Figure 0.1 · BRIEFING
BID #260010 · ODOTRESULT · awarded Jan 15

CUY-IR 480-13.04 Ramps

CUY County · est $2.2M

Bid dateThursday, January 15
Awarded toTRI-MOR CORP$1.87M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

80ITEMS
  • Drainage21%
  • Earthwork16%
  • Erosion & Landscaping10%
  • Maintaining Traffic10%
  • Curb, Walk & Ramp9%
  • Mobilization & General6%
  • Other28%

Top items by winning bid

ItemQtyUnit priceExtended%
452E14120 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P7,867 SY$93$732k39%
611E09101 21" CONDUIT, TYPE C, AS PER PLAN598 FT$185$111k6%
202E23000 PAVEMENT REMOVED8,469 SY$12.5$106k6%
304E20000 AGGREGATE BASE1,530 CY$60$92k5%
614E11000 MAINTAINING TRAFFIC1 LS$75,000$75k4%
451E15070 11" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P WITH634 SY$110$70k4%
203E10000 EXCAVATION2,751 CY$19$52k3%
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $183,000.00 2 $216,651.49 3 $145,326.00 4 $240,500.00 5 $210,850.00 6 $211,486.98 7 $244,029.00 8 $291,350.00 9 $249,638.451 LS$50,000$50k3%
605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC2,398 FT$20$48k3%
204E30010 GRANULAR MATERIAL, TYPE B905 CY$50$45k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.

