POR-SR 305/SR 700-0.00/VAR
POR County · est $1.6M
Bid dateThursday, January 25—
POR County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 69 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Shelly & Sands INC | R3Chagrin Valley Paving INC | R4Americon Industrial Services LLC | R5Shelly Company | R6Barbicas Construction Company INC | R7Burton Scot Contractors LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,917 CY | $121 | $124 | $117 | $140 | $140 | $150 | $148 | 39% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 7,900 SY | $19.00 | $22.50 | $17.00 | $29.00 | $20.50 | $24.00 | $40.00 | 12% |
| Item | Quantity | R1Ronyak Paving INC | R2Shelly & Sands INC | R3Chagrin Valley Paving INC | R4Americon Industrial Services LLC | R5Shelly Company | R6Barbicas Construction Company INC | R7Burton Scot Contractors LLC |
|---|---|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 44 SY | $35.00 | $37.00 | $10.00 | $10.00 | $1.00 | $20.00 | $95.00 |
| 202E30000 WALK REMOVED | 550 SF | $2.00 | $5.00 | $4.00 | $2.00 | $4.00 | $4.00 | $4.00 |
| 202E32000 CURB REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 448 (1244 CY |
| $99.50 |
| $106 |
| $105 |
| $125 |
| $135 |
| $150 |
| $125 |
| 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $64,000 | $45,000 | $150,000 | $22,770 | $157,500 | $50,000 | $100,000 | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (498 CY | $102 | $102 | $100 | $115 | $115 | $150 | $125 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $48,773 | $30,000 | $61,000 | $45,600 | $40,000 | $50,000 | $40,000 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1") | 66,772 SY | $0.65 | $0.65 | $0.75 | $1.00 | $1.00 | $1.25 | $0.85 | 4% |
| 644E00300 CENTER LINE | 12.67 MILE | $2,993 | $2,500 | $2,890 | $2,890 | $2,890 | $2,890 | $3,540 | 3% |
| 644E00104 EDGE LINE, 6" | 15.11 MILE | $2,100 | $2,400 | $3,000 | $3,000 | $3,000 | $3,000 | $1,790 | 3% |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 202 CY | $157 | $180 | $145 | $169 | $180 | $190 | $225 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN(T = 2") | 897 CY | $35.00 | $60.00 | $50.00 | $46.55 | $50.00 | $70.00 | $40.00 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 11,133 GAL | $2.00 | $3.00 | $2.00 | $3.05 | $2.85 | $3.65 | $2.50 | 2% |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 737 STA | $25.00 | $28.00 | $15.00 | $25.00 | $20.00 | $12.00 | $28.00 | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 35.29 MILE | $490 | $370 | $465 | $465 | $465 | $465 | $220 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 24 CF | $600 | $500 | $500 | $500 | $500 | $475 | $380 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 10,515 SY | $1.35 | $1.95 | $1.90 | $2.25 | $3.00 | $2.50 | $1.52 | 1% |
| 659E10000 SEEDING AND MULCHING | 22,351 SY | $0.60 | $0.25 | $0.55 | $0.90 | $0.60 | $0.25 | $0.60 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 13.23 MILE | $976 | $1,000 | $890 | $890 | $890 | $890 | $1,185 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 6,454 GAL | $1.85 | $3.00 | $2.00 | $3.55 | $3.45 | $4.25 | $3.50 | 1% |
| 621E00100 RPM | 535 EACH | $20.97 | $25.00 | $21.58 | $21.20 | $20.97 | $21.58 | $21.20 | 1% |
| 86 FT |
| $8.00 |
| $15.75 |
| $15.00 |
| $10.00 |
| $20.00 |
| $20.00 |
| $20.00 |
| 202E32500 CURB AND GUTTER REMOVED | 29 FT | $10.00 | $21.00 | $20.00 | $10.00 | $20.00 | $20.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 475 FT | $1.80 | $2.00 | $1.80 | $2.00 | $1.80 | $4.65 | $1.80 |
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 12 EACH | $2.00 | $2.00 | $2.00 | $80.00 | $2.00 | $33.00 | $2.00 |
