HIG-SR 73-06.57 Brdg Replace
HIG County · est $1.0M
Bid dateThursday, January 11—
HIG County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 64 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Sunesis Construction CO | R3Shelly & Sands INC | R4Eagle Bridge CO | R5Double Z Construction Company | R6Righter Company INC | R7Kokosing Construction Company INC | R8D G M INC | R9John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 156 CY | $750 | $984 | $1,170 | $1,250 | $900 | $1,141 | $1,000 | $1,300 | $1,263 | 15% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 194 CY | $550 |
| Item | Quantity | R1Complete General Construction Company | R2Sunesis Construction CO | R3Shelly & Sands INC | R4Eagle Bridge CO | R5Double Z Construction Company | R6Righter Company INC | R7Kokosing Construction Company INC | R8D G M INC | R9John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,000 | $1,828 | $1,600 | $2,500 | $5,000 | $1,500 | $5,000 | $16,000 | $8,134 |
| 202E23000 PAVEMENT REMOVED | 42 SY | $8.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $400 |
| $450 |
| $400 |
| $460 |
| $600 |
| $550 |
| $350 |
| $793 |
| 13% |
| 515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $19,300 | $19,705 | $22,000 | $20,000 | $21,000 | $23,250 | $24,000 | $26,400 | $21,988 | 12% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $55,000 | $26,420 | $32,000 | $50,000 | $47,000 | $50,000 | $50,393 | $96,000 | $68,497 | 7% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 223 SY | $235 | $264 | $260 | $225 | $225 | $200 | $250 | $190 | $406 | 7% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $45,000 | $37,005 | $25,000 | $52,500 | $40,000 | $35,000 | $60,000 | $30,000 | $44,587 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $38,900 | $40,000 | $40,000 | $50,000 | $40,000 | $40,000 | $40,000 | $10,000 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 38,999 LB | $0.98 | $0.95 | $1.05 | $1.05 | $1.20 | $1.25 | $1.29 | $1.10 | $1.15 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $81,147 | $40,000 | $50,000 | $60,000 | $50,000 | $75,000 | $92,500 | $42,755 | 4% |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,080 FT | $25.00 | $19.99 | $14.00 | $7.00 | $18.00 | $5.00 | $12.00 | $9.00 | $58.56 | 3% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,260 FT | $20.00 | $23.11 | $17.00 | $27.00 | $25.00 | $35.00 | $30.00 | $37.50 | $20.65 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 122 CY | $200 | $200 | $212 | $200 | $200 | $200 | $229 | $210 | $205 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 148 FT | $150 | $139 | $140 | $134 | $145 | $170 | $148 | $180 | $170 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 85 CY | $260 | $269 | $275 | $261 | $260 | $260 | $298 | $220 | $268 | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 314 SY | $65.00 | $82.47 | $63.00 | $70.00 | $60.00 | $85.00 | $81.25 | $75.00 | $55.91 | 3% |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 93 FT | $200 | $135 | $138 | $150 | $155 | $200 | $200 | $225 | $215 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 213 CY | $80.00 | $78.66 | $60.00 | $50.00 | $75.00 | $70.00 | $100 | $65.00 | $138 | 2% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $16,000 | $15,076 | $18,000 | $20,000 | $22,000 | $15,000 | $10,000 | $5,000 | $15,701 | 2% |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 4 EACH | $3,500 | $2,809 | $3,200 | $3,500 | $2,500 | $2,000 | $2,000 | $3,500 | $5,565 | 2% |
| 202E23500 WEARING COURSE REMOVED | 443 SY | $27.00 | $6.97 | $26.00 | $12.00 | $8.00 | $7.00 | $10.00 | $6.00 | $6.34 | 1% |
| $48.31 |
| $12.00 |
| $20.00 |
| $18.00 |
| $40.00 |
| $26.00 |
| $20.00 |
| $38.26 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 93 SY | $17.00 | $9.57 | $7.50 | $18.00 | $18.00 | $15.00 | $10.00 | $20.00 | $21.39 |
| 202E38000 GUARDRAIL REMOVED | 263 FT | $5.00 | $2.00 | $2.10 | $2.51 | $2.00 | $2.00 | $2.00 | $7.50 | $7.50 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 3 EACH | $225 | $250 | $260 | $150 | $250 | $250 | $250 | $500 | $500 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $75.00 | $90.00 | $95.00 | $150 | $90.00 | $90.00 | $90.00 | $300 | $300 |
