HOL-SR 241-11.59
HOL County · est $0.2M
Bid dateThursday, February 1—
HOL County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.
| Item | Quantity | R1INC Lockhart Concrete CO | R2Freedom Construction Enterprises, | R3R C Construction Company And Son | R4INC Stanley Miller Construction Company | R5Shelly & Sands INC | R6Buds INC | R7Bog Construction INC | R8Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E94801 8' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN, DESI | 72 FT | $785 | $677 | $650 | $696 | $700 | $1,000 | $450 | $1,250 | 32% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 58 CY | $250 | $295 | $295 | $229 | $175 |
| Item | Quantity | R1INC Lockhart Concrete CO | R2Freedom Construction Enterprises, | R3R C Construction Company And Son | R4INC Stanley Miller Construction Company | R5Shelly & Sands INC | R6Buds INC | R7Bog Construction INC | R8Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 225 SY | $5.00 | $9.00 | $20.00 | $12.80 | $17.00 | $20.00 | $25.00 | $15.50 |
| 202E38000 GUARDRAIL REMOVED | 387.5 FT | $3.00 | $3.00 | $3.00 | $2.00 | $1.60 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $200 |
| $365 |
| $217 |
| 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $11,698 | $20,000 | $27,789 | $1,300 | $34,000 | $4,500 | $20,000 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $11,000 | $10,033 | $10,000 | $28,878 | $10,000 | $31,500 | $25,000 | $109,166 | 6% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 133 CY | $70.00 | $122 | $110 | $106 | $145 | $120 | $250 | $151 | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $9,000 | $5,801 | $10,000 | $6,933 | $15,000 | $15,000 | $80,000 | $7,739 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,000 | $2,946 | $10,000 | $8,555 | $8,500 | $20,000 | $2,500 | $15,000 | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7 CY | $1,000 | $1,113 | $550 | $976 | $2,300 | $1,500 | $1,300 | $1,764 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $7,336 | $7,500 | $4,000 | $2,000 | $10,000 | $15,000 | $14,500 | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $4,125 | $10,000 | $4,722 | $4,500 | $5,000 | $18,000 | $8,404 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $12,753 | $12,500 | $5,933 | $15,000 | $10,000 | $6,000 | $3,679 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $18.00 | $24.00 | $18.00 | $18.45 | $22.00 | $16.60 | $23.00 | $26.00 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 13 CY | $350 | $489 | $375 | $1,009 | $275 | $235 | $550 | $955 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 21 CY | $200 | $474 | $550 | $563 | $2,100 | $550 | $1,750 | $654 | 2% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 3 EACH | $1,100 | $1,415 | $1,200 | $1,156 | $1,000 | $1,040 | $1,100 | $1,036 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (11 CY | $300 | $574 | $375 | $891 | $290 | $205 | $625 | $843 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $150 | $192 | $50.00 | $60.00 | $155 | $130 | $150 | $228 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,900 | $17,519 | $4,500 | $1,433 | $5,000 | $10,000 | $12,500 | $9,926 | 2% |
| 203E10000 EXCAVATION | 195 CY | $12.00 | $13.00 | $20.00 | $22.00 | $24.00 | $25.00 | $25.00 | $19.00 | 1% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,197 LB | $1.00 | $2.00 | $2.25 | $1.70 | $2.00 | $1.50 | $3.00 | $2.50 | 1% |
| $4.00 |
| $1.50 |
| 202E75000 FENCE REMOVED | 123 FT | $2.00 | $5.00 | $10.00 | $2.00 | $4.50 | $5.00 | $5.00 | $5.00 |
| 203E20000 EMBANKMENT | 147 CY | $12.00 | $5.00 | $20.00 | $53.00 | $14.00 | $25.00 | $25.00 | $11.50 |
| 204E10000 SUBGRADE COMPACTION | 247 SY | $2.00 | $3.00 | $2.00 | $1.00 | $5.00 | $5.00 | $5.00 | $4.50 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 25 FT | $18.00 | $82.00 | $75.00 | $71.23 | $50.00 | $64.10 | $51.00 | $49.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,000 | $2,593 | $2,000 | $2,195 | $2,000 | $1,975 | $2,100 | $2,076 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $900 | $1,120 | $1,500 | $778 | $800 | $700 | $1,000 | $825 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 21 CY | $100 | $124 | $75.00 | $152 | $170 | $110 | $100 | $157 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $104 | $300 | $100 | $93.00 | $75.00 | $50.00 | $316 |