| 203E10000 EXCAVATION | 13 CY | $65.00 | $22.00 | $40.00 | $20.00 | $50.00 | $65.00 | $70.00 |
| 209E60200 LINEAR GRADING | 402 STA | $5.00 | $40.00 | $10.00 | $70.00 | $35.00 | $10.00 | $30.00 |
| 606E13000 GUARDRAIL, TYPE 5 | 200 FT | $16.40 | $16.00 | $16.40 | $15.00 | $16.40 | $22.00 | $16.40 |
| 606E15050 GUARDRAIL, TYPE MGS | 75 FT | $17.80 | $16.50 | $17.80 | $15.00 | $17.80 | $23.00 | $17.80 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH | $1,845 | $1,800 | $1,845 | $1,900 | $1,845 | $2,400 | $1,845 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $720 | $750 | $720 | $625 | $720 | $925 | $720 |
| 608E10000 4" CONCRETE WALK | 117 SF | $7.00 | $8.50 | $8.00 | $10.00 | $8.00 | $8.00 | $8.00 |
| 608E52000 CURB RAMP | 547 SF | $15.00 | $21.00 | $15.00 | $20.00 | $15.00 | $15.00 | $15.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 8 EACH | $550 | $75.00 | $500 | $350 | $300 | $400 | $825 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $135 | $140 | $135 | $200 | $135 | $185 | $135 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $230 | $240 | $230 | $225 | $230 | $195 | $230 |
| 659E00300 TOPSOIL | 2 CY | $50.00 | $55.00 | $100 | $75.00 | $50.00 | $150 | $50.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1 SY | $6.00 | $27.00 | $0.55 | $5.00 | $6.00 | $10.00 | $6.00 |
| 659E20000 COMMERCIAL FERTILIZER | 3.02 TON | $700 | $350 | $625 | $525 | $700 | $100 | $700 |
| 659E31000 LIME | 4.63 ACRE | $1.00 | $50.00 | $110 | $125 | $1.00 | $40.00 | $0.50 |
| 659E35000 WATER | 122 MGAL | $1.00 | $0.25 | $1.00 | $1.00 | $1.00 | $1.00 | $0.10 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 6 EACH | $625 | $600 | $1,000 | $550 | $750 | $700 | $750 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,275 | $1,000 | $1,500 | $1,000 | $1,500 | $1,000 | $1,500 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $600 | $500 | $900 | $550 | $750 | $550 | $780 |
| 254E01600 PATCHING PLANED SURFACE | 3,500 SY | $0.50 | $4.00 | $0.50 | $3.00 | $1.00 | $1.15 | $2.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 10 FT | $45.00 | $53.00 | $85.00 | $100 | $40.00 | $40.00 | $40.00 |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T = 1 | 7,005 SY | $0.86 | $2.00 | $2.00 | $1.50 | $1.50 | $2.50 | $1.65 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 13 EACH | $475 | $25.00 | $500 | $260 | $250 | $100 | $500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 428 EACH | $1.63 | $7.00 | $1.00 | $6.00 | $5.00 | $4.00 | $8.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 37 EACH | $6.40 | $6.00 | $6.40 | $6.00 | $6.40 | $15.00 | $6.40 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 8 EACH | $7.40 | $7.00 | $7.40 | $6.00 | $7.40 | $15.00 | $7.40 |
| 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST | 12 FT | $12.50 | $13.00 | $12.50 | $12.00 | $12.50 | $21.00 | $12.50 |
| 630E80100 SIGN, FLAT SHEET | 33.8 SF | $20.00 | $21.00 | $20.00 | $20.00 | $20.00 | $31.00 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $10.00 | $10.00 | $10.00 | $15.00 | $10.00 | $70.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $55.00 | $58.00 | $55.00 | $75.00 | $55.00 | $140 | $55.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $10.00 | $10.00 | $10.00 | $20.00 | $10.00 | $70.00 | $10.00 |
| 644E00500 STOP LINE | 139 FT | $5.00 | $5.00 | $5.95 | $5.95 | $5.95 | $5.95 | $4.65 |
| 644E00600 CROSSWALK LINE | 821 FT | $2.50 | $2.00 | $2.95 | $2.95 | $2.95 | $2.95 | $2.65 |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 220 FT | $4.00 | $6.00 | $5.50 | $5.50 | $5.50 | $5.50 | $4.50 |
| 644E00901 ISLAND MARKING, AS PER PLAN | 396 SF | $1.95 | $7.00 | $10.00 | $10.00 | $10.00 | $10.00 | $15.00 |
