MAH-SR 7-00.00 (PART 1 AND PART 2)
MAH County · est $1.0M
Bid dateThursday, December 3—
MAH County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 76 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4R T Vernal Paving & Excavating INC | R5Shelly Company | R6Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 1,855 CY | $173 | $166 | $185 | $174 | $190 | $200 | 46% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1.0 | 57,700 SY | $0.60 | $1.00 | $0.45 | $0.90 | $1.25 | $2.00 | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (227 CY | $135 | $150 |
| Item | Quantity | R1Shelly & Sands INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4R T Vernal Paving & Excavating INC | R5Shelly Company | R6Barbicas Construction Company INC |
|---|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 574 SY | $3.99 | $2.00 | $5.00 | $5.00 | $7.00 | $4.00 |
| 202E30000 WALK REMOVED | 1,048 SF | $2.50 | $4.50 | $4.00 | $3.00 | $3.00 | $2.00 |
| 202E32000 CURB REMOVED | 45 FT | $16.00 | $10.00 | $10.00 | $20.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $155 |
| $150 |
| $170 |
| $200 |
| 4% |
| 619E16010 FIELD OFFICE, TYPE B | 15 MNTH | $2,000 | $500 | $1,800 | $2,000 | $2,000 | $600 | 4% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,750 | $7,250 | $6,750 | $6,750 | $6,750 | $8,500 | 4% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,500 | $6,950 | $6,500 | $6,500 | $6,500 | $8,000 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $25.00 | $30.00 | $29.00 | $24.00 | $45.00 | $28.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $25,800 | $55,000 | $50,000 | $40,000 | $25,000 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T=2.0") | 444 CY | $45.00 | $60.00 | $38.00 | $60.00 | $55.00 | $90.00 | 3% |
| 646E10000 EDGE LINE, 4" | 7.16 MILE | $2,700 | $2,200 | $2,333 | $2,333 | $2,333 | $2,200 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,492 | $75,000 | $46,000 | $40,000 | $75,000 | $40,000 | 3% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $4,500 | $5,200 | $4,500 | $4,500 | $4,500 | $5,200 | 3% |
| 407E20000 NON-TRACKING TACK COAT @ 0.09 GAL/SY | 5,926 GAL | $3.00 | $3.00 | $2.00 | $3.00 | $2.50 | $3.50 | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $6,750 | $7,250 | $6,750 | $6,750 | $6,750 | $8,500 | 2% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 18,900 FT | $0.69 | $0.50 | $0.70 | $1.80 | $1.00 | $1.45 | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $6,500 | $6,950 | $6,500 | $6,500 | $6,500 | $8,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 21,039 SY | $0.60 | $0.50 | $0.83 | $0.82 | $0.85 | $0.20 | 2% |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 13 EACH | $825 | $750 | $950 | $750 | $800 | $1,200 | 2% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $10,500 | $11,500 | $10,500 | $10,500 | $10,500 | $11,500 | 2% |
| 646E10200 CENTER LINE | 3.58 MILE | $2,910 | $4,100 | $2,778 | $2,778 | $2,778 | $4,100 | 2% |
| $5.00 |
| 202E32500 CURB AND GUTTER REMOVED | 106 FT | $10.50 | $25.00 | $10.00 | $10.00 | $5.00 | $5.00 |
| 203E40000 BORROW | 2 CY | $200 | $100 | $50.00 | $50.00 | $60.00 | $50.00 |
| 209E60200 LINEAR GRADING | 378 STA | $25.00 | $15.00 | $30.00 | $30.00 | $40.00 | $15.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 27 STA | $25.00 | $75.00 | $110 | $30.00 | $255 | $25.00 |
| 608E10000 4" CONCRETE WALK | 609 SF | $8.50 | $6.00 | $8.00 | $7.50 | $20.00 | $5.00 |
| 608E52000 CURB RAMP | 439 SF | $13.50 | $18.00 | $20.00 | $20.95 | $23.00 | $20.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $250 | $500 | $200 | $400 | $500 | $300 |
| 659E20000 COMMERCIAL FERTILIZER | 2.83 TON | $670 | $100 | $1,000 | $992 | $992 | $150 |
| 659E31000 LIME | 4.34 ACRE | $153 | $25.00 | $0.25 | $197 | $200 | $50.00 |
| 659E35000 WATER | 113.4 MGAL | $1.00 | $1.00 | $0.01 | $2.50 | $2.50 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,400 | $1,075 | $1,100 | $1,200 | $900 | $1,000 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $2,500 | $1,325 | $1,100 | $1,200 | $1,500 | $1,400 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $2,500 | $1,385 | $1,200 | $1,200 | $1,300 | $1,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2.0") | 7,633 SY | $1.00 | $2.00 | $2.00 | $1.50 | $2.25 | $3.00 |
| 407E20000 NON-TRACKING TACK COAT @ 0.06 GAL/SY | 489 GAL | $3.00 | $3.00 | $2.00 | $3.00 | $2.50 | $3.50 |
| 408E10001 PRIME COAT, AS PER PLAN @ 0.40 GAL/SY | 3,192 GAL | $3.00 | $3.00 | $4.00 | $3.50 | $3.50 | $5.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE (FIELD DRIVES) | 10 CY | $280 | $250 | $175 | $80.00 | $250 | $150 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 43 FT | $44.50 | $45.00 | $39.00 | $45.00 | $25.00 | $40.00 |
| 609E26000 CURB, TYPE 6 | 28 FT | $57.00 | $25.00 | $39.00 