LOR-SR 10-06.53
LOR County · est $0.6M
Bid dateThursday, May 3—
LOR County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC | R3Barbicas Construction Company INC | R4Shelly Company | R5Ronyak Paving INC | R6Cross-roads Asphalt Recycling INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,292 CY | $140 | $143 | $150 | $145 | $135 | $138 | 37% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 650 CY | $160 | $180 | $150 | $175 | $310 | $285 | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $40,000 | $25,000 |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC | R3Barbicas Construction Company INC | R4Shelly Company | R5Ronyak Paving INC | R6Cross-roads Asphalt Recycling INC |
|---|---|---|---|---|---|---|---|
| 209E60500 LINEAR GRADING | 1.38 MILE | $750 | $1,200 | $1,000 | $2,000 | $2,100 | $1,200 |
| 209E80000 GRADING MAILBOX APPROACHES | 5 EACH | $50.00 | $90.00 | $250 | $100 | $255 | $300 |
| 617E20000 SHOULDER PREPARATION | 1,740 SY | $0.50 | $1.00 | $1.50 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $65,000 |
| $37,000 |
| $50,715 |
| 12% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 30,871 SY | $1.50 | $1.20 | $3.00 | $1.45 | $1.25 | $3.00 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $23,200 | $15,000 | $15,000 | $20,000 | $15,125 | $20,000 | 5% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $925 | $925 | $1,050 | $925 | $925 | $850 | 2% |
| 253E02000 PAVEMENT REPAIR | 55 CY | $200 | $210 | $200 | $275 | $555 | $285 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 168 HOUR | $60.00 | $65.00 | $60.00 | $65.00 | $55.00 | $45.00 | 2% |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 6 EACH | $1,000 | $2,200 | $850 | $2,000 | $1,800 | $2,500 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 5 EACH | $1,100 | $1,100 | $1,200 | $1,200 | $1,100 | $1,100 | 1% |
| 617E10100 COMPACTED AGGREGATE | 102 CY | $50.00 | $65.00 | $125 | $70.00 | $68.00 | $60.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,479 GAL | $2.00 | $2.20 | $3.50 | $2.50 | $2.20 | $3.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $5,000 | $5,000 | $1,500 | $5,500 | $4,000 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $500 | $1,750 | $600 | $2,000 | $1,500 | $1,000 | 1% |
| AA1 642E00104 EDGE LINE, 6", TYPE 1 (ALTERNATE 1) | 3.34 MILE | $650 | $650 | $750 | $650 | $590 | $590 | 0% |
| 254E01600 PATCHING PLANED SURFACE | 159 SY | $10.00 | $0.50 | $4.00 | $1.00 | $2.50 | $10.00 | 0% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $750 | $750 | $550 | $800 | $600 | $1,200 | 0% |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2 MILE | $750 | $750 | $1,145 | $750 | $500 | $500 | 0% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.66 MILE | $900 | $900 | $1,405 | $900 | $800 | $800 | 0% |
| 408E10001 PRIME COAT, AS PER PLAN | 696 GAL | $2.00 | $4.00 | $4.25 | $3.00 | $4.00 | $5.00 | 0% |
| $1.00 |
| $1.25 |
| AA1 642E00204 LANE LINE, 6", TYPE 1 (ALTERNATE 1) | 1 MILE | $600 | $600 | $635 | $600 | $490 | $490 |
| AA1 642E00300 CENTER LINE, TYPE 1 (ALTERNATE 1) | 0.83 MILE | $1,150 | $1,150 | $895 | $1,150 | $800 | $800 |
| AA1 642E00400 CHANNELIZING LINE, 8", TYPE 1 (ALTERNATE 1) | 472 FT | $0.75 | $0.75 | $1.00 | $0.75 | $0.85 | $0.85 |
| AA1 642E00500 STOP LINE, TYPE 1 (ALTERNATE 1) | 204 FT | $3.85 | $3.85 | $4.50 | $3.85 | $3.00 | $3.00 |
| AA1 642E01300 LANE ARROW, TYPE 1 (ALTERNATE 1) | 7 EACH | $50.00 | $50.00 | $55.00 | $50.00 | $50.00 | $50.00 |
| 614E12460 WORK ZONE MARKING SIGN | 12 EACH | $90.00 | $90.00 | $75.00 | $90.00 | $90.00 | $70.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $50.00 | $110 | $125 | $110 | $200 | $300 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 944 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.85 | $0.85 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 306 FT | $2.95 | $2.95 | $2.40 | $2.95 | $3.00 | $3.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $1,200 | $500 | $1,500 | $2,000 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,292 CY | $140 | $181k | 37% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 650 CY | $160 | $104k | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $60k | 12% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 30,871 SY | $1.5 | $46k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $23,200 | $23k | 5% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $925 | $11k | 2% |
| 253E02000 PAVEMENT REPAIR | 55 CY | $200 | $11k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 168 HOUR | $60 | $10k | 2% |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 6 EACH | $1,000 | $6k | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 5 EACH | $1,100 | $6k | 1% |