Rank 1Tri-mor CORP$1.87MRank 2Anthony Allega Cement Contractor INC$1.99MRank 3Catts Construction INC$2.04MRank 4Karvo Companies INC$2.12MRank 5Great Lakes Construction CO$2.27MRank 6Perk Company INC$2.38MRank 7Ruhlin Company$2.48MRank 8Fabrizi Trucking & Paving CO INC$2.75MRank 9Kokosing Construction Company INC$2.79M
ItemQuantityR1Tri-mor CORPR2Anthony Allega Cement Contractor INCR3Catts Construction INCR4Karvo Companies INCR5Great Lakes Construction COR6Perk Company INCR7Ruhlin CompanyR8Fabrizi Trucking & Paving CO INCR9Kokosing Construction Company INC
452E14120 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P7,867 SY$93.00$95.40$105$105$119$111$116$129$119
611E09101 21" CONDUIT, TYPE C, AS PER PLAN598 FT$185$150$215$100$140$210$150$198$300
202E23000 PAVEMENT REMOVED8,469 SY$12.50$8.36$13.50$17.00$15.25$18.90$20.00$30.00$15.00
304E20000 AGGREGATE BASE1,530 CY$60.00$77.64$73.00$50.00$75.00$85.80$90.00$75.00$100
614E11000 MAINTAINING TRAFFIC1 LS$75,000$56,007$63,700$50,000$34,550$112,000$55,000$35,200$61,138
451E15070 11" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P WITH634 SY$110$115$122$175$139$139$125$137$123
203E10000 EXCAVATION2,751 CY$19.00$27.02$39.00$50.01$42.00$39.55$32.00$36.00$65.00
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $183,000.00 2 $216,651.49 3 $145,326.00 4 $240,500.00 5 $210,850.00 6 $211,486.98 7 $244,029.00 8 $291,350.00 9 $249,638.451 LS$50,000$93,651$14,000$126,000$113,000$34,259$124,000$178,650$138,000
605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC2,398 FT$20.00$24.36$17.00$15.00$26.00$27.00$45.00$28.00$34.00
204E30010 GRANULAR MATERIAL, TYPE B905 CY$50.00$70.96$29.00$50.00$65.00$84.00$74.00$65.00$85.00
605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC2,437 FT$15.00$20.17$16.00$15.00$21.00$18.45$19.00$18.00$28.00
611E05901 15" CONDUIT, TYPE B, AS PER PLAN313 FT$105$134$164$115$125$195$155$255$290
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $99,194.25 2 $96,965.42 3 $99,668.71 4 $88,526.55 5 $87,978.87 6 $97,309.25 7 $88,030.45 8 $125,956.00 9 $121,809.7332,623 EACH$1.00$1.00$1.00$1.00$1.00$1.00$1.00$1.00$1.00
209E60201 LINEAR GRADING, AS PER PLAN20 STA$1,350$764$500$250$500$378$295$3,110$800
614E12420 DETOUR SIGNING1 LS$25,000$22,148$24,636$25,000$13,500$21,600$19,775$21,600$30,000
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$25,000$50,154$28,266$25,000$17,500$25,000$22,750$28,000$30,000
659E00300 TOPSOIL444 CY$47.00$61.60$74.75$20.00$55.00$65.00$50.00$68.00$120
611E98300 CATCH BASIN, NO. 54 EACH$4,800$7,112$6,050$3,750$4,750$6,325$8,600$7,385$11,000
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$19,000$9,490$20,698$15,000$15,000$25,000$11,675$18,000$10,000
204E13000 EXCAVATION OF SUBGRADE905 CY$20.00$25.73$28.00$45.00$37.00$32.25$52.00$28.00$58.00
Show all 80 line items
ItemQuantityR1Tri-mor CORPR2Anthony Allega Cement Contractor INCR3Catts Construction INCR4Karvo Companies INCR5Great Lakes Construction COR6Perk Company INCR7Ruhlin CompanyR8Fabrizi Trucking & Paving CO INCR9Kokosing Construction Company INC
201E11000 CLEARING AND GRUBBING1 LS$7,000$896$1,800$3,000$20,000$9,170$60,500$26,200$25,000
202E30000 WALK REMOVED244 SF$3.00$4.47$3.00$4.00$4.00$3.15$2.00$2.00$5.00
202E30600 CONCRETE MEDIAN REMOVED105 SY$15.00$11.64$7.00$150$25.00$34.00$56.00$18.00$20.00
202E32000 CURB REMOVED194 FT$8.00$2.81$2.00$20.00$6.00$5.75$5.00$8.00$5.00
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER808 FT$18.00$8.43$10.00$15.00$13.00$39.50$18.00$25.00$40.00
202E58100 CATCH BASIN REMOVED7 EACH$300$487$600$1,000$875$576$400$450$1,000
202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT117 FT$13.00$21.86$22.00$25.00$25.00$34.50$70.00$18.00$40.00
202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER190 FT$5.00$28.00$4.50$20.00$30.00$33.60$70.00$40.00$12.00
203E20000 EMBANKMENT150 CY$10.00$33.75$10.00$50.00$12.50$25.25$105$14.00$9.00
204E10000 SUBGRADE COMPACTION8,946 SY$1.00$0.32$1.00$1.00$1.80$1.60$2.00$3.35$3.50
204E45000 PROOF ROLLING5 HOUR$200$146$289$275$300$572$410$150$305
608E10000 4" CONCRETE WALK258 SF$12.00$24.68$10.00$8.00$22.00$16.10$20.00$13.00$15.00
623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R1 LS$2,800$1,008$5,500$1,200$3,000$4,640$3,620$2,320$5,000
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND Section 1 - ROADWAY - Totals Awd $298,597.50 2 $286,804.72 3 $328,040.50 4 $444,261.51 5 $428,177.05 6 $477,021.90 7 $532,106.00 8 $603,470.10 9 $571,891.001 LS$2,800$1,008$5,500$1,200$3,000$4,640$3,620$2,320$2,000
659E00100 SOIL ANALYSIS TEST2 EACH$200$420$90.00$135$375$500$200$250$150
659E00510 SEEDING AND MULCHING, CLASS 23,991 SY$2.25$1.34$2.00$2.00$1.20$2.00$1.30$6.50$1.30
659E14000 REPAIR SEEDING AND MULCHING201 SY$2.25$2.24$1.00$5.00$2.00$2.00$3.00$2.00$3.00
