NOB-SR 821-14.09
NOB County · est $0.4M
Bid dateThursday, August 13—
NOB County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Buds INC | R2Parker Corporation | R3Shelly & Sands INC | R4Litman Excavating INC | R5Alan Stone CO INC | R6Eclipse CO LLC | R7Black Horse Bridge Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E96401 16' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN | 60 FT | $1,425 | $1,094 | $1,241 | $1,440 | $1,300 | $1,400 | $1,150 | 28% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 127 CY | $250 | $231 | $325 | $374 | $295 | $230 | $230 | 10% |
| 441E50000 |
| Item | Quantity | R1Buds INC | R2Parker Corporation | R3Shelly & Sands INC | R4Litman Excavating INC | R5Alan Stone CO INC | R6Eclipse CO LLC | R7Black Horse Bridge Construction INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $22,500 | $6,560 | $2,500 | $5,000 | $9,500 | $6,000 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $500 | $100 | $135 | $1,000 | $331 | $208 | $350 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 34 FT | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 92 CY |
| $270 |
| $260 |
| $350 |
| $403 |
| $332 |
| $260 |
| $260 |
| 8% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 36.5 CY | $465 | $550 | $799 | $460 | $919 | $951 | $700 | 6% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 158 CY | $90.00 | $120 | $139 | $175 | $118 | $111 | $125 | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $14,100 | $6,000 | $15,146 | $21,380 | $13,000 | $6,667 | $20,000 | 5% |
| 304E20000 AGGREGATE BASE | 102 CY | $125 | $65.00 | $111 | $58.82 | $106 | $83.44 | $65.00 | 4% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 108 CY | $105 | $65.00 | $80.00 | $110 | $38.50 | $69.91 | $120 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (T = 3" Avg.) | 518 SY | $20.00 | $8.00 | $20.00 | $6.76 | $24.00 | $19.00 | $19.00 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 11.8 CY | $850 | $650 | $2,327 | $1,903 | $1,300 | $1,531 | $1,500 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $1,000 | $10,001 | $5,000 | $2,700 | $17,025 | $58,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $31,500 | $10,000 | $17,500 | $21,000 | $29,011 | $10,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,700 | $24,500 | $4,575 | $4,341 | $12,000 | $10,284 | $35,000 | 3% |
| 203E10000 EXCAVATION | 517 CY | $15.00 | $20.00 | $27.00 | $16.44 | $17.00 | $29.13 | $28.00 | 3% |
| 601E11000 RIPRAP, TYPE D | 30 SY | $250 | $90.00 | $200 | $36.00 | $223 | $104 | $230 | 2% |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A | 3,484 SY | $1.95 | $4.00 | $3.00 | $6.61 | $5.00 | $4.00 | $3.90 | 2% |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $2,000 | $2,000 | $2,100 | $3,067 | $2,000 | $2,329 | $2,750 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,951 LB | $1.17 | $1.25 | $2.25 | $1.25 | $2.00 | $2.24 | $2.25 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $29,550 | $2,249 | $10,149 | $3,000 | $8,000 | $5,400 | 2% |
| 512E33010 TYPE 3 WATERPROOFING | 130 SY | $32.00 | $18.00 | $30.50 | $12.98 | $37.50 | $40.57 | $60.00 | 1% |
| $10.00 |
| $12.00 |
| $30.00 |
| $25.00 |
| $11.40 |
| $28.00 |
| 202E38000 GUARDRAIL REMOVED | 138 FT | $2.00 | $2.00 | $5.00 | $2.50 | $3.00 | $4.21 | $4.00 |
| 203E20000 EMBANKMENT | 56 CY | $30.00 | $20.00 | $14.50 | $32.14 | $6.00 | $137 | $30.00 |
| 203E35000 GRANULAR EMBANKMENT | 23 CY | $50.00 | $65.00 | $95.50 | $55.00 | $66.50 | $97.04 | $75.00 |
| 204E10000 SUBGRADE COMPACTION | 649 SY | $2.50 | $0.50 | $6.50 | $5.00 | $4.00 | $2.42 | $4.00 |
| 659E10000 SEEDING AND MULCHING | 1,465 SY | $1.25 | $1.00 | $1.75 | $2.77 | $11.50 | $4.06 | $3.90 |
| 659E14000 REPAIR SEEDING AND MULCHING | 366 SY | $0.01 | $0.10 | $0.75 | $2.77 | $7.00 | $0.68 | $0.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $580 | $1,924 | $717 | $800 | $1,100 | $822 | $790 |
| 659E31000 LIME | 0.3 ACRE | $240 | $834 | $156 | $200 | $903 | $44.73 | $43.00 |
| 659E35000 WATER | 8 MGAL | $1.00 | $0.05 | $1.00 | $140 | $59.00 | $1.04 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C, 707.43 | 44 FT | $78.00 | $50.00 | $131 | $96.00 | $175 | $79.07 | $90.00 |
| 407E20000 NON-TRACKING TACK COAT | 165 GAL | $3.00 | $4.00 | $3.00 | $3.45 | $4.00 | $3.40 | $3.30 |
| 422E25000 EMULSION, CHIP SEAL | 1,290 GAL | $1.65 | $3.50 | $3.75 | $2.50 | $4.50 | $3.40 | $3.35 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $5.00 | $20.00 | $8.00 | $330 | $38.00 | $8.27 | $50.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 7 FT | $15.00 | $15.00 | $22.50 | $15.00 | $96.50 | $78.00 | $22.50 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $8.00 | $30.00 | $160 | $15.00 | $109 | $88.40 | $160 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $5.00 | $10.00 | $69.00 | $25.00 | $19.50 | $15.60 | $69.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $50.00 | $30.00 | $91.90 | $125 | $160 | $130 | $92.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $10.00 | $10.00 | $103 | $30.00 | $25.50 | $20.80 | $104 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $50.00 | $30.00 | $138 | $200 | $250 | $203 | $138 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.14 MILE | $5,300 | $5,075 | $7,440 | $5,836 | $9,500 | $5,278 | $7,440 |
| 642E00300 CENTER LINE, TYPE 1 | 0.07 MILE | $9,800 | $9,690 | $9,920 | $11,144 | $13,000 | $10,078 | $9,920 |
| 202E23500 WEARING COURSE REMOVED | 59 SY | $28.00 | $10.00 | $5.50 | $30.00 | $7.50 | $4.94 | $60.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $1,500 | $650 | $2,525 | $3,900 | $2,300 | $3,459 | $450 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 72 SY | $22.00 | $12.00 | $28.00 | $40.00 | $46.00 | $23.44 | $28.00 |
| 512E33000 TYPE 2 WATERPROOFING | 94 SY | $18.00 | $14.00 | $22.50 | $5.92 | $18.00 | $28.92 | $16.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 34 SF | $12.00 | $5.00 | $1.50 | $19.00 | $2.00 | $5.68 | $4.00 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 9 CY | $150 | $134 | $320 | $467 | $468 | $110 | $140 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $23,500 | $7,400 | $5,000 | $11,000 | $19,500 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96401 16' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN | 60 FT | $1,425 | $86k | 25% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 127 CY | $250 | $32k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 92 CY | $270 | $25k | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 36.5 CY | $465 | $17k | 5% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 158 CY | $90 | $14k | 4% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $14,100 | $14k | 4% |
| 304E20000 AGGREGATE BASE | 102 CY | $125 | $13k | 4% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 108 CY | $105 | $11k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (T = 3" Avg.) | 518 SY | $20 | $10k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 11.8 CY | $850 | $10k | 3% |