| 659E00300 TOPSOIL | 62 CY | $20.00 | $26.00 | $25.00 | $40.00 | $40.00 | $35.00 | $30.00 | $76.50 |
| 659E10000 SEEDING AND MULCHING | 562 SY | $2.00 | $3.00 | $10.00 | $3.40 | $3.00 | $3.00 | $6.50 | $10.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $900 | $1,002 | $1,200 | $600 | $750 | $650 | $1,000 | $789 |
| 659E31000 LIME | 0.12 ACRE | $600 | $1,002 | $800 | $500 | $155 | $200 | $500 | $211 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E07600 18" CONDUIT, TYPE C | 7 FT | $100 | $125 | $150 | $126 | $250 | $100 | $200 | $104 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 155 SY | $10.00 | $35.00 | $40.00 | $32.25 | $20.00 | $18.00 | $20.00 | $30.50 |
| 304E20000 AGGREGATE BASE | 40 CY | $50.00 | $77.00 | $75.00 | $105 | $100 | $120 | $100 | $89.50 |
| 407E10000 TACK COAT | 15 GAL | $5.00 | $4.00 | $10.00 | $2.78 | $2.00 | $10.00 | $10.00 | $2.50 |
| 621E00100 RPM | 2 EACH | $700 | $560 | $3,000 | $100 | $1,000 | $400 | $1,000 | $1,026 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $30.00 | $10.00 | $20.00 | $50.00 | $50.00 | $10.00 | $100 | $13.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 8 EACH | $10.00 | $10.00 | $20.00 | $12.00 | $6.50 | $8.00 | $10.00 | $6.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $14.00 | $12.00 | $12.00 | $12.25 | $15.00 | $11.00 | $20.00 | $16.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $40.00 | $53.00 | $50.00 | $50.00 | $45.00 | $45.00 | $100 | $47.50 |
| 630E80100 SIGN, FLAT SHEET | 2 SF | $16.00 | $41.00 | $50.00 | $45.00 | $35.00 | $40.00 | $70.00 | $37.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $60.00 | $82.00 | $75.00 | $50.00 | $45.00 | $45.00 | $100 | $47.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $20.00 | $29.00 | $50.00 | $23.00 | $10.00 | $20.00 | $100 | $10.50 |
| 646E10010 EDGE LINE, 6" | 0.02 MILE | $20,000 | $6,942 | $75,000 | $111,112 | $255,000 | $37,000 | $300,000 | $38,681 |
| 646E10200 CENTER LINE | 0.01 MILE | $40,000 | $13,371 | $100,000 | $138,889 | $255,000 | $51,000 | $300,000 | $53,606 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.01 MILE | $40,000 | $2,151 | $32,000 | $44,450 | $42,000 | $10,000 | $10,000 | $32,744 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.02 MILE | $20,000 | $1,167 | $16,000 | $22,250 | $21,000 | $20,000 | $10,000 | $16,372 |
| 616E10000 WATER | 10 MGAL | $50.00 | $32.00 | $1.00 | $1.00 | $18.00 | $1.00 | $1.00 | $60.00 |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $50.00 | $162 | $45.00 | $40.00 | $115 | $75.00 | $40.00 | $135 |
| 503E21100 UNCLASSIFIED EXCAVATION | 195 CY | $10.00 | $11.00 | $20.00 | $25.00 | $43.02 | $20.00 | $35.00 | $36.50 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $800 | $1,151 | $550 | $1,098 | $700 | $2,000 | $2,000 | $2,679 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 42 SY | $10.00 | $17.00 | $40.00 | $40.00 | $48.00 | $35.00 | $30.00 | $45.50 |
| 512E33000 TYPE 2 WATERPROOFING | 173 SY | $10.00 | $15.00 | $30.00 | $15.50 | $24.00 | $18.00 | $20.00 | $40.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $2.00 | $9.00 | $20.00 | $2.25 | $15.00 | $15.00 | $10.00 | $15.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 10 CY | $60.00 | $228 | $65.00 | $351 | $250 | $125 | $100 | $127 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $250 | $2,246 | $500 | $500 | $2,200 | $100 | $500 | $250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94801 8' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN, DESI | 72 FT | $785 | $57k | 27% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 58 CY | $250 | $15k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $14k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $11,000 | $11k | 5% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 133 CY | $70 | $9k | 4% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $9,000 | $9k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,000 | $9k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7 CY | $1,000 | $7k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $7k | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $5k | 2% |