HIG-US 50-21.45 Brdg Replace
HIG County · est $1.0M
Bid dateThursday, November 8—
HIG County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Allard Excavation LLC | R3Shelly & Sands INC | R4Double Z Construction Company | R5D G M INC | R6Alan Stone CO INC | R7Axis Civil Construction LLC | R8Complete General Construction Company | R9Distel Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E96461 20' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN | 98 FT | $1,726 | $1,789 | $2,675 | $2,200 | $2,450 | $1,900 | $2,400 | $2,400 | $1,894 | 20% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,089 CY | $148 |
| Item | Quantity | R1John R Jurgensen Company | R2Allard Excavation LLC | R3Shelly & Sands INC | R4Double Z Construction Company | R5D G M INC | R6Alan Stone CO INC | R7Axis Civil Construction LLC | R8Complete General Construction Company | R9Distel Construction INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,297 | $32,720 | $5,800 | $6,400 | $24,000 | $10,000 | $20,000 | $14,000 | $13,288 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 64 FT | $16.11 | $3.25 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $138 |
| $138 |
| $138 |
| $145 |
| $145 |
| $176 |
| $175 |
| $201 |
| 19% |
| 203E20000 EMBANKMENT | 6,651 CY | $12.03 | $11.00 | $8.00 | $16.00 | $12.00 | $18.00 | $21.00 | $12.00 | $25.00 | 10% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 354 CY | $194 | $181 | $181 | $181 | $190 | $190 | $205 | $210 | $242 | 8% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 100 CY | $404 | $343 | $425 | $425 | $375 | $481 | $450 | $275 | $722 | 5% |
| 659E00300 TOPSOIL | 1,153 CY | $34.42 | $11.50 | $10.00 | $20.00 | $10.00 | $39.00 | $32.00 | $25.00 | $30.00 | 5% |
| 304E20000 AGGREGATE BASE | 768 CY | $51.40 | $39.00 | $45.00 | $55.00 | $36.00 | $44.00 | $58.00 | $50.00 | $50.00 | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 35 CY | $847 | $580 | $800 | $980 | $800 | $638 | $1,250 | $1,100 | $1,340 | 4% |
| 613E41251 LOW STRENGTH MORTAR BACKFILL (TYPE 1), AS PER PLAN | 287 CY | $95.50 | $95.50 | $75.00 | $76.73 | $75.00 | $83.00 | $95.50 | $125 | $100 | 3% |
| 203E10000 EXCAVATION | 2,871 CY | $8.81 | $4.50 | $9.00 | $10.00 | $12.00 | $19.00 | $15.00 | $16.00 | $17.00 | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $21,809 | $3,000 | $19,000 | $21,000 | $25,000 | $22,484 | $20,000 | $60,000 | $4,000 | 3% |
| 832E30000 EROSION CONTROL | 21,082 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $70,500 | $40,000 | $50,000 | $40,000 | $60,000 | $40,000 | $40,000 | $26,350 | 2% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $395 | $480 | $480 | $200 | $460 | $504 | $200 | $205 | $50.00 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 10,962 LB | $1.25 | $1.50 | $1.00 | $1.25 | $1.50 | $1.05 | $1.65 | $1.70 | $2.00 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 3,018 SY | $4.53 | $4.64 | $2.25 | $9.00 | $3.00 | $7.50 | $5.00 | $7.00 | $8.00 | 2% |
| 605E31100 AGGREGATE DRAINS | 427 FT | $27.56 | $5.10 | $10.75 | $9.00 | $12.00 | $24.00 | $12.00 | $15.00 | $15.00 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $11,746 | $12,500 | $18,000 | $25,000 | $3,000 | $20,287 | $15,000 | $12,000 | $5,000 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,083 | $30,000 | $7,500 | $5,000 | $25,000 | $6,500 | $15,000 | $30,000 | $10,000 | 1% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $10,000 | $12,500 | $8,000 | $12,000 | $9,000 | $21,000 | $18,000 | $20,000 | $18,000 | 1% |
