ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 52 more items below.
| Item | Quantity | R1Buds INC | R2Bog Construction INC | R3Dennison Bridge INC | R4Americon Industrial Services LLC | R5J Miller & Son Excavating LTD | R6Tucson INC | R7S E T INC | R8Shelly & Sands INC | R9Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E94801 8' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (8 FT | 64 FT | $650 | $575 | $800 | $875 | $795 | $875 | $564 | $1,265 | $705 | 22% |
| 203E20000 EMBANKMENT | 1,167 CY | $14.00 | $10.00 | $23.00 |
| Item | Quantity | R1Buds INC | R2Bog Construction INC | R3Dennison Bridge INC | R4Americon Industrial Services LLC | R5J Miller & Son Excavating LTD | R6Tucson INC | R7S E T INC | R8Shelly & Sands INC | R9Ohio-west Virginia Excavating CO |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $3,000 | $5,000 | $5,000 | $3,441 | $11,000 | $5,497 | $11,750 | $2,500 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $300 | $750 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $12.00 |
| $11.95 |
| $20.00 |
| $7.00 |
| $24.25 |
| $37.00 |
| 9% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $15,000 | $25,000 | $10,000 | $12,000 | $7,744 | $11,000 | $6,378 | $16,000 | $21,000 | 8% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 107 CY | $102 | $120 | $110 | $98.00 | $124 | $130 | $154 | $150 | $200 | 6% |
| 203E10000 EXCAVATION | 767 CY | $14.00 | $10.00 | $12.00 | $10.00 | $15.95 | $15.00 | $8.00 | $23.75 | $25.00 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 35 CY | $300 | $445 | $310 | $295 | $283 | $310 | $440 | $295 | $372 | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 21 CY | $500 | $750 | $500 | $475 | $185 | $600 | $715 | $1,450 | $675 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $12,000 | $20,000 | $3,586 | $15,000 | $52,020 | $10,000 | $10,000 | 5% |
| 611E07200 18" CONDUIT, TYPE A, 706.02 OR 21" CONDUIT, TYPE A | 81 FT | $100 | $75.00 | $200 | $160 | $66.54 | $185 | $114 | $95.00 | $175 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 450 FT | $17.50 | $23.50 | $20.00 | $21.80 | $25.26 | $19.00 | $24.00 | $22.00 | $19.50 | 4% |
| 304E20000 AGGREGATE BASE | 71 CY | $105 | $85.00 | $120 | $65.00 | $97.57 | $125 | $82.00 | $85.00 | $112 | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7 CY | $1,000 | $1,300 | $1,800 | $1,650 | $2,381 | $1,300 | $1,994 | $2,300 | $1,550 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $4,000 | $10,000 | $6,000 | $16,256 | $4,000 | $10,663 | $15,500 | $10,000 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $4,500 | $10,000 | $7,000 | $4,001 | $4,000 | $21,500 | $17,500 | $18,000 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,279 LB | $2.00 | $3.00 | $2.00 | $1.00 | $1.07 | $2.75 | $1.00 | $2.50 | $3.65 | 2% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 4 EACH | $1,050 | $1,250 | $1,200 | $1,195 | $1,519 | $1,200 | $1,315 | $1,200 | $1,225 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 7 CY | $600 | $510 | $650 | $598 | $1,400 | $625 | $550 | $598 | $900 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,000 | $5,000 | $3,600 | $4,750 | $5,645 | $5,250 | $5,225 | $4,200 | $5,500 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (10 CY | $380 | $450 | $400 | $375 | $1,000 | $395 | $468 | $375 | $740 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 26 CY | $130 | $65.00 | $150 | $125 | $110 | $125 | $119 | $128 | $110 | 2% |
| $750 |
| $1,991 |
| $500 |
| $309 |
| $425 |
| $2,500 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 203 SY | $15.00 | $28.00 | $14.00 | $10.00 | $11.34 | $16.00 | $18.00 | $12.50 | $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 81 FT | $25.00 | $30.00 | $25.00 | $20.00 | $18.09 | $20.00 | $6.00 | $12.00 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 507 FT | $2.00 | $2.00 | $2.00 | $1.60 | $7.02 | $2.50 | $2.00 | $1.60 | $5.00 |
| 202E75000 FENCE REMOVED | 231 FT | $0.25 | $4.00 | $5.00 | $4.50 | $7.34 | $6.00 | $5.00 | $4.50 | $5.00 |
| 204E10000 SUBGRADE COMPACTION | 223 SY | $4.00 | $3.00 | $3.00 | $1.50 | $5.66 | $4.00 | $6.00 | $6.50 | $5.00 |
| 601E11000 RIPRAP, TYPE D | 17 SY | $130 | $170 | $275 | $200 | $78.86 | $110 | $127 | $300 | $125 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 1 CY | $150 | $250 | $250 | $350 | $626 | $650 | $257 | $775 | $525 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $10.00 | $50.00 | $50.00 | $100 | $951 | $100 | $165 | $55.00 | $350 |
| 659E00300 TOPSOIL | 155 CY | $5.00 | $30.00 | $20.00 | $30.00 | $49.78 | $38.00 | $55.00 | $21.50 | $40.00 |
| 659E10000 SEEDING AND MULCHING | 1,393 SY | $2.00 | $4.00 | $3.00 | $2.50 | $3.29 | $2.50 | $2.00 | $2.25 | $4.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 70 SY | $0.10 | $1.00 | $3.00 | $2.50 | $3.87 | $2.00 | $0.44 | $0.40 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.19 TON | $750 | $750 | $1,000 | $650 | $1,059 | $2,000 | $468 | $425 | $1,200 |
| 659E31000 LIME | 0.29 ACRE | $200 | $200 | $500 | $120 | $703 | $2,000 | $110 | $100 | $1,000 |