| 203E10000 EXCAVATION | 254 CY | $20.00 | $15.34 | $19.00 | $25.00 | $25.00 | $25.00 | $23.00 | $25.00 | $22.81 |
| 203E20000 EMBANKMENT | 772 CY | $15.00 | $16.77 | $16.00 | $11.00 | $25.00 | $20.00 | $4.00 | $25.00 | $34.79 |
| 204E10000 SUBGRADE COMPACTION | 600 SY | $4.00 | $4.25 | $3.00 | $5.00 | $6.00 | $3.00 | $3.50 | $6.00 | $2.52 |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $15.95 | $16.50 | $19.00 | $15.99 | $16.50 | $16.50 | $16.50 | $20.00 | $19.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $1,930 | $1,950 | $2,060 | $1,934 | $1,950 | $1,950 | $1,950 | $2,200 | $2,175 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $685 | $800 | $848 | $687 | $800 | $800 | $800 | $1,000 | $950 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,875 | $1,850 | $1,900 | $1,879 | $1,850 | $1,850 | $1,850 | $1,900 | $1,725 |
| 659E10000 SEEDING AND MULCHING | 2,675 SY | $1.14 | $1.83 | $1.00 | $2.50 | $2.50 | $0.92 | $0.92 | $4.00 | $0.92 |
| 659E14000 REPAIR SEEDING AND MULCHING | 134 SY | $10.00 | $0.50 | $0.55 | $1.00 | $10.00 | $0.50 | $0.50 | $0.05 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.36 TON | $625 | $750 | $794 | $1,000 | $625 | $750 | $750 | $300 | $750 |
| 659E31000 LIME | 0.55 ACRE | $110 | $200 | $212 | $10.00 | $110 | $200 | $200 | $100 | $200 |
| 659E35000 WATER | 14.5 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,494 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 138 FT | $15.00 | $8.35 | $13.00 | $12.00 | $14.00 | $7.00 | $16.50 | $12.00 | $23.09 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 74 FT | $10.00 | $6.08 | $3.50 | $1.80 | $6.00 | $3.00 | $3.00 | $10.00 | $3.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 1,427 SY | $6.50 | $9.63 | $7.00 | $7.66 | $6.50 | $6.50 | $7.44 | $7.00 | $10.71 |
| 304E20000 AGGREGATE BASE | 142 CY | $65.00 | $72.47 | $68.00 | $40.00 | $80.00 | $65.00 | $50.00 | $65.00 | $108 |
| 407E10000 TACK COAT | 182 GAL | $2.50 | $2.50 | $2.60 | $2.51 | $2.50 | $2.50 | $2.86 | $2.80 | $2.50 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 38 CY | $300 | $300 | $318 | $301 | $300 | $300 | $343 | $220 | $262 |
| 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 0.26 MILE | $17,500 | $34,536 | $18,530 | $26,000 | $17,500 | $17,500 | $20,385 | $20,000 | $17,500 |
| 621E00100 RPM | 5 EACH | $350 | $200 | $530 | $351 | $200 | $1,113 | $350 | $500 | $200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $20.00 | $1.00 | $46.00 | $10.00 | $30.00 | $10.00 | $24.31 | $1.00 | $39.66 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 8 EACH | $16.00 | $14.56 | $21.00 | $16.04 | $8.00 | $8.00 | $8.00 | $16.00 | $10.00 |
| 642E00090 EDGE LINE, 4" | 0.26 MILE | $3,300 | $4,500 | $4,800 | $3,308 | $4,500 | $4,500 | $3,300 | $2,000 | $4,500 |
| 642E00290 CENTER LINE | 0.32 MILE | $3,445 | $4,150 | $4,400 | $3,453 | $4,150 | $4,150 | $3,445 | $6,000 | $4,150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $80.00 | $65.00 | $73.00 | $45.00 | $65.00 | $70.00 | $115 | $50.00 | $82.77 |
| 614E11630 INCREASED BARRIER DELINEATION | 350 FT | $2.25 | $2.00 | $2.20 | $2.00 | $1.50 | $2.00 | $2.25 | $2.50 | $2.25 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,800 | $1,800 | $2,075 | $1,804 | $1,950 | $1,950 | $1,800 | $1,800 | $1,800 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $152 | $320 | $190 | $301 | $125 | $250 | $500 | $150 | $223 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 15 EACH | $10.00 | $45.00 | $23.00 | $6.50 | $15.00 | $45.00 | $10.00 | $12.00 | $10.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 12 EACH | $10.00 | $45.00 | $27.00 | $6.50 | $15.00 | $45.00 | $10.00 | $12.00 | $10.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 27 EACH | $13.00 | $45.00 | $25.00 | $12.00 | $18.00 | $45.00 | $13.00 | $12.00 | $13.