CLI-/WAR-SR 350-08.97/01.56
CLI County · est $0.3M
Bid dateThursday, March 26—
CLI County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Coopers Excavating LLC | R2Fillmore Construction | R3Barrett Paving Materials INC | R4Rack & Ballauer Excavating CO INC | R5Sunesis Construction CO | R6Heavy Highway Construction Company | R7Eclipse CO LLC | R8Axis Civil Construction LLC | R9John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $45,000 | $4,000 | $2,000 | $3,000 | $2,210 | $4,000 | $9,500 | $3,500 | $2,498 | 19% |
| 602E20000 CONCRETE MASONRY | 40.3 CY |
| Item | Quantity | R1Coopers Excavating LLC | R2Fillmore Construction | R3Barrett Paving Materials INC | R4Rack & Ballauer Excavating CO INC | R5Sunesis Construction CO | R6Heavy Highway Construction Company | R7Eclipse CO LLC | R8Axis Civil Construction LLC | R9John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $3,500 | $11,400 | $5,500 | $8,022 | $8,485 | $16,794 | $10,000 | $5,039 |
| 202E20010 HEADWALL REMOVED | 4 EACH | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $750 |
| $750 |
| $825 |
| $1,100 |
| $893 |
| $1,008 |
| $1,021 |
| $2,250 |
| $1,167 |
| 13% |
| 611E53000 38" X 60" CONDUIT, TYPE A, 706.04 | 41 FT | $625 | $700 | $475 | $675 | $559 | $558 | $409 | $750 | $690 | 11% |
| 611E22200 54" CONDUIT, TYPE A | 74 FT | $275 | $300 | $375 | $478 | $404 | $296 | $260 | $550 | $455 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $10,000 | $10,000 | $26,050 | $37,945 | $15,000 | $31,141 | $40,000 | $10,000 | 8% |
| 203E10000 EXCAVATION | 244 CY | $50.00 | $30.00 | $25.00 | $29.00 | $21.67 | $44.13 | $27.50 | $40.00 | $56.00 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 25 CY | $450 | $260 | $300 | $315 | $500 | $390 | $600 | $560 | $601 | 5% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $18,330 | $17,750 | $14,000 | $3,500 | $18,150 | $21,000 | $8,300 | $13,330 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 16 CY | $475 | $300 | $194 | $503 | $500 | $430 | $910 | $750 | $871 | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,500 | $5,500 | $8,750 | $7,780 | $9,622 | $9,344 | $3,721 | $6,000 | $14,557 | 3% |
| 659E00300 TOPSOIL | 296 CY | $25.00 | $20.00 | $50.00 | $30.00 | $74.16 | $39.68 | $41.00 | $39.00 | $60.58 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $225 | $300 | $200 | $130 | $500 | $430 | $600 | $350 | $916 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $19.75 | $4.00 | $19.75 | $19.75 | $19.75 | $19.75 | $21.00 | $19.75 | $19.75 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" DEPTH | 106 SY | $50.00 | $25.00 | $45.00 | $30.00 | $38.00 | $150 | $36.00 | $28.00 | $126 | 2% |
| 203E20000 EMBANKMENT | 164 CY | $32.00 | $50.00 | $45.00 | $23.00 | $32.30 | $24.80 | $25.50 | $40.00 | $25.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $25,000 | $21,750 | $5,140 | $3,500 | $2,725 | $12,500 | $12,000 | $26,890 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 23 CY | $200 | $200 | $115 | $128 | $147 | $147 | $89.50 | $165 | $291 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350 OR MASH 201 | 2 EACH | $2,275 | $2,275 | $2,275 | $2,275 | $2,275 | $2,275 | $2,468 | $2,275 | $2,275 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 20 CY | $200 | $260 | $150 | $125 | $500 | $420 | $600 | $300 | $1,269 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 142 SY | $25.00 | $10.00 | $33.00 | $8.00 | $23.01 | $18.88 | $14.50 | $30.00 | $42.79 | 1% |
| $1,500 |
| $675 |
| $561 |
| $705 |
| $955 |
| $850 |
| $1,000 |
| $1,765 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 44 FT | $10.00 | $50.00 | $18.00 | $25.00 | $15.62 | $18.26 | $23.00 | $38.00 | $83.10 |
| 202E35200 PIPE REMOVED, OVER 24" | 40 FT | $50.00 | $100 | $32.00 | $170 | $37.01 | $48.00 | $24.00 | $135 | $55.29 |
| 202E38000 GUARDRAIL REMOVED | 37.5 FT | $6.00 | $10.00 | $6.00 | $6.00 | $6.00 | $8.30 | $4.00 | $2.50 | $6.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $275 | $200 | $275 | $500 | $275 | $173 | $582 | $300 | $275 |
