GEA-SR 528-16.48
GEA County · est $2.3M
Bid dateThursday, March 8—
GEA County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Burton Scot Contractors LLC | R5Karvo Companies INC | R6Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,127 CY | $131 | $140 | $136 | $137 | $150 | $170 | 35% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (3345 CY | $112 | $115 | $110 | $117 | $124 | $160 | 19% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 2,200 CY | $145 | $120 |
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Burton Scot Contractors LLC | R5Karvo Companies INC | R6Barbicas Construction Company INC |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 5,150 FT | $1.60 | $1.60 | $1.60 | $1.60 | $1.60 | $1.60 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 52.2 STA | $120 | $120 | $120 | $120 | $120 | $120 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $130 |
| $130 |
| $138 |
| $150 |
| 17% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 44 EACH | $1,945 | $1,945 | $1,945 | $1,945 | $1,945 | $1,945 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $67,000 | $60,000 | $155,000 | $72,150 | $85,000 | $75,000 | 3% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (212 CY | $225 | $270 | $175 | $230 | $360 | $220 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $46,600 | $50,000 | $40,000 | $100,000 | $43,000 | $100,000 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,925 FT | $15.60 | $15.60 | $15.60 | $15.60 | $15.60 | $15.60 | 2% |
| 646E10010 EDGE LINE, 6" | 15.38 MILE | $2,460 | $2,650 | $2,650 | $2,460 | $2,460 | $2,650 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 17,010 GAL | $2.15 | $2.25 | $2.00 | $2.00 | $2.75 | $3.60 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 649 CY | $49.00 | $68.00 | $50.00 | $45.00 | $31.00 | $60.00 | 2% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $425 | $300 | $175 | $250 | $235 | $220 | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 900 SY | $32.00 | $47.00 | $40.00 | $38.00 | $25.00 | $32.00 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 60 CY | $361 | $330 | $175 | $275 | $278 | $220 | 1% |
| 646E10200 CENTER LINE | 7.39 MILE | $2,530 | $1,660 | $1,660 | $2,530 | $2,530 | $1,660 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 30.75 MILE | $500 | $525 | $525 | $500 | $525 | $525 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,750 | $7,325 | $13,700 | $17,600 | $20,000 | $15,000 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 10,125 LB | $1.25 | $0.70 | $1.40 | $1.25 | $1.40 | $1.25 | 1% |
| 621E00100 RPM | 554 EACH | $22.44 | $21.55 | $21.55 | $22.45 | $22.44 | $21.55 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 14.78 MILE | $776 | $715 | $715 | $776 | $715 | $715 | 1% |
| 209E70000 BORROW |
| 158 CY |
| $49.50 |
| $49.50 |
| $49.50 |
| $49.50 |
| $49.50 |
| $49.50 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 13.82 MILE | $200 | $115 | $500 | $250 | $1,150 | $800 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $775 | $775 | $775 | $775 | $775 | $775 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $675 | $675 | $750 | $850 | $440 | $450 |
| 623E39600 MONUMENT BOX RECONSTRUCTED TO GRADE | 2 EACH | $800 | $800 | $1,000 | $1,300 | $425 | $650 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 2 EACH | $140 | $140 | $140 | $140 | $140 | $140 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 2 EACH | $148 | $148 | $148 | $148 | $148 | $140 |
| 203E10000 EXCAVATION | 50 CY | $28.00 | $20.00 | $10.00 | $35.00 | $15.00 | $20.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 500 LB | $1.35 | $1.35 | $2.00 | $1.40 | $1.25 | $1.25 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.5" AVG. | 6,418 SY | $1.10 | $4.30 | $3.00 | $2.00 | $3.50 | $2.75 |
| 304E20000 AGGREGATE BASE | 50 CY | $70.00 | $40.00 | $50.00 | $50.00 | $40.00 | $40.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 400 EACH | $8.00 | $7.00 | $1.00 | $5.00 | $3.00 | $2.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 89 EACH | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 646E10400 STOP LINE | 121 FT | $10.00 | $11.55 | $11.55 | $10.00 | $10.00 | $11.55 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 325 FT | $7.00 | $9.15 | $9.15 | $7.00 | $7.00 | $9.15 |
| 646E20800 YIELD LINE | 38 FT | $20.00 | $30.00 | $30.00 | $20.00 | $20.00 | $30.00 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $400 | $525 | $525 | $400 | $525 | $525 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $45.00 | $50.00 | $60.00 | $60.00 | $65.00 | $65.00 |
| 614E12460 WORK ZONE MARKING SIGN | 16 EACH | $55.00 | $85.00 | $85.00 | $85.00 | $85.00 | $70.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $125 | $100 | $75.00 | $150 | $203 | $125 |
| 614E13360 OBJECT MARKER, TWO WAY | 133 EACH | $12.50 | $15.00 | $10.00 | $12.50 | $7.50 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $947 | $915 | $915 | $915 | $915 | $915 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 7.39 MILE | $895 | $900 | $900 | $895 | $900 | $900 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 15.37 MILE | $575 | $625 | $625 | $575 | $625 | $625 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 159 FT | $3.00 | $3.25 | $3.25 | $3.00 | $3.25 | $3.25 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 318 FT | $2.80 | $3.00 | $3.00 | $2.00 | $3.00 | $3.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $7.00 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,500 | $250 | $500 | $1,200 | $1,500 | $500 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $1,500 | $1,000 | $1,500 | $1,750 | $650 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $2,500 | $500 | $6,300 | $1,500 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,127 CY | $130.75 | $670k | 33% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (3345 CY | $112 | $375k | 18% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 2,200 CY | $145 | $319k | 16% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 44 EACH | $1,945 | $86k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $67,000 | $67k | 3% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (212 CY | $225 | $48k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $46,600 | $47k | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,925 FT | $15.6 | $46k | 2% |
| 646E10010 EDGE LINE, 6" | 15.38 MILE | $2,460 | $38k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 17,010 GAL | $2.15 | $37k | 2% |