BRO-CR 13-03.30
BRO County · est $1.8M
Bid dateThursday, October 11—
BRO County · est $1.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 87 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2D G M INC | R3Shelly & Sands INC | R4John R Jurgensen Company | R5Eagle Bridge CO | R6Allard Excavation LLC | R7Sunesis Construction CO | R8Complete General Construction Company | R9Great Lakes Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 105,911 LB | $1.95 | $1.70 | $1.75 | $1.68 | $1.90 | $2.04 | $1.86 | $1.50 | $1.57 | 17% |
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 36 FT | $3,000 |
| Item | Quantity | R1Kokosing Construction Company INC | R2D G M INC | R3Shelly & Sands INC | R4John R Jurgensen Company | R5Eagle Bridge CO | R6Allard Excavation LLC | R7Sunesis Construction CO | R8Complete General Construction Company | R9Great Lakes Construction CO |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $35,000 | $16,000 | $17,440 | $30,000 | $33,700 | $24,800 | $35,000 | $60,000 |
| 202E23000 PAVEMENT REMOVED | 1,745 SY | $7.00 | $8.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $5,100 |
| $3,500 |
| $3,301 |
| $3,000 |
| $3,471 |
| $4,548 |
| $3,500 |
| $3,200 |
| 9% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 179 CY | $600 | $900 | $725 | $1,248 | $1,000 | $1,088 | $1,040 | $840 | $1,100 | 9% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 189 CY | $525 | $400 | $484 | $697 | $500 | $400 | $592 | $700 | $850 | 8% |
| 203E20001 EMBANKMENT, AS PER PLAN | 4,144 CY | $23.00 | $15.00 | $16.00 | $14.02 | $15.00 | $12.80 | $25.37 | $21.00 | $20.00 | 8% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 67,788 LB | $1.16 | $1.00 | $0.96 | $0.94 | $1.00 | $1.60 | $1.05 | $1.00 | $1.25 | 6% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 351 FT | $150 | $155 | $158 | $224 | $142 | $220 | $220 | $160 | $142 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 373 CY | $130 | $162 | $170 | $154 | $130 | $168 | $155 | $168 | $168 | 4% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 550 CY | $85.00 | $50.00 | $28.00 | $106 | $75.00 | $56.18 | $94.05 | $70.00 | $90.00 | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 92 CY | $500 | $850 | $610 | $586 | $900 | $557 | $868 | $150 | $1,500 | 4% |
| 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 35 CY | $1,150 | $800 | $1,285 | $1,039 | $1,000 | $1,695 | $1,352 | $990 | $1,500 | 3% |
| 253E01000 PAVEMENT REPAIR | 500 SY | $80.00 | $23.28 | $62.00 | $77.88 | $50.12 | $61.00 | $23.48 | $61.00 | $61.00 | 3% |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $40,000 | $4,000 | $17,000 | $25,127 | $100,000 | $7,552 | $38,838 | $64,000 | $160,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | $100,000 | $180,930 | $67,116 | $100,000 | $100,000 | 3% |
| 304E20000 AGGREGATE BASE | 638 CY | $55.00 | $42.00 | $85.00 | $49.96 | $60.00 | $41.90 | $62.15 | $75.00 | $56.00 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 30,280 LB | $1.15 | $1.25 | $0.80 | $0.94 | $1.00 | $0.74 | $1.12 | $0.85 | $1.25 | 3% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 807 CY | $40.00 | $40.00 | $47.00 | $45.59 | $45.00 | $41.00 | $53.70 | $70.00 | $38.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 200 CY | $160 | $175 | $195 | $178 | $160 | $191 | $175 | $191 | $191 | 3% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 142 FT | $225 | $225 | $186 | $187 | $150 | $185 | $149 | $375 | $255 | 3% |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $30,000 | $5,000 | $14,000 | $9,386 | $10,000 | $12,200 | $5,361 | $65,000 | $50,000 | 2% |
| $9.00 |
| $5.61 |
| $5.50 |
| $3.06 |
| $8.84 |
| $9.00 |
