $360 | $340 | $340 | $285 | $340 | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $50,000 | $96,000 | $132,000 | $75,885 | $90,000 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $46,000 | $25,000 | $160,500 | $180,000 | $175,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $28,000 | $35,000 | $5,000 | $7,000 | $30,000 | 2% |
| 511E51512 CLASS QC2 CONCRETE WITH QC/QA, SIDEWALK | 19 CY | $1,400 | $690 | $590 | $820 | $740 | 2% |
| 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 136 FT | $190 | $320 | $385 | $254 | $380 | 2% |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,500 | $3,000 | $3,000 | $2,950 | $2,700 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $10,000 | $14,500 | $32,527 | $15,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,000 | $20,500 | $8,000 | $4,000 | $17,000 | 1% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 181 CY | $120 | $100 | $110 | $100 | $110 | 1% |
| 611E07400 18" CONDUIT, TYPE B | 74 FT | $240 | $150 | $275 | $195 | $365 | 1% |
| $1.00 |
| $5.00 |
| $10.00 |
| $8.00 |
| 203E10000 EXCAVATION | 276 CY | $60.00 | $30.00 | $40.00 | $27.00 | $40.00 |
| 203E20000 EMBANKMENT | 844 CY | $15.00 | $25.00 | $27.00 | $45.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 370 SY | $8.50 | $8.00 | $9.00 | $5.00 | $14.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $520 | $75.00 | $135 | $220 | $200 |
| 606E15050 GUARDRAIL, TYPE MGS | 13 FT | $25.00 | $35.00 | $23.00 | $30.00 | $23.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $3,000 | $3,000 | $2,750 | $2,500 | $2,750 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,800 | $1,700 | $1,650 | $1,500 | $1,650 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $3,200 | $3,000 | $2,900 | $2,500 | $2,900 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $3,200 | $3,000 | $2,900 | $2,850 | $2,900 |
| 608E10000 4" CONCRETE WALK | 218 SF | $25.00 | $15.00 | $19.00 | $20.00 | $32.00 |
| 608E53020 DETECTABLE WARNING | 10 SF | $30.00 | $40.00 | $72.00 | $15.00 | $30.00 |
| 609E26000 CURB, TYPE 6 | 17 FT | $110 | $50.00 | $68.00 | $150 | $90.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 6 SY | $180 | $120 | $190 | $130 | $200 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $160 | $50.00 | $150 | $150 | $150 |
| 659E00300 TOPSOIL | 85 CY | $45.00 | $20.00 | $21.00 | $85.00 | $75.00 |
| 659E10000 SEEDING AND MULCHING | 898 SY | $2.00 | $4.00 | $6.70 | $4.00 | $11.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 38 SY | $8.50 | $0.05 | $3.70 | $4.00 | $3.70 |
| 659E15000 INTER-SEEDING | 38 SY | $8.50 | $0.05 | $3.70 | $4.00 | $3.70 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $610 | $1,500 | $1,250 | $1,250 | $1,250 |
| 659E31000 LIME | 0.16 ACRE | $880 | $300 | $150 | $150 | $150 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C | 15 FT | $200 | $150 | $180 | $125 | $250 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $5,500 | $4,000 | $5,000 | $5,000 | $4,900 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $4,800 | $7,500 | $4,150 | $4,350 | $4,100 |
| 611E99550 MANHOLE, NO. 1 | 2 EACH | $7,800 | $3,500 | $3,800 | $4,240 | $5,000 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 21 CY | $450 | $610 | $539 | $750 | $595 |
| 304E20000 AGGREGATE BASE | 62 CY | $120 | $130 | $125 | $135 | $160 |
| 407E20000 NON-TRACKING TACK COAT | 10 GAL | $6.00 | $3.90 | $4.00 | $3.50 | $3.90 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 7 CY | $920 | $675 | $1,152 | $1,500 | $655 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 16 SY | $230 | $200 | $180 | $245 | $160 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 42 FT | $25.00 | $20.00 | $20.00 | $25.00 | $32.00 |
| 630E80100 SIGN, FLAT SHEET | 20.3 SF | $25.00 | $35.00 | $22.00 | $25.00 | $32.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $40.00 | $20.00 | $25.00 | $35.00 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $40.00 | $20.00 | $35.00 | $35.00 | $45.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $100 | $70.00 | $100 | $110 | $65.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,000 | $140,000 | $88,000 | $316,500 | $350,000 |
| 503E31100 ROCK EXCAVATION | 64 CY | $95.00 | $50.00 | $62.05 | $80.00 | $240 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $8,300 | $4,000 | $5,300 | $4,120 | $5,000 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | 278 SY | $30.00 | $30.00 | $25.50 | $26.00 | $25.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 584 SY | $15.00 | $17.00 | $12.50 | $13.00 | $15.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 8 SY | $225 | $50.00 | $98.00 | $40.00 | $75.00 |
| 512E33000 TYPE 2 WATERPROOFING | 23 SY | $190 | $25.00 | $35.00 | $40.00 | $40.00 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 12 EACH | $1,250 | $1,850 | $1,700 | $4,130 | $1,550 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 72 SF | $4.00 | $15.00 | $10.00 | $8.00 | $12.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 301 SF | $3.50 | $25.00 | $12.00 | $8.00 | $16.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 186 FT | $10.00 | $47.50 | $40.00 | $45.00 | $30.00 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 93 SY | $80.00 | $45.00 | $32.00 | $36.00 | $35.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 82 CY | $150 | $120 | $170 | $148 | $140 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 116 FT | $20.00 | $20.00 | $16.00 | $17.00 | $25.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 120 FT | $20.00 | $20.00 | $12.00 | $6.00 | $17.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 25 FT | $20.00 | $70.00 | $65.00 | $22.00 | $25.00 |
| 526E90010 TYPE A INSTALLATION | 69 FT | $150 | $225 | $300 | $225 | $255 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 2 EACH | $4,500 | $5,000 | $6,500 | $3,185 | $3,400 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $39,000 | $10,000 | $12,847 | $16,000 |
| 619E16000 FIELD OFFICE, TYPE A | 8 MNTH | $1,200 | $750 | $1,650 | $3,253 | $1,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E15080 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $115,000 | $575k | 31% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 156 CY | $910 | $142k | 8% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 63,658 LB | $2 | $127k | 7% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 155 CY | $580 | $90k | 5% |
| 524E94805 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK, AS PER | 180 FT | $450 | $81k | 4% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 80 CY | $910 | $73k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $56,000 | $56k | 3% |
| 524E94903 DRILLED SHAFTS, 48" DIAMETER ABOVE BEDROCK, AS PER | 98 FT | $550 | $54k | 3% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 178 SY | $300 | $53k | 3% |
| 517E70001 RAILING (TWIN STEEL TUBE), AS PER PLAN | 139 FT | $360 | $50k | 3% |