| $4.25 |
| $15.00 |
| $12.00 |
| $21.00 |
| $20.00 |
| $19.00 |
| $10.00 |
| 202E38000 GUARDRAIL REMOVED | 932 FT | $1.80 | $4.50 | $1.90 | $1.80 | $1.00 | $3.00 | $3.00 | $4.50 | $2.10 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $200 | $125 | $285 | $200 | $250 | $126 | $300 | $125 | $230 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $75.00 | $125 | $160 | $75.00 | $250 | $222 | $300 | $125 | $87.00 |
| 202E75000 FENCE REMOVED | 2,201 FT | $3.52 | $4.00 | $2.40 | $0.80 | $2.00 | $1.50 | $4.00 | $3.00 | $2.25 |
| 204E10000 SUBGRADE COMPACTION | 4,711 SY | $1.78 | $2.50 | $1.50 | $1.50 | $2.00 | $2.50 | $2.00 | $2.56 | $2.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $174 | $75.00 | $203 | $170 | $60.00 | $170 | $200 | $300 | $200 |
| 623E40500 REFERENCE MONUMENT | 8 EACH | $200 | $360 | $900 | $400 | $250 | $668 | $700 | $300 | $200 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $150 | $173 | $385 | $200 | $150 | $205 | $250 | $385 | $150 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 218 CY | $29.98 | $40.73 | $27.50 | $53.00 | $35.00 | $58.00 | $55.00 | $38.00 | $120 |
| 659E10000 SEEDING AND MULCHING | 7,667 SY | $0.86 | $0.80 | $0.79 | $0.86 | $1.50 | $1.50 | $0.86 | $0.86 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 383 SY | $0.86 | $0.40 | $0.69 | $0.86 | $0.05 | $1.50 | $0.86 | $0.86 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.04 TON | $605 | $500 | $665 | $605 | $600 | $500 | $605 | $605 | $696 |
| 659E31000 LIME | 1.58 ACRE | $70.00 | $100 | $154 | $70.00 | $80.00 | $300 | $70.00 | $70.00 | $80.50 |
| 659E35000 WATER | 41 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 |
| 670E00500 SLOPE EROSION PROTECTION | 2,721 SY | $2.25 | $1.95 | $1.40 | $2.25 | $2.50 | $4.00 | $2.25 | $2.25 | $2.60 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $8,085 | $3,600 | $1,500 | $1,500 | $5,000 | $5,000 | $1,500 | $8,000 | $5,938 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,258 | $6,600 | $8,500 | $12,000 | $15,000 | $7,600 | $18,000 | $7,000 | $12,162 |
| 602E20000 CONCRETE MASONRY | 0.33 CY | $6,097 | $3,350 | $3,400 | $2,800 | $1,500 | $2,641 | $2,500 | $2,000 | $2,500 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $25.95 | $10.25 | $14.00 | $10.00 | $4.00 | $34.00 | $10.00 | $15.00 | $25.00 |
| 611E06400 15" CONDUIT, TYPE D | 63 FT | $39.60 | $58.00 | $35.00 | $43.00 | $65.00 | $75.00 | $41.00 | $80.00 | $50.00 |
| 611E07900 18" CONDUIT, TYPE D | 40 FT | $43.70 | $61.40 | $32.00 | $46.00 | $80.00 | $92.00 | $45.00 | $90.00 | $70.00 |
| 407E10000 TACK COAT | 254 GAL | $12.34 | $1.95 | $1.95 | $1.95 | $1.95 | $2.50 | $5.00 | $6.00 | $7.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 22 CY | $145 | $48.50 | $95.00 | $90.00 | $100 | $132 | $100 | $75.00 | $60.00 |
| 621E00100 RPM | 14 EACH | $130 | $250 | $162 | $130 | $375 | $171 | $375 | $375 | $288 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $18.82 | $9.00 | $5.50 | $8.00 | $1.00 | $12.00 | $20.00 | $8.00 | $25.00 |
