DEL-Delaware State Park FY18
DEL County · est $0.9M
Bid dateThursday, March 8—
DEL County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Axis Civil Construction LLC | R3Strawser Paving CO INC | R4Shelly Company | R5Columbus Asphalt Paving INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,522.4 CY | $131 | $138 | $182 | $164 | $200 | 60% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,699 SY | $39.00 | $70.00 | $26.00 | $30.00 | $32.00 | 9% |
| 617E10100 COMPACTED AGGREGATE | 569.8 CY | $95.00 | $95.00 | $53.00 | $124 | $96.00 | 7% |
| 611E04900 |
| Item | Quantity | R1Shelly & Sands INC | R2Axis Civil Construction LLC | R3Strawser Paving CO INC | R4Shelly Company | R5Columbus Asphalt Paving INC |
|---|---|---|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 14 SY | $65.00 | $12.00 | $65.00 | $60.00 | $32.00 |
| 202E30000 WALK REMOVED | 311.8 SF | $1.75 | $4.00 | $3.50 | $5.50 | $4.00 |
| 204E10000 SUBGRADE COMPACTION | 173.2 SY | $5.00 | $2.00 | $9.00 | $5.00 | $2.75 |
| 608E10000 4" CONCRETE WALK | 165.3 SF | $8.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 715 FT |
| $43.00 |
| $42.00 |
| $27.50 |
| $30.00 |
| $105 |
| 4% |
| 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET | 213 EACH | $100 | $45.00 | $32.00 | $50.00 | $25.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $40,000 | $32,000 | $75,000 | 3% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 641 FT | $23.00 | $13.00 | $1.50 | $23.00 | $18.00 | 2% |
| 407E10000 TACK COAT | 7,319.9 GAL | $2.00 | $2.50 | $2.40 | $1.95 | $4.90 | 2% |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 52 EACH | $225 | $140 | $85.00 | $90.00 | $75.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,000 | $21,000 | $1,500 | $40,000 | $50,000 | 1% |
| 644E00300 CENTER LINE | 2.1 MILE | $5,000 | $4,822 | $4,822 | $4,822 | $5,575 | 1% |
| 304E20000 AGGREGATE BASE (8") | 68.7 CY | $130 | $85.00 | $113 | $125 | $92.00 | 1% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 71.2 SY | $122 | $80.00 | $62.00 | $66.00 | $60.00 | 1% |
| 659E00300 TOPSOIL | 23.9 CY | $300 | $35.00 | $75.00 | $145 | $82.00 | 1% |
| 203E20000 EMBANKMENT | 39.1 CY | $180 | $45.00 | $68.00 | $70.00 | $8.00 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,000 | $7,500 | $1,050 | $6,500 | $10,000 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 8.54 CY | $600 | $400 | $211 | $370 | $216 | 1% |
| 690E12150 SPECIAL - ASPHALT REJUVENATING AGENT | 4,885 GAL | $1.00 | $23.50 | $21.25 | $21.25 | $22.50 | 1% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 222.4 SY | $20.00 | $16.00 | $20.00 | $26.50 | $32.00 | 1% |
| 203E10000 EXCAVATION | 60.9 CY | $68.00 | $45.00 | $29.00 | $57.50 | $40.00 | 1% |
| $10.00 |
| $9.00 |
| $11.50 |
| $8.25 |
| 608E52000 CURB RAMP, TYPE A2 | 265.8 SF | $10.00 | $20.00 | $12.00 | $12.50 | $12.00 |
| 617E25000 WATER | 1.5 MGAL | $1.00 | $1.00 | $45.00 | $1.00 | $525 |
| 659E10000 SEEDING AND MULCHING | 214.4 SY | $6.00 | $10.00 | $5.00 | $5.78 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $600 | $750 | $810 | $645 | $1,000 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 756 FT | $1.50 | $1.50 | $1.00 | $2.25 | $4.00 |
| 253E01000 PAVEMENT REPAIR | 14 SY | $110 | $160 | $180 | $84.00 | $95.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 669 FT | $4.00 | $1.00 | $1.00 | $2.25 | $4.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 40 CY | $95.00 | $85.00 | $26.00 | $100 | $92.00 |
| 690E12160 SPECIAL - TESTING | 1 LS | $1.00 | $500 | $300 | $500 | $525 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 98 FT | $22.00 | $20.00 | $19.50 | $12.50 | $17.00 |
| 630E80100 SIGN, FLAT SHEET | 14.67 SF | $40.00 | $30.00 | $36.00 | $50.00 | $21.00 |
| 644E00100 EDGE LINE, 4" | 0.09 MILE | $3,650 | $3,451 | $3,451 | $3,451 | $3,000 |
| 644E00400 CHANNELIZING LINE, 8" | 131 FT | $1.70 | $1.60 | $1.60 | $1.60 | $2.10 |
| 644E00500 STOP LINE | 90 FT | $6.30 | $6.00 | $6.00 | $6.00 | $7.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 484 FT | $1.80 | $1.75 | $1.75 | $1.75 | $3.20 |
| 644E01200 PARKING LOT STALL MARKING | 680 FT | $1.80 | $1.75 | $1.75 | $1.75 | $3.20 |
| 644E01600 HANDICAP SYMBOL MARKING | 6 EACH | $100 | $96.00 | $96.00 | $96.00 | $95.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $7,500 | $6,000 | $5,000 | $7,300 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,522.4 CY | $131 | $461k | 58% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,699 SY | $39 | $66k | 8% |
| 617E10100 COMPACTED AGGREGATE | 569.8 CY | $95 | $54k | 7% |
| 611E04900 12" CONDUIT, TYPE D, 707.33 | 715 FT | $43 | $31k | 4% |
| 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET | 213 EACH | $100 | $21k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 641 FT | $23 | $15k | 2% |
| 407E10000 TACK COAT | 7,319.9 GAL | $2 | $15k | 2% |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 52 EACH | $225 | $12k | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,000 | $11k | 1% |