CAR-SR 542-09.34
CAR County · est $0.8M
Bid dateThursday, May 7—
CAR County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 68 more items below.
| Item | Quantity | R1Mc Connell Contracting INC | R2Stanley Miller Construction Company | R3Lockhart Concrete CO | R4Bog Construction INC | R5Alan Stone CO INC | R6Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 515E12051 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 9 EACH | $14,000 | $14,028 | $4,500 | $13,240 | $15,700 | $16,000 | 21% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 50 CY | $1,100 | $998 | $700 | $1,040 | $1,200 | $1,955 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $74,511 | $20,000 |
| Item | Quantity | R1Mc Connell Contracting INC | R2Stanley Miller Construction Company | R3Lockhart Concrete CO | R4Bog Construction INC | R5Alan Stone CO INC | R6Shelly & Sands INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $1,611 | $1,000 | $3,500 | $5,000 | $1,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 42 FT | $6.00 | $11.00 | $10.00 | $20.00 | $21.00 | $13.50 |
| 202E38000 GUARDRAIL REMOVED | 348 FT | $2.50 | $2.00 | $3.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40,000 |
| $52,800 |
| $42,000 |
| 8% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 160 SY | $295 | $236 | $475 | $205 | $270 | $270 | 8% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 84 CY | $550 | $382 | $700 | $500 | $490 | $885 | 8% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $40,000 | $22,556 | $69,900 | $65,000 | $55,000 | $30,000 | 7% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,050 FT | $29.00 | $18.43 | $30.00 | $51.00 | $19.00 | $18.00 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 157 CY | $172 | $191 | $300 | $250 | $190 | $200 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $34,556 | $19,000 | $20,000 | $50,000 | $40,000 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 130 FT | $155 | $138 | $165 | $135 | $140 | $144 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 17,021 LB | $1.15 | $1.60 | $1.00 | $2.20 | $2.00 | $1.50 | 3% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $18,000 | $12,223 | $29,000 | $65,000 | $35,000 | $29,803 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 631 FT | $28.00 | $21.25 | $32.00 | $17.00 | $13.00 | $15.00 | 3% |
| 304E20000 AGGREGATE BASE | 167 CY | $95.00 | $78.00 | $50.00 | $95.00 | $87.00 | $90.00 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 47 CY | $319 | $355 | $345 | $330 | $340 | $425 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 31 CF | $475 | $498 | $340 | $455 | $460 | $430 | 2% |
| 526E90010 TYPE A INSTALLATION | 72 FT | $195 | $101 | $75.00 | $135 | $300 | $182 | 2% |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 18 EACH | $750 | $719 | $1,000 | $350 | $260 | $215 | 2% |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 4 EACH | $2,500 | $1,950 | $1,000 | $2,500 | $2,200 | $2,100 | 2% |
| 203E20000 EMBANKMENT | 496 CY | $20.00 | $39.20 | $30.00 | $25.00 | $21.00 | $19.00 | 2% |
| $3.00 |
| $2.05 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $500 | $175 | $250 | $100 | $280 | $272 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $200 | $100 | $250 | $100 | $100 | $97.40 |
| 202E53100 MAILBOX REMOVED | 2 EACH | $50.00 | $25.00 | $20.00 | $100 | $16.00 | $15.50 |
| 203E10000 EXCAVATION | 218 CY | $25.00 | $29.00 | $20.00 | $25.00 | $23.00 | $21.00 |
| 204E10000 SUBGRADE COMPACTION | 1,051 SY | $1.75 | $1.00 | $2.00 | $3.00 | $3.00 | $2.90 |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $16.40 | $19.56 | $18.00 | $20.00 | $19.00 | $18.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 4 EACH | $985 | $1,372 | $1,000 | $1,400 | $1,300 | $1,266 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,025 | $2,250 | $2,000 | $2,100 | $2,200 | $2,075 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $200 | $162 | $150 | $200 | $160 | $149 |
| 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ | 1 LS | $3,500 | $4,000 | $4,000 | $5,000 | $2,000 | $3,800 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $100 | $500 | $50.00 | $100 | $100 |
| 659E00300 TOPSOIL | 120 CY | $65.00 | $22.25 | $30.00 | $30.00 | $59.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 1,082 SY | $3.00 | $2.25 | $2.00 | $5.00 | $4.00 | $2.37 |
| 659E14000 REPAIR SEEDING AND MULCHING | 54 SY | $1.50 | $1.00 | $1.00 | $1.00 | $1.00 | $2.37 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $5,000 | $800 | $700 | $1,000 | $550 | $605 |
| 659E31000 LIME | 0.22 ACRE | $2,500 | $400 | $600 | $200 | $84.00 | $70.00 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $50.00 | $1.00 | $2.00 | $1.00 |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.2 CY | $5,000 | $2,034 | $2,000 | $2,500 | $2,600 | $4,000 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $15.00 | $22.35 | $15.00 | $20.00 | $40.00 | $20.00 |
| 611E04600 12" CONDUIT, TYPE C | 174 FT | $40.00 | $45.55 | $95.00 | $45.00 | $59.00 | $47.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,200 | $1,242 | $1,250 | $1,700 | $1,900 | $2,500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 247 FT | $6.50 | $4.30 | $5.00 | $12.00 | $14.00 | $2.60 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE DEPTH | 562 SY | $7.00 | $7.78 | $8.00 | $15.00 | $8.00 | $14.00 |