| $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 31 FT | $6.00 | $12.00 | $11.00 | $52.76 | $7.50 | $5.28 | $8.70 | $30.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 20 FT | $6.00 | $1.00 | $13.00 | $9.95 | $8.00 | $3.00 | $12.52 | $4.50 | $4.50 |
| 202E53100 MAILBOX REMOVED | 2 EACH | $60.00 | $50.00 | $65.00 | $199 | $50.00 | $45.00 | $47.26 | $15.00 | $60.00 |
| 202E75000 FENCE REMOVED | 353 FT | $1.70 | $2.00 | $5.00 | $6.76 | $3.50 | $0.50 | $3.06 | $3.50 | $2.00 |
| 202E98000 REMOVAL MISC.:STACKED STONE WALL | 1 LS | $500 | $300 | $800 | $1,205 | $1,500 | $615 | $712 | $5,000 | $1,000 |
| 203E10000 EXCAVATION | 1,971 CY | $13.00 | $15.00 | $10.50 | $14.84 | $9.00 | $10.36 | $18.82 | $13.00 | $7.50 |
| 203E20000 EMBANKMENT | 1,708 CY | $6.00 | $15.00 | $8.00 | $12.35 | $12.00 | $5.10 | $15.70 | $15.00 | $7.20 |
| 204E10000 SUBGRADE COMPACTION | 3,471 SY | $2.00 | $4.00 | $2.70 | $3.03 | $3.00 | $2.50 | $2.68 | $4.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 807 CY | $6.50 | $15.00 | $12.00 | $14.01 | $12.00 | $13.14 | $28.60 | $18.00 | $22.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $150 | $75.00 | $165 | $182 | $150 | $91.64 | $195 | $250 | $300 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN | 2,421 SY | $1.25 | $1.00 | $1.00 | $2.55 | $1.00 | $0.92 | $0.93 | $5.00 | $1.25 |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $18.60 | $44.00 | $41.00 | $21.00 | $18.64 | $21.00 | $21.00 | $18.60 | $18.60 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $1,795 | $1,800 | $1,800 | $1,900 | $1,799 | $1,900 | $1,900 | $1,795 | $1,795 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 OR MASH 2016 | 3 EACH | $2,220 | $2,350 | $2,350 | $2,250 | $2,225 | $2,250 | $2,250 | $2,220 | $2,220 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $865 | $1,000 | $1,000 | $1,100 | $867 | $1,100 | $1,100 | $865 | $865 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,985 | $2,300 | $2,300 | $2,100 | $1,990 | $2,100 | $2,100 | $1,985 | $1,985 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $200 | $150 | $155 | $309 | $266 | $200 | $203 | $265 | $265 |
| 690E50600 SPECIAL - BOLLARD | 4 EACH | $420 | $525 | $525 | $600 | $421 | $600 | $600 | $420 | $420 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $25,000 | $10,000 | $19,000 | $23,004 | $25,000 | $16,188 | $13,875 | $21,250 | $42,000 |
| 601E26000 DUMPED ROCK FILL, TYPE B | 189 CY | $50.00 | $55.00 | $30.00 | $108 | $75.00 | $55.36 | $82.69 | $75.00 | $80.00 |
| 659E00300 TOPSOIL | 599 CY | $30.00 | $12.00 | $29.00 | $39.20 | $5.00 | $19.20 | $29.23 | $25.00 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 4,284 SY | $0.94 | $2.00 | $0.95 | $0.94 | $2.00 | $1.25 | $1.98 | $0.94 | $1.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 215 SY | $0.94 | $0.05 | $0.95 | $0.94 | $2.00 | $0.05 | $1.00 | $0.94 | $1.45 |
| 659E20000 COMMERCIAL FERTILIZER | 0.58 TON | $650 | $300 | $655 | $650 | $1,250 | $500 | $500 | $650 | $750 |
| 659E31000 LIME | 0.89 ACRE | $75.00 | $80.00 | $76.00 | $75.00 | $10.00 | $200 | $200 | $75.00 | $200 |
| 659E35000 WATER | 23.7 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,105 SY | $2.20 | $2.50 | $2.10 | $2.20 | $3.00 | $1.95 | $1.95 | $2.20 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $4,000 | $1,250 | $4,635 | $11,000 | $5,400 | $16,380 | $1,500 | $2,715 |
| 832E30000 EROSION CONTROL | 8,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $28,500 | $9,000 | $12,000 | $4,943 | $6,500 | $7,500 | $19,980 | $34,900 | $6,400 |
| 602E20000 CONCRETE MASONRY | 0.54 CY | $2,250 | $1,500 | $3,020 | $2,898 | $2,000 | $3,890 | $2,654 | $3,000 | $2,800 |
| 605E31100 AGGREGATE DRAINS | 246 FT | $8.00 | $12.00 | $15.00 | $11.77 | $8.00 | $8.20 | $7.51 | $15.00 | $13.00 |
