GEA-SR-SR 700-02.71
GEA County · est $0.6M
Bid dateThursday, January 25—
GEA County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Barbicas Construction Company INC | R5Burton Scot Contractors LLC | R6Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 1,904 CY | $145 | $172 | $140 | $175 | $167 | $180 | 51% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 2,000 SY | $30.00 | $25.00 | $25.00 | $25.00 | $40.00 | $45.00 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $26,250 |
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Barbicas Construction Company INC | R5Burton Scot Contractors LLC | R6Shelly & Sands INC |
|---|---|---|---|---|---|---|---|
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 500 LB | $1.30 | $1.30 | $1.50 | $1.20 | $1.50 | $1.15 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $850 | $850 | $750 | $400 | $1,200 | $52.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $20,000 |
| $40,000 |
| $30,000 |
| $19,500 |
| $20,000 |
| 5% |
| 646E10010 EDGE LINE, 6" | 10.02 MILE | $2,364 | $2,364 | $2,364 | $2,580 | $2,435 | $2,500 | 4% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1" | 66,392 SY | $0.35 | $0.60 | $0.85 | $1.50 | $0.80 | $1.15 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,775 | $30,656 | $78,600 | $25,000 | $69,000 | $46,000 | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 489 CY | $35.00 | $35.00 | $50.00 | $70.00 | $40.00 | $55.00 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 5,313 GAL | $2.50 | $2.40 | $2.00 | $3.80 | $2.50 | $3.00 | 2% |
| 646E10200 CENTER LINE | 5.01 MILE | $2,509 | $2,509 | $2,509 | $3,525 | $2,470 | $2,650 | 2% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 9.99 MILE | $1,100 | $1,800 | $250 | $400 | $1,360 | $1,500 | 2% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $1,250 | $750 | $600 | $1,500 | $2,000 | 2% |
| 621E00100 RPM | 364 EACH | $22.56 | $22.56 | $24.14 | $24.14 | $24.14 | $23.00 | 2% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 4,396 LB | $1.30 | $0.72 | $1.50 | $2.00 | $1.75 | $0.30 | 1% |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 10.02 MILE | $570 | $485 | $485 | $485 | $585 | $525 | 1% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $300 | $705 | $250 | $350 | $1,110 | $760 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $2,300 | $5,000 | $15,000 | $6,700 | $2,000 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 5.01 MILE | $970 | $985 | $985 | $985 | $730 | $1,050 | 1% |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 10.02 MILE | $430 | $395 | $395 | $395 | $470 | $400 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.01 MILE | $760 | $750 | $750 | $750 | $615 | $795 | 1% |
| 209E60501 LINEAR GRADING, AS PER PLAN | 9.99 MILE | $375 | $220 | $250 | $400 | $900 | $2,000 | 1% |
| $1.00 |
| $1.00 |
| $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4 CY | $500 | $870 | $250 | $350 | $1,175 | $600 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 273 EACH | $4.00 | $4.90 | $1.00 | $4.00 | $8.00 | $5.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $5.00 | $20.00 | $20.00 | $20.00 | $20.00 | $21.00 |
| 646E10400 STOP LINE | 54 FT | $10.00 | $10.00 | $10.00 | $15.00 | $9.15 | $11.00 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $450 | $750 | $450 | $750 | $1,365 | $800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $45.00 | $52.00 | $60.00 | $65.00 | $59.00 | $69.00 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $12.00 | $125 | $125 | $58.26 | $103 | $130 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 25 CY | $100 | $100 | $100 | $150 | $150 | $110 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $925 | $925 | $925 | $925 | $1,050 | $2,250 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 54 FT | $3.00 | $2.50 | $2.50 | $2.50 | $2.50 | $2.60 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 54 FT | $2.70 | $2.50 | $2.50 | $2.50 | $2.40 | $2.60 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,500 | $120 | $500 | $500 | $750 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $2,433 | $500 | $500 | $3,000 | $2,025 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 1,904 CY | $145 | $276k | 49% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 2,000 SY | $30 | $60k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $26,250 | $26k | 5% |
| 646E10010 EDGE LINE, 6" | 10.02 MILE | $2,364 | $24k | 4% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1" | 66,392 SY | $0.35 | $23k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,775 | $21k | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 489 CY | $35 | $17k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 5,313 GAL | $2.5 | $13k | 2% |
| 646E10200 CENTER LINE | 5.01 MILE | $2,509 | $13k | 2% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 9.99 MILE | $1,100 | $11k | 2% |