| 659E35000 WATER | 8 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $26.04 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.8 CY | $1,400 | $2,500 | $2,500 | $1,500 | $700 | $3,200 | $2,366 | $2,300 | $4,750 |
| 605E31100 AGGREGATE DRAINS | 112 FT | $15.00 | $10.00 | $25.00 | $12.50 | $19.24 | $20.00 | $19.00 | $13.25 | $35.00 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $2.50 | $4.00 | $5.00 | $20.00 | $12.40 | $20.00 | $47.00 | $17.00 | $50.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $2.25 | $4.00 | $5.00 | $20.00 | $14.15 | $20.00 | $39.00 | $15.00 | $50.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $2.00 | $4.00 | $5.00 | $20.00 | $16.02 | $20.00 | $17.00 | $15.00 | $50.00 |
| 407E10000 TACK COAT | 11 GAL | $2.00 | $25.00 | $10.00 | $2.00 | $8.67 | $3.00 | $12.00 | $2.00 | $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 63 GAL | $1.00 | $20.00 | $20.00 | $17.50 | $12.71 | $19.00 | $14.00 | $17.50 | $5.00 |
| 621E00100 RPM | 1 EACH | $1,000 | $1,500 | $500 | $1,280 | $5,942 | $5,250 | $1,408 | $1,280 | $2,500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1 EACH | $5.00 | $500 | $50.00 | $10.00 | $61.04 | $200 | $28.00 | $11.75 | $400 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 8 EACH | $8.00 | $10.00 | $10.00 | $8.00 | $9.50 | $10.00 | $7.00 | $6.25 | $30.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 9 FT | $12.00 | $25.00 | $10.00 | $17.00 | $34.23 | $15.00 | $10.00 | $17.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 26 FT | $12.00 | $25.00 | $10.00 | $19.50 | $23.69 | $15.00 | $11.00 | $19.50 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $45.00 | $100 | $45.00 | $50.00 | $69.43 | $50.00 | $28.00 | $50.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $50.00 | $100 | $50.00 | $55.00 | $72.01 | $50.00 | $55.00 | $55.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $25.00 | $25.00 | $10.00 | $31.55 | $20.00 | $11.00 | $10.00 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.02 MILE | $20,000 | $50,000 | $30,000 | $25,000 | $17,325 | $28,000 | $27,500 | $25,000 | $29,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $20,000 | $25,000 | $45,000 | $50,000 | $23,100 | $57,000 | $55,000 | $50,000 | $60,000 |
| 407E10000 TACK COAT | 15 GAL | $2.00 | $20.00 | $10.00 | $3.00 | $2.89 | $2.30 | $2.00 | $2.00 | $5.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $2.00 | $50.00 | $50.00 | $60.00 | $108 | $100 | $67.00 | $60.00 | $190 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 10 CY | $150 | $50.00 | $50.00 | $60.00 | $106 | $100 | $37.00 | $62.00 | $190 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 10 CY | $150 | $250 | $150 | $225 | $1,400 | $450 | $660 | $290 | $500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $150 | $150 | $150 | $225 | $541 | $450 | $146 | $275 | $350 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.01 MILE | $20,000 | $25,000 | $15,000 | $50,000 | $24,770 | $57,500 | $55,000 | $20,000 | $60,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.02 MILE | $20,000 | $25,000 | $10,000 | $25,000 | $18,160 | $28,750 | $27,500 | $15,000 | $30,000 |
| 616E10000 WATER | 15 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $26.04 | $1.00 | $2.00 | $40.00 | $5.00 |
| 617E10100 COMPACTED AGGREGATE | 15 CY | $65.00 | $50.00 | $50.00 | $60.00 | $93.74 | $110 | $235 | $225 | $160 |
| 617E25000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $26.04 | $1.00 | $438 | $65.00 | $5.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,500 | $2,000 | $3,000 | $3,000 | $1,872 | $1,400 | $5,201 | $2,725 | $4,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 34 SY | $35.00 | $30.00 | $20.00 | $60.00 | $119 | $17.00 | $28.00 | $50.00 | $60.00 |
| 512E33000 TYPE 2 WATERPROOFING | 154 SY | $17.00 | $25.00 | $12.00 | $20.00 | $15.44 | $22.00 | $8.00 | $22.50 | $30.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $15.00 | $10.00 | $5.00 | $10.00 | $17.23 | $12.00 | $10.00 | $2.00 | $30.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 4 CY | $125 | $150 | $120 | $150 | $103 | $300 | $88.00 | $300 | $335 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $6,500 | $3,500 | $7,500 | $5,542 | $5,000 | $5,382 | $2,150 | $6,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,000 | $3,500 | $5,000 | $15,000 | $5,283 | $7,500 | $5,199 | $2,500 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $2,500 | $4,000 | $15,000 | $3,565 | $8,500 | $3,300 | $8,750 | $3,350 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94801 8' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (8 FT | 64 FT | $650 | $42k | 18% |
| 203E20000 EMBANKMENT | 1,167 CY | $14 | $16k | 7% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $15,000 | $15k | 6% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 107 CY | $102 | $11k | 5% |
| 203E10000 EXCAVATION | 767 CY | $14 | $11k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 35 CY | $300 | $11k | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 21 CY | $500 | $11k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 611E07200 18" CONDUIT, TYPE A, 706.02 OR 21" CONDUIT, TYPE A | 81 FT | $100 | $8k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 450 FT | $17.5 | $8k | 3% |