659E15000 INTER-SEEDING201 SY$2.25$1.12$1.00$6.00$0.25$1.00$0.75$2.00$0.75
659E20000 COMMERCIAL FERTILIZER0.57 TON$3,500$1,344$1.00$885$1,200$1,000$900$2,000$900
659E31000 LIME0.83 ACRE$300$1.12$1.00$161$0.51$1,000$5.00$1,850$5.00
659E35000 WATER23 MGAL$120$67.20$1.00$1.00$60.00$10.00$0.75$10.00$0.75
670E00700 DITCH EROSION PROTECTION375 SY$16.00$3.36$1.00$5.00$3.00$3.80$5.50$6.00$5.50
670E00720 DITCH EROSION PROTECTION MAT, TYPE B305 SY$3.00$4.48$2.50$5.00$4.00$4.70$5.50$8.00$5.50
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$3,200$3,248$5,000$5,000$2,985$2,900$2,900$3,800$2,900
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$8,300$9,475$8,000$12,500$8,800$3,720$8,560$10,500$7,490
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA1 LS$12,000$12,467$11,131$15,000$8,750$15,133$11,131$14,000$15,000
605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS403 FT$15.00$19.01$19.00$20.00$27.00$24.60$18.00$22.00$40.00
605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC347 FT$16.00$25.08$16.00$25.00$20.00$24.60$14.00$16.00$38.00
611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS184 FT$25.00$48.74$16.00$15.00$42.00$21.50$31.00$18.00$70.00
611E06101 15" CONDUIT, TYPE C, AS PER PLAN11 FT$175$438$202$150$290$185$190$205$415
611E06101 15" CONDUIT, TYPE C, AS PER PLAN (706.02)8 FT$250$326$239$125$295$325$195$235$360
611E98150 CATCH BASIN, NO. 31 EACH$6,350$7,502$5,967$3,250$5,250$5,900$8,200$7,875$9,000
611E98370 CATCH BASIN, NO. 63 EACH$4,200$6,086$4,161$3,250$3,250$5,500$6,000$5,550$7,000
611E99550 MANHOLE, NO. 1 Section 3 - DRAINAGE - Totals Awd $291,382.00 2 $332,512.34 3 $328,837.00 4 $223,965.00 5 $305,219.00 6 $377,789.65 7 $381,294.00 8 $396,309.00 9 $549,569.001 EACH$5,100$6,246$6,240$5,500$3,750$6,725$6,800$11,150$6,000
252E01500 FULL DEPTH PAVEMENT SAWING198 FT$8.00$5.60$4.50$5.00$15.00$3.50$2.25$3.00$3.30
257E10001 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT153 SY$55.00$47.11$80.00$25.00$41.00$43.10$23.54$56.00$41.00
451E10010 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P72 SY$85.00$229$98.00$80.00$210$210$165$144$180
609E14000 CURB, TYPE 2-A220 FT$20.00$19.61$5.50$10.00$30.00$19.80$48.00$8.00$20.00
609E22000 CURB, TYPE 3-B8 FT$20.00$61.58$28.00$95.00$230$19.70$125$25.00$150
609E70000 4" CONCRETE MEDIAN108 SY$75.00$82.28$77.00$75.00$80.00$141$80.00$112$100
617E10101 COMPACTED AGGREGATE, AS PER PLAN Section 4 - PAVEMENT - Totals Awd $923,498.00 2 $984,389.03 3 $1,042,012.50 4 $1,040,070.00 5 $1,184,272.00 6 $1,141,632.00 7 $1,167,395.12 8 $1,252,665.00 9 $1,213,431.4018 CY$86.00$203$52.00$275$210$212$97.00$146$555
621E00100 RPM69 EACH$100$89.32$259$80.00$79.75$75.00$84.00$135$79.75
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST349.9 FT$10.00$16.80$19.00$15.00$8.15$14.00$15.00$14.00$15.00
630E08600 SIGN POST REFLECTOR12 EACH$18.00$42.00$78.00$37.50$15.50$65.00$37.50$65.00$37.50
630E80100 SIGN, FLAT SHEET169.5 SF$18.00$30.80$34.00$27.50$16.00$18.00$27.50$18.00$27.50
630E81010 RAMP REFERENCE MARKER2 EACH$85.00$140$156$125$65.00$180$125$180$125
630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL12 EACH$30.00$11.20$12.50$10.00$25.25$30.00$10.00$30.00$10.00
630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA19 EACH$30.00$11.20$12.50$10.00$26.00$40.00$10.00$40.00$10.00
646E10010 EDGE LINE, 6"0.83 MILE$6,000$5,656$10,590$8,500$5,050$6,500$8,500$6,500$8,500
646E10110 LANE LINE, 6"0.14 MILE$2,500$2,290$5,295$4,250$2,045$5,500$4,250$5,500$4,250
646E10310 CHANNELIZING LINE, 12"202 FT$2.00$2.07$3.00$2.25$1.85$2.50$2.25$2.50$2.25
646E10510 CROSSWALK LINE, 12"211 FT$8.50$8.46$12.50$10.00$7.55$6.00$10.00$6.00$10.00
646E10520 CROSSWALK LINE, 24"39 FT$14.00$13.87$15.50$12.50$12.38$11.00$12.50$11.00$12.50
646E20350 LANE REDUCTION ARROW5 EACH$300$299$436$350$267$200$350$200$350
646E20500 DOTTED LINE Section 5 - TRAFFIC CONTROL - Totals Awd $27,179.50 2 $30,033.27 3 $50,316.60 4 $31,021.75 5 $22,571.81 6 $31,849.60 7 $31,297.75 8 $35,989.60 9 $31,004.501,420 FT$2.00$1.68$2.00$1.50$1.50$5.00$1.50$5.00$1.50
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST80 HOUR$95.00$95.75$108$125$100$100$85.00$85.00$120
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN8 SNMT$1,000$952$1,059$1,000$750$1,293$850$1,000$900
614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I0.44 MILE$15,000$14,000$15,572$12,500$11,125$12,500$12,500$12,500$12,000
616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $47,800.00 2 $44,080.92 3 $50,693.68 4 $48,841.79 5 $32,590.00 6 $46,155.50 7 $39,172.00 8 $41,975.00 9 $52,350.003 MGAL$200$166$698$114$65.00$239$99.00$25.00$90.00
619E16011 FIELD OFFICE, TYPE B, AS PER PLAN7 MNTH$2,000$1,050$2,666$3,500$4,400$2,175$4,372$4,500$1,500

Project details

Description
CUY-IR 480-13.04 Ramps
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →