PAU-CR 123-01.47 OBPP
PAU County · est $0.4M
Bid dateThursday, March 8—
PAU County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2R & I Construction INC | R3R G Zachrich Construction INC | R4Vtf Excavation LLC | R5Vernon Nagel INC | R6Miller Bros Const INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 515E10051 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 7 EACH | $9,800 | $10,970 | $11,600 | $12,432 | $12,450 | $14,150 | 26% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 65 CY | $500 | $600 | $625 | $537 | $765 | $700 | 13% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $14,000 | $10,000 | $10,000 | $2,503 |
| Item | Quantity | R1Eagle Bridge CO | R2R & I Construction INC | R3R G Zachrich Construction INC | R4Vtf Excavation LLC | R5Vernon Nagel INC | R6Miller Bros Const INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $1,000 | $4,000 | $1,731 | $1,500 | $2,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 355 SY | $11.00 | $7.00 | $8.00 | $4.41 | $12.00 | $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 84 FT | $7.00 | $1.00 | $16.82 | $5.22 | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10,000 |
| $20,000 |
| 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 111 FT | $124 | $124 | $124 | $144 | $124 | $124 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 52 CY | $210 | $230 | $230 | $300 | $230 | $230 | 4% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 360 FT | $30.00 | $40.00 | $20.00 | $24.42 | $30.00 | $30.00 | 4% |
| 304E20000 AGGREGATE BASE | 153 CY | $70.00 | $45.00 | $54.00 | $45.64 | $55.00 | $70.00 | 4% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $10,000 | $21,000 | $20,000 | $11,225 | $18,000 | $25,000 | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $10,000 | $8,000 | $12,500 | $20,695 | $15,000 | $10,000 | 4% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 38 CY | $261 | $263 | $263 | $480 | $263 | $263 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 6,611 LB | $1.25 | $1.50 | $1.30 | $0.95 | $1.50 | $1.75 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $8,250 | $500 | $2,000 | $4,903 | $1,000 | $1.00 | 3% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 122 CY | $65.00 | $80.00 | $68.00 | $71.97 | $90.00 | $100 | 3% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,904 | $1,900 | $1,900 | $2,856 | $1,900 | $1,900 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $7,500 | $24,488 | $10,000 | $16,804 | $10,000 | $10,000 | 3% |
| 512E33010 TYPE 3 WATERPROOFING | 189 SY | $35.00 | $30.00 | $34.00 | $37.37 | $35.00 | $36.00 | 3% |
| 611E07900 18" CONDUIT, TYPE D | 142 FT | $45.00 | $45.00 | $40.00 | $38.52 | $55.00 | $50.00 | 2% |
| 251E01010 PARTIAL DEPTH PAVEMENT REPAIR (441) | 20 CY | $300 | $270 | $270 | $345 | $290 | $335 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,250 | $200 | $1,500 | $960 | $1,750 | $1,750 | 2% |
| $20.00 |
| 203E10000 EXCAVATION | 179 CY | $18.00 | $10.00 | $12.50 | $11.06 | $15.00 | $16.00 |
| 203E20000 EMBANKMENT | 180 CY | $19.00 | $10.00 | $12.50 | $5.70 | $15.00 | $16.00 |
| 204E10000 SUBGRADE COMPACTION | 773 SY | $2.00 | $1.00 | $2.00 | $0.75 | $1.00 | $1.25 |
| 204E45000 PROOF ROLLING | 1 HOUR | $100 | $25.00 | $200 | $172 | $150 | $200 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 25 FT | $19.04 | $19.00 | $19.00 | $28.44 | $19.00 | $19.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 2 EACH | $2,030 | $2,025 | $2,025 | $2,940 | $2,025 | $2,025 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $697 | $695 | $695 | $1,044 | $695 | $695 |
| 659E00300 TOPSOIL | 99 CY | $10.00 | $10.00 | $25.00 | $23.31 | $35.00 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 888 SY | $4.00 | $2.00 | $3.25 | $3.05 | $4.25 | $1.65 |
| 659E14000 REPAIR SEEDING AND MULCHING | 44 SY | $1.00 | $1.00 | $0.50 | $1.98 | $4.25 | $1.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $1,000 | $500 | $450 | $900 | $600 | $750 |
| 659E31000 LIME | 0.18 ACRE | $10.00 | $10.00 | $100 | $240 | $30.00 | $200 |
| 659E35000 WATER | 5 MGAL | $10.00 | $1.00 | $1.00 | $1.20 | $1.00 | $10.00 |
| 605E31100 AGGREGATE DRAINS | 74 FT | $10.00 | $10.00 | $12.00 | $9.20 | $15.00 | $18.00 |
| 611E01400 6" CONDUIT, TYPE E | 25 FT | $4.00 | $5.00 | $5.00 | $8.93 | $10.00 | $6.00 |
| 611E01500 6" CONDUIT, TYPE F | 25 FT | $4.00 | $5.00 | $5.00 | $8.93 | $10.00 | $6.00 |
| 611E02600 8" CONDUIT, TYPE F | 25 FT | $5.00 | $5.00 | $7.00 | $14.42 | $12.00 | $7.00 |
| 611E04400 12" CONDUIT, TYPE B | 25 FT | $25.00 | $10.00 | $10.00 | $36.90 | $12.00 | $8.00 |
| 407E10000 TACK COAT | 50 GAL | $2.51 | $1.90 | $1.90 | $6.00 | $1.90 | $1.90 |
| 617E10100 COMPACTED AGGREGATE | 30 CY | $80.00 | $30.00 | $54.00 | $46.09 | $60.00 | $100 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $10.02 | $10.00 | $7.50 | $14.40 | $6.20 | $10.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 4 EACH | $15.04 | $10.00 | $15.00 | $30.00 | $20.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $32.80 | $10.00 | $15.00 | $30.00 | $25.00 | $15.00 |
| 642E00290 CENTER LINE | 0.05 MILE | $40,092 | $40,000 | $40,000 | $48,000 | $40,000 | $40,000 |
| 616E10000 WATER | 1 MGAL | $10.00 | $1.00 | $50.00 | $1.20 | $100 | $75.00 |
| 202E23500 WEARING COURSE REMOVED | 59 SY | $15.00 | $10.00 | $10.00 | $2.44 | $20.00 | $10.00 |
| 407E10000 TACK COAT | 18 GAL | $2.51 | $1.90 | $1.90 | $6.00 | $1.90 | $1.90 |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 17 CY | $261 | $263 | $263 | $480 | $263 | $263 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 300 FT | $10.00 | $5.00 | $2.00 | $22.60 | $4.00 | $10.00 |
| 507E93300 STEEL POINTS OR SHOES | 12 EACH | $115 | $100 | $100 | $114 | $125 | $115 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 41 SY | $35.00 | $30.00 | $23.50 | $26.10 | $25.00 | $30.00 |
| 512E44400 TYPE B WATERPROOFING | 12 SY | $70.00 | $20.00 | $43.00 | $55.57 | $80.00 | $60.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 118 SF | $5.00 | $5.00 | $10.38 | $2.84 | $8.00 | $6.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 67 FT | $12.00 | $10.00 | $20.00 | $2.33 | $18.00 | $9.00 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 61 FT | $12.00 | $15.00 | $22.00 | $5.32 | $20.00 | $20.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 14 EACH | $6.00 | $10.00 | $1.00 | $21.60 | $25.00 | $20.00 |
| 516E43201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 28 EACH | $125 | $140 | $150 | $145 | $200 | $175 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $4,000 | $2,000 | $4,000 | $2,952 | $5,000 | $5,500 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 120 FT | $10.00 | $10.00 | $15.00 | $11.04 | $12.00 | $13.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 91 FT | $8.00 | $10.00 | $10.00 | $4.21 | $8.00 | $8.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 46 FT | $8.00 | $10.00 | $15.00 | $4.17 | $8.00 | $20.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $5,400 | $6,000 | $2,676 | $6,200 | $4,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $6,000 | $6,000 | $6,777 | $4,000 | $5,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,500 | $2,500 | $5,000 | $7,248 | $2,900 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E10051 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 7 EACH | $9,800 | $69k | 21% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 65 CY | $500 | $33k | 10% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $14,000 | $14k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 111 FT | $124.29 | $14k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 52 CY | $210.48 | $11k | 3% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 360 FT | $30 | $11k | 3% |
| 304E20000 AGGREGATE BASE | 153 CY | $70 | $11k | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $10,000 | $10k | 3% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 38 CY | $260.6 | $10k | 3% |