| 642E00094 EDGE LINE, 6" | 0.39 MILE | $2,440 | $4,000 | $4,130 | $2,440 | $4,500 | $4,335 | $4,000 | $4,000 | $4,600 |
| 642E00290 CENTER LINE | 0.19 MILE | $4,286 | $8,000 | $4,155 | $4,286 | $8,500 | $4,361 | $8,000 | $8,000 | $9,200 |
| 407E10000 TACK COAT | 60 GAL | $22.51 | $1.95 | $1.95 | $1.95 | $1.95 | $2.50 | $5.00 | $3.50 | $4.50 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 25 CY | $348 | $435 | $435 | $190 | $415 | $457 | $200 | $190 | $50.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $59.10 | $75.00 | $65.00 | $65.00 | $40.00 | $65.00 | $75.00 | $85.00 | $100 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,222 | $4,575 | $6,590 | $7,000 | $5,000 | $6,917 | $4,575 | $4,575 | $5,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $178 | $210 | $435 | $125 | $120 | $504 | $140 | $270 | $50.00 |
| 616E10000 WATER | 30 MGAL | $38.72 | $1.00 | $20.00 | $10.00 | $1.00 | $1.50 | $1.00 | $65.00 | $2.00 |
| 642E00290 CENTER LINE | 1 MILE | $1,000 | $2,000 | $1,740 | $1,000 | $1,500 | $1,827 | $2,000 | $2,000 | $2,300 |
| 202E23500 WEARING COURSE REMOVED | 103 SY | $21.41 | $5.00 | $18.00 | $10.00 | $8.00 | $40.00 | $6.00 | $17.00 | $10.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 274 CY | $11.62 | $11.00 | $25.00 | $60.00 | $8.00 | $36.00 | $55.00 | $35.00 | $20.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 4 CY | $1,597 | $1,020 | $1,275 | $1,600 | $1,500 | $50.00 | $1,250 | $1,000 | $1,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 111 SY | $25.00 | $25.00 | $25.50 | $25.00 | $35.00 | $29.00 | $25.00 | $25.50 | $27.00 |
| 512E33000 TYPE 2 WATERPROOFING | 534 SY | $17.00 | $17.00 | $22.50 | $17.00 | $12.00 | $13.00 | $16.00 | $22.50 | $17.85 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 70 SF | $4.56 | $2.35 | $1.50 | $8.00 | $13.00 | $7.00 | $4.00 | $9.68 | $15.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 21 CY | $85.61 | $98.00 | $120 | $115 | $100 | $134 | $220 | $110 | $100 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 217 CY | $29.98 | $40.73 | $27.50 | $53.00 | $35.00 | $58.00 | $55.00 | $38.00 | $120 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,156 | $12,714 | $5,751 | $8,000 | $19,500 | $7,300 | $10,000 | $10,000 | $16,244 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,370 | $1,200 | $2,500 | $1,500 | $800 | $900 | $2,200 | $3,000 | $2,250 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,646 | $8,140 | $20,000 | $10,000 | $20,000 | $12,000 | $6,500 | $41,000 | $17,078 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96461 20' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN | 98 FT | $1,726 | $169k | 17% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,089 CY | $147.7 | $161k | 16% |
| 203E20000 EMBANKMENT | 6,651 CY | $12.03 | $80k | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 354 CY | $193.81 | $69k | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 100 CY | $403.86 | $40k | 4% |
| 659E00300 TOPSOIL | 1,153 CY | $34.42 | $40k | 4% |
| 304E20000 AGGREGATE BASE | 768 CY | $51.4 | $39k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 35 CY | $847.1 | $30k | 3% |
| 613E41251 LOW STRENGTH MORTAR BACKFILL (TYPE 1), AS PER PLAN | 287 CY | $95.5 | $27k | 3% |
| 203E10000 EXCAVATION | 2,871 CY | $8.81 | $25k | 3% |