D10-Culverts FY2020A
D10 County · est $0.2M
Bid dateThursday, March 26—
D10 County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Parker Corporation | R2Axis Civil Construction LLC | R3Proshot Concrete INC | R4Bcc Ohio INC | R5Righter Company INC | R6Amaazz Construction Ohio LLC | R7Eclipse CO LLC | R8Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 342 FT | $65.00 | $70.00 | $20.00 | $26.54 | $75.00 | $132 | $90.00 | $90.00 | 16% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 60" CO | 114 FT | $125 | $115 | $125 | $165 | $150 | $141 |
| Item | Quantity | R1Parker Corporation | R2Axis Civil Construction LLC | R3Proshot Concrete INC | R4Bcc Ohio INC | R5Righter Company INC | R6Amaazz Construction Ohio LLC | R7Eclipse CO LLC | R8Ohio-west Virginia Excavating CO |
|---|---|---|---|---|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 50 FT | $5.00 | $6.00 | $5.50 | $3.84 | $5.00 | $2.30 | $6.50 | $7.00 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 5 CY | $125 | $150 | $400 | $286 | $700 | $131 | $81.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100 |
| $215 |
| 10% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 57" X | 97 FT | $125 | $160 | $200 | $191 | $190 | $107 | $190 | $280 | 9% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 72" CO | 85 FT | $125 | $105 | $175 | $218 | $130 | $147 | $110 | $250 | 8% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $5,000 | $10,000 | $4,032 | $15,000 | $11,327 | $9,500 | $6,500 | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $17,000 | $3,000 | $14,943 | $15,000 | $20,999 | $26,000 | $45,000 | 7% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $2,500 | $1,000 | $5,070 | $500 | $2,842 | $12,000 | $5,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $18,500 | $25,000 | $22,355 | $10,000 | $15,818 | $37,286 | $20,000 | 7% |
| 611E26000 72" CONDUIT, TYPE A, 707.03 | 6 FT | $1,202 | $1,200 | $600 | $2,419 | $2,000 | $1,409 | $1,100 | $900 | 5% |
| 511E47010 CLASS QC1 CONCRETE, CULVERT | 12 CY | $550 | $550 | $500 | $679 | $500 | $1,114 | $840 | $575 | 5% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 6'-4" | 50 FT | $125 | $165 | $200 | $252 | $195 | $197 | $150 | $275 | 4% |
| 601E26000 DUMPED ROCK FILL, TYPE B | 44 CY | $125 | $150 | $350 | $171 | $200 | $92.60 | $112 | $155 | 4% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 602E20000 CONCRETE MASONRY | 2.4 CY | $1,250 | $1,850 | $4,200 | $1,866 | $4,000 | $3,060 | $850 | $2,100 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $3,000 | $2,850 | $2,344 | $4,000 | $2,203 | $8,400 | $5,000 | 1% |
| 607E15000 FENCE, TYPE 47 | 50 FT | $30.00 | $20.00 | $50.00 | $60.90 | $20.00 | $28.40 | $115 | $40.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 575 SY | $2.00 | $5.00 | $9.00 | $2.10 | $13.75 | $15.60 | $8.50 | $6.00 | 1% |
| 202E20010 HEADWALL REMOVED | 1 EACH | $1,000 | $650 | $5,400 | $3,360 | $1,500 | $1,114 | $1,000 | $2,000 | 1% |
| 202E35200 PIPE REMOVED, OVER 24" | 4 FT | $250 | $200 | $1,000 | $384 | $1,000 | $267 | $115 | $255 | 1% |
| 304E20000 AGGREGATE BASE | 10 CY | $100 | $90.00 | $300 | $97.80 | $100 | $147 | $271 | $145 | 1% |
| $175 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 5 CY | $125 | $150 | $400 | $286 | $700 | $158 | $92.00 | $187 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $10,000 | $500 | $910 | $2,625 | $600 | $682 | $775 | $1,100 |
| 659E31000 LIME | 0.13 ACRE | $3,847 | $200 | $130 | $1,010 | $70.00 | $79.00 | $104 | $1,200 |
| 659E35000 WATER | 2 MGAL | $0.50 | $1.00 | $1.30 | $12.60 | $1.00 | $1.10 | $1.00 | $5.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $16,000 | $15,000 | $8,640 | $43,000 | $33,460 | $35,000 | $22,000 |
| 611E06400 15" CONDUIT, TYPE D | 6 FT | $100 | $150 | $350 | $345 | $200 | $172 | $107 | $200 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $100 | $110 | $200 | $97.80 | $75.00 | $502 | $87.50 | $145 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $100 | $450 | $200 | $360 | $300 | $228 | $285 | $650 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 342 FT | $65 | $22k | 15% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 60" CO | 114 FT | $125 | $14k | 10% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 57" X | 97 FT | $125 | $12k | 8% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 72" CO | 85 FT | $125 | $11k | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $10k | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $10k | 7% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $10k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 7% |
| 611E26000 72" CONDUIT, TYPE A, 707.03 | 6 FT | $1,202 | $7k | 5% |
| 511E47010 CLASS QC1 CONCRETE, CULVERT | 12 CY | $550 | $7k | 5% |