| 407E10000 TACK COAT | 314 GAL | $2.50 | $2.80 | $5.00 | $4.00 | $3.00 | $2.50 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (53 CY | $174 | $194 | $340 | $410 | $190 | $400 |
| 621E00100 RPM | 13 EACH | $225 | $250 | $325 | $300 | $240 | $225 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 13 EACH | $50.00 | $25.00 | $65.00 | $50.00 | $27.00 | $6.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 10 EACH | $22.00 | $8.25 | $20.00 | $10.00 | $8.00 | $7.60 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 67 FT | $11.00 | $10.75 | $10.00 | $20.00 | $20.00 | $19.35 |
| 630E80100 SIGN, FLAT SHEET | 18.3 SF | $25.00 | $27.40 | $25.00 | $50.00 | $41.00 | $40.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $50.00 | $50.00 | $50.00 | $100 | $11.00 | $10.25 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $50.00 | $75.00 | $75.00 | $50.00 | $41.00 | $40.00 |
| 646E10010 EDGE LINE, 6" | 0.28 MILE | $12,000 | $7,778 | $8,000 | $15,000 | $12,600 | $12,000 |
| 646E10200 CENTER LINE | 0.14 MILE | $12,000 | $7,778 | $11,000 | $15,000 | $12,600 | $12,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $50.00 | $75.00 | $55.00 | $60.00 | $69.00 | $72.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $150 | $167 | $200 | $100 | $380 | $230 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 15 EACH | $22.00 | $12.25 | $20.00 | $10.00 | $24.00 | $9.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 14 EACH | $28.50 | $13.35 | $20.00 | $10.00 | $30.00 | $9.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 24 EACH | $22.00 | $16.70 | $25.00 | $20.00 | $24.00 | $16.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.19 MILE | $13,450 | $9,974 | $12,000 | $15,000 | $14,200 | $13,455 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.5 MILE | $8,995 | $6,747 | $10,000 | $15,000 | $9,500 | $9,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 20 FT | $12.95 | $4.50 | $6.00 | $20.00 | $14.00 | $13.00 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 36 SY | $175 | $130 | $60.00 | $95.00 | $140 | $150 |
| 616E10000 WATER | 5 MGAL | $1.00 | $1.00 | $50.00 | $1.00 | $21.00 | $69.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 63 FT | $50.00 | $23.35 | $36.00 | $20.00 | $48.00 | $55.00 |
| 202E22900 APPROACH SLAB REMOVED | 88 SY | $75.00 | $80.50 | $19.00 | $30.00 | $10.00 | $26.00 |
| 202E23500 WEARING COURSE REMOVED | 225 SY | $6.00 | $14.30 | $10.00 | $25.00 | $7.00 | $17.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $5,000 | $10,889 | $5,000 | $5,500 | $13,000 | $30,700 |
| 503E21100 UNCLASSIFIED EXCAVATION | 183 CY | $15.00 | $31.00 | $30.00 | $30.00 | $38.00 | $95.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 980 FT | $6.00 | $26.35 | $50.00 | $7.00 | $20.00 | $16.00 |
| 507E93300 STEEL POINTS OR SHOES | 14 EACH | $100 | $94.45 | $500 | $150 | $90.00 | $104 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 72 SY | $18.00 | $27.40 | $15.00 | $28.00 | $43.00 | $32.00 |
| 512E33000 TYPE 2 WATERPROOFING | 10 SY | $45.00 | $36.00 | $20.00 | $65.00 | $220 | $40.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 30 SF | $25.00 | $4.15 | $5.00 | $10.00 | $4.00 | $10.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 90 FT | $32.00 | $24.75 | $10.00 | $30.00 | $21.00 | $24.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 18 EACH | $10.00 | $8.00 | $50.00 | $7.00 | $35.00 | $17.00 |
| 516E43101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 18 EACH | $100 | $70.00 | $100 | $70.00 | $70.00 | $56.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 59 CY | $85.00 | $118 | $50.00 | $85.00 | $190 | $110 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 109 FT | $10.00 | $2.50 | $10.00 | $10.00 | $10.00 | $5.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 48 FT | $10.00 | $5.32 | $10.00 | $10.00 | $23.00 | $6.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 101 CY | $85.00 | $102 | $120 | $60.00 | $90.00 | $141 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $9,360 | $24,900 | $15,000 | $5,500 | $5,400 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,000 | $1,667 | $500 | $500 | $700 | $3,025 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $18,567 | $14,900 | $5,500 | $11,100 | $13,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12051 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 9 EACH | $14,000 | $126k | 16% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 50 CY | $1,100 | $55k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $50k | 6% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 160 SY | $295 | $47k | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 84 CY | $550 | $46k | 6% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $40,000 | $40k | 5% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,050 FT | $29 | $30k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 157 CY | $172 | $27k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $22k | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 130 FT | $155 | $20k | 3% |