| 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN | 36 CY | $80.00 | $60.00 | $95.00 | $212 | $110 | $84.68 | $89.50 | $105 | $110 |
| 204E10000 SUBGRADE COMPACTION | 161 SY | $2.00 | $4.00 | $8.00 | $14.00 | $10.77 | $4.90 | $4.00 | $4.00 | $20.79 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN | 148 SY | $5.00 | $5.00 | $6.00 | $7.00 | $5.72 | $5.32 | $2.00 | $4.00 | $6.36 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 25 FT | $24.50 | $24.50 | $25.50 | $24.50 | $24.50 | $24.50 | $26.50 | $24.50 | $24.50 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $1,175 | $1,175 | $1,175 | $1,175 | $1,175 | $1,175 | $1,050 | $1,175 | $1,175 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $3,200 | $5,000 | $6,000 | $2,550 | $2,000 | $3,885 | $1,365 | $8,000 | $18,000 |
| 204E13000 EXCAVATION OF SUBGRADE | 36 CY | $25.00 | $50.00 | $45.00 | $41.00 | $23.94 | $22.00 | $43.00 | $35.00 | $91.78 |
| 654E11000 COMMERCIAL FERTILIZER | 0.36 TON | $610 | $610 | $900 | $500 | $1,500 | $610 | $641 | $1,500 | $500 |
| 659E10000 SEEDING AND MULCHING | 1,174 SY | $2.87 | $2.87 | $2.75 | $3.25 | $3.60 | $2.87 | $3.00 | $2.00 | $3.25 |
| 659E31000 LIME | 0.55 ACRE | $70.00 | $70.00 | $125 | $200 | $250 | $70.00 | $73.51 | $250 | $200 |
| 659E35000 WATER | 14.4 MGAL | $1.00 | $1.00 | $10.00 | $1.00 | $50.00 | $1.00 | $1.00 | $50.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 170 SY | $5.00 | $5.00 | $4.00 | $3.25 | $14.95 | $5.00 | $5.50 | $4.00 | $3.25 |
| 832E30000 EROSION CONTROL | 1 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E06400 15" CONDUIT, TYPE D | 25 FT | $30.00 | $75.00 | $70.00 | $55.00 | $123 | $62.35 | $65.50 | $120 | $87.27 |
| 304E20000 AGGREGATE BASE | 25 CY | $75.00 | $100 | $140 | $94.00 | $119 | $50.00 | $68.00 | $200 | $271 |
| 407E20000 NON-TRACKING TACK COAT | 24 GAL | $20.00 | $10.00 | $3.25 | $1.00 | $10.00 | $20.00 | $6.00 | $10.00 | $10.00 |
| 621E00100 RPM | 4 EACH | $615 | $700 | $676 | $615 | $525 | $652 | $685 | $615 | $615 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $5.00 | $10.00 | $79.50 | $15.00 | $6.51 | $95.25 | $10.00 | $45.00 | $21.79 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 12 EACH | $14.00 | $14.00 | $16.00 | $14.00 | $25.50 | $14.00 | $9.00 | $14.00 | $14.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.04 MILE | $39,975 | $67,000 | $39,975 | $39,975 | $39,975 | $66,110 | $69,416 | $39,975 | $39,975 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $68,125 | $67,000 | $68,125 | $68,125 | $68,125 | $66,295 | $69,610 | $68,125 | $68,125 |
| 304E20000 AGGREGATE BASE | 20 CY | $50.00 | $100 | $100 | $40.00 | $137 | $50.00 | $88.00 | $100 | $618 |
| 407E10000 TACK COAT | 20 GAL | $10.00 | $10.00 | $3.25 | $1.00 | $10.00 | $20.00 | $6.00 | $5.00 | $133 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $25.00 | $100 | $85.00 | $65.00 | $65.00 | $75.00 | $68.50 | $85.00 | $75.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.02 MILE | $450 | $67,000 | $450 | $450 | $450 | $66,270 | $69,584 | $450 | $450 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $600 | $67,000 | $600 | $600 | $600 | $66,455 | $69,778 | $600 | $600 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $500 | $20,000 | $14,000 | $10,000 | $8,247 | $30,500 | $6,237 | $40,000 | $29,657 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $7,500 | $9,000 | $6,500 | $4,200 | $6,825 | $14,500 | $12,000 | $4,612 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $45,000 | $45k | 16% |
| 602E20000 CONCRETE MASONRY | 40.3 CY | $750 | $30k | 11% |
| 611E53000 38" X 60" CONDUIT, TYPE A, 706.04 | 41 FT | $625 | $26k | 9% |
| 611E22200 54" CONDUIT, TYPE A | 74 FT | $275 | $20k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $18k | 7% |
| 203E10000 EXCAVATION | 244 CY | $50 | $12k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 25 CY | $450 | $11k | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $10k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 16 CY | $475 | $8k | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,500 | $8k | 3% |