| 644E01200 PARKING LOT STALL MARKING | 1,581 FT | $1.50 | $2.00 | $1.25 | $1.25 | $1.25 | $1.25 | $1.00 |
| 644E01400 WORD ON PAVEMENT, 72" | 16 EACH | $288 | $130 | $125 | $125 | $125 | $125 | $250 |
| 614E12460 WORK ZONE MARKING SIGN | 24 EACH | $56.10 | $92.00 | $88.00 | $88.00 | $65.00 | $100 | $69.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $250 | $200 | $150 | $200 | $165 | $200 | $175 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 13.23 MILE | $760 | $1,000 | $750 | $750 | $750 | $750 | $1,040 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 126 FT | $3.00 | $2.00 | $2.95 | $2.95 | $2.95 | $2.95 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 139 FT | $2.70 | $2.00 | $2.95 | $2.95 | $2.95 | $2.95 | $2.40 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $1,600 | $1,500 | $2,000 | $1,500 | $5,000 | $1,550 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $3,000 | $1,000 | $1,000 | $2,000 | $1,000 | $5,000 | $8,115 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 255 SY | $25.00 | $40.00 | $30.00 | $44.64 | $2.50 | $7.00 | $25.00 |
| 203E40000 BORROW | 2 CY | $600 | $200 | $200 | $200 | $200 | $218 | $560 |
| 407E20000 NON-TRACKING TACK COAT | 37 GAL | $18.00 | $3.00 | $2.00 | $3.05 | $2.85 | $10.00 | $9.00 |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 10 CY | $476 | $190 | $300 | $160 | $140 | $750 | $325 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (17 CY | $518 | $275 | $200 | $150 | $135 | $550 | $225 |
| 512E33010 TYPE 3 WATERPROOFING | 174 SY | $44.00 | $50.00 | $50.00 | $50.00 | $50.00 | $55.00 | $62.00 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 112.5 FT | $81.20 | $85.00 | $81.20 | $53.00 | $81.20 | $80.00 | $81.20 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 136 FT | $17.00 | $10.00 | $10.00 | $10.00 | $10.00 | $18.00 | $26.45 |
| 601E27000 DUMPED ROCK FILL, TYPE C | 2 CY | $600 | $525 | $500 | $500 | $500 | $1,000 | $525 |
| 606E16001 GUARDRAIL REBUILT, AS PER PLAN | 112.5 FT | $11.60 | $12.00 | $11.60 | $10.00 | $11.60 | $20.00 | $11.60 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $15.00 | $15.00 | $15.00 | $12.00 | $15.00 | $21.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $20.00 | $21.00 | $20.00 | $20.00 | $20.00 | $31.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $22.00 | $22.00 | $22.00 | $25.00 | $22.00 | $31.00 | $22.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $10.00 | $10.00 | $10.00 | $20.00 | $10.00 | $70.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $10.00 | $10.00 | $10.00 | $25.00 | $10.00 | $70.00 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,213 | $5,000 | $10,000 | $15,500 | $6,500 | $20,000 | $14,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,500 | $2,400 | $1,500 | $1,200 | $2,000 | $1,000 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $2,100 | $500 | $7,250 | $3,500 | $5,000 | $5,700 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,917 CY | $120.7 | $473k | 34% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 7,900 SY | $19 | $150k | 11% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1244 CY | $99.5 | $124k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $64,000 | $64k | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (498 CY | $102 | $51k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $48,773 | $49k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1") | 66,772 SY | $0.65 | $43k | 3% |
| 644E00300 CENTER LINE | 12.67 MILE | $2,993 | $38k | 3% |
| 644E00104 EDGE LINE, 6" | 15.11 MILE | $2,100 | $32k | 2% |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 202 CY | $157 | $32k | 2% |