| 611E05900 15" CONDUIT, TYPE B | 127 FT | $80.00 | $85.00 | $98.00 | $107 | $80.00 | $71.20 | $75.48 | $110 | $85.00 |
| 611E06100 15" CONDUIT, TYPE C | 8 FT | $70.00 | $75.00 | $90.00 | $280 | $50.00 | $52.44 | $64.29 | $85.00 | $110 |
| 611E06400 15" CONDUIT, TYPE D | 33 FT | $60.00 | $50.00 | $75.00 | $69.89 | $45.00 | $42.54 | $49.10 | $70.00 | $90.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $2,200 | $1,200 | $3,400 | $1,304 | $1,650 | $1,622 | $1,608 | $2,000 | $1,850 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 28 FT | $27.00 | $12.00 | $7.00 | $3.00 | $2.00 | $5.00 | $12.50 | $15.00 | $4.78 |
| 407E10000 TACK COAT | 358 GAL | $2.00 | $6.00 | $1.85 | $5.00 | $2.00 | $1.85 | $6.00 | $1.85 | $1.85 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 114 CY | $160 | $180 | $220 | $231 | $160 | $215 | $175 | $215 | $215 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (159 CY | $160 | $170 | $180 | $190 | $160 | $177 | $164 | $177 | $177 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, TYPE 3 | 20 EACH | $7.15 | $8.00 | $8.25 | $9.00 | $7.17 | $9.00 | $9.00 | $7.15 | $7.15 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 90 FT | $12.00 | $14.00 | $12.50 | $11.00 | $12.03 | $11.00 | $11.00 | $12.50 | $12.00 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $30.00 | $50.00 | $41.00 | $45.00 | $30.07 | $45.00 | $45.00 | $40.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $15.00 | $15.00 | $15.50 | $25.00 | $15.03 | $25.00 | $25.00 | $10.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $40.00 | $50.00 | $52.00 | $70.00 | $40.09 | $70.00 | $70.00 | $65.00 | $40.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 2 EACH | $65.00 | $550 | $220 | $80.50 | $65.15 | $80.50 | $80.50 | $195 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $20.00 | $15.00 | $15.50 | $60.00 | $20.05 | $60.00 | $60.00 | $10.00 | $20.00 |
| 642E00290 CENTER LINE | 0.26 MILE | $4,905 | $5,500 | $5,000 | $4,905 | $4,916 | $4,905 | $4,905 | $4,905 | $4,905 |
| 642E00490 STOP LINE | 12 FT | $25.00 | $25.00 | $25.50 | $25.00 | $25.06 | $25.00 | $25.00 | $25.00 | $25.00 |
| 407E10000 TACK COAT | 100 GAL | $2.00 | $4.00 | $1.85 | $3.00 | $2.00 | $1.85 | $6.00 | $1.85 | $1.85 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 18 CY | $81.00 | $40.00 | $60.00 | $187 | $65.00 | $44.19 | $64.79 | $75.00 | $70.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $35.50 | $50.00 | $72.00 | $79.96 | $65.00 | $75.00 | $65.00 | $80.00 | $70.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,225 | $5,250 | $5,200 | $3,990 | $5,500 | $4,985 | $3,990 | $7,500 | $4,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $160 | $120 | $170 | $356 | $160 | $230 | $185 | $150 | $280 |
| 616E10000 WATER | 14.9 MGAL | $65.00 | $1.00 | $38.00 | $78.42 | $10.00 | $1.00 | $9.09 | $45.00 | $50.00 |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $5,000 | $27,500 | $40,000 | $11,881 | $20,000 | $7,110 | $14,947 | $20,000 | $50,000 |
| 202E23500 WEARING COURSE REMOVED | 55 SY | $20.00 | $8.00 | $10.00 | $9.22 | $15.00 | $5.49 | $5.47 | $115 | $10.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $5,000 | $36,000 | $9,771 | $15,000 | $11,027 | $22,563 | $80,000 | $37,110 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 121 CY | $165 | $400 | $620 | $354 | $350 | $280 | $314 | $445 | $500 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 6 CY | $800 | $1,400 | $1,950 | $1,715 | $2,000 | $1,455 | $1,415 | $1,200 | $2,200 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 131 SY | $22.00 | $27.00 | $26.00 | $22.00 | $30.00 | $22.00 | $25.00 | $22.00 | $22.00 |