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.19 MILE | $11,000 | $10,500 | $11,120 | $11,000 | $10,500 | $10,500 | $11,000 | $12,000 | $11,488 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.37 MILE | $6,840 | $6,175 | $6,500 | $6,856 | $6,175 | $6,175 | $6,840 | $6,500 | $8,175 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.05 MILE | $6,075 | $9,615 | $10,150 | $6,250 | $9,615 | $9,615 | $6,072 | $6,500 | $13,369 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 36 FT | $8.00 | $6.65 | $7.00 | $6.00 | $6.65 | $6.65 | $8.00 | $12.00 | $11.86 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $9,000 | $3,558 | $6,000 | $5,000 | $11,000 | $1,000 | $7,500 | $1,000 | $5,178 |
| 616E10000 WATER | 3 MGAL | $60.00 | $11.55 | $50.00 | $10.00 | $50.00 | $10.00 | $110 | $1.00 | $54.89 |
| 622E41000 PORTABLE BARRIER, 32" | 350 FT | $13.00 | $15.95 | $14.50 | $15.00 | $18.00 | $20.00 | $13.00 | $14.00 | $13.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 260 FT | $14.00 | $17.97 | $18.00 | $16.00 | $24.00 | $25.00 | $14.00 | $15.00 | $14.00 |
| 202E22900 APPROACH SLAB REMOVED | 74 SY | $50.00 | $36.14 | $36.00 | $60.00 | $38.00 | $45.00 | $45.00 | $60.00 | $34.07 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $11,000 | $2,641 | $12,500 | $22,500 | $24,000 | $25,000 | $30,000 | $45,000 | $7,474 |
| 507E93300 STEEL POINTS OR SHOES | 36 EACH | $100 | $115 | $87.00 | $100 | $90.00 | $100 | $120 | $80.00 | $105 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 235 SY | $22.50 | $32.55 | $25.00 | $22.50 | $22.50 | $22.50 | $24.63 | $30.00 | $22.50 |
| 512E33000 TYPE 2 WATERPROOFING | 101 SY | $22.00 | $16.60 | $23.00 | $22.00 | $20.00 | $22.00 | $20.00 | $25.00 | $22.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 4 SF | $20.00 | $4.08 | $22.00 | $7.00 | $20.00 | $25.00 | $7.00 | $25.00 | $53.39 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 180 SF | $8.00 | $4.64 | $7.00 | $10.00 | $10.00 | $5.00 | $8.00 | $20.00 | $7.74 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 121 FT | $55.00 | $35.15 | $33.00 | $28.00 | $25.00 | $55.00 | $34.00 | $45.00 | $55.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $775 | $1,141 | $1,031 | $900 | $1,100 | $1,000 | $1,500 | $1,100 | $1,115 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 52 CY | $100 | $70.92 | $77.00 | $80.00 | $100 | $100 | $85.00 | $70.00 | $94.52 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 158 FT | $16.00 | $13.19 | $18.00 | $13.00 | $14.00 | $16.00 | $10.00 | $12.00 | $16.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 152 FT | $10.00 | $2.57 | $7.00 | $9.00 | $8.00 | $10.00 | $7.00 | $12.00 | $3.79 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 27 FT | $12.50 | $5.05 | $7.00 | $11.00 | $18.00 | $15.00 | $25.00 | $12.00 | $16.11 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $250 | $333 | $320 | $200 | $300 | $350 | $250 | $150 | $663 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $5,000 | $2,668 | $2,400 | $3,000 | $3,000 | $2,500 | $2,800 | $2,500 | $2,873 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $6,202 | $5,800 | $10,000 | $7,000 | $20,000 | $6,500 | $41,000 | $1,669 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $1,500 | $1,655 | $2,800 | $2,000 | $1,900 | $2,500 | $500 | $1,250 | $2,305 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $4,350 | $15,000 | $4,000 | $10,000 | $7,500 | $25,000 | $5,000 | $10,513 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 156 CY | $750 | $117k | 12% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 194 CY | $550 | $107k | 11% |
| 515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $19,300 | $97k | 10% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $55,000 | $55k | 5% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 223 SY | $235 | $52k | 5% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $45,000 | $45k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 38,999 LB | $0.98 | $38k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 3% |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,080 FT | $25 | $27k | 3% |