| 512E33000 TYPE 2 WATERPROOFING | 238 SY | $20.00 | $14.00 | $24.00 | $33.37 | $19.00 | $23.00 | $23.00 | $25.00 | $19.57 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 120 SF | $3.50 | $12.00 | $4.50 | $5.92 | $6.00 | $1.97 | $3.03 | $10.00 | $12.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 49 CY | $80.00 | $75.00 | $110 | $120 | $90.00 | $74.21 | $75.10 | $125 | $100 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $3,500 | $4,500 | $3,020 | $4,405 | $4,250 | $4,650 | $2,084 | $5,000 | $3,700 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $16,574 | $30,000 | $70,000 | $27,524 | $40,000 | $20,800 | $19,216 | $65,000 | $94,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 345 SY | $22.00 | $25.00 | $26.00 | $22.00 | $25.00 | $22.00 | $26.42 | $22.00 | $22.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,424 EACH | $3.95 | $4.00 | $3.70 | $3.25 | $3.00 | $3.25 | $3.84 | $3.25 | $3.25 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 41 SF | $6.00 | $20.00 | $10.50 | $6.90 | $10.00 | $4.40 | $4.89 | $11.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 57 FT | $40.00 | $45.00 | $36.00 | $41.72 | $45.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 8 EACH | $900 | $700 | $960 | $693 | $900 | $686 | $749 | $585 | $800 |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 8 EACH | $800 | $700 | $960 | $652 | $900 | $686 | $705 | $550 | $800 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 92 CY | $80.00 | $70.00 | $97.00 | $115 | $90.00 | $63.70 | $72.42 | $100 | $90.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 415 FT | $10.00 | $12.00 | $16.00 | $14.59 | $12.00 | $8.85 | $14.82 | $15.00 | $12.67 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 151 FT | $6.50 | $12.00 | $5.30 | $3.15 | $12.00 | $4.11 | $2.50 | $10.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $30.00 | $12.00 | $5.30 | $11.29 | $12.00 | $4.70 | $3.28 | $15.00 | $30.00 |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 80 FT | $225 | $400 | $359 | $210 | $350 | $220 | $608 | $350 | $950 |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 84 FT | $275 | $505 | $112 | $255 | $500 | $246 | $501 | $350 | $750 |
| 524E94802 DRILLED SHAFTS, 42" DIAMETER, ABOVE BEDROCK | 43 FT | $275 | $285 | $586 | $253 | $275 | $244 | $186 | $375 | $400 |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 120 SY | $200 | $160 | $227 | $460 | $225 | $205 | $253 | $250 | $280 |
| 526E90010 TYPE A INSTALLATION | 53 FT | $125 | $180 | $156 | $292 | $150 | $277 | $109 | $250 | $210 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $40,000 | $12,000 | $1,709 | $22,500 | $75,860 | $11,974 | $20,000 | $24,220 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $50,000 | $3,800 | $5,448 | $7,500 | $29,075 | $3,575 | $19,000 | $20,000 |
| 619E16000 FIELD OFFICE, TYPE A | 8 MNTH | $3,500 | $800 | $2,600 | $1,385 | $1,500 | $1,200 | $1,402 | $1,500 | $2,400 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $12,000 | $25,000 | $15,709 | $25,000 | $31,750 | $19,635 | $9,000 | $24,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 105,911 LB | $1.95 | $207k | 11% |
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 36 FT | $3,000 | $108k | 6% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 179 CY | $600 | $107k | 6% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 189 CY | $525 | $99k | 5% |
| 203E20001 EMBANKMENT, AS PER PLAN | 4,144 CY | $23 | $95k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 67,788 LB | $1.16 | $79k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 351 FT | $150 | $53k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 373 CY | $130 | $48k | 3% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 550 CY | $85 | $47k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 92 CY | $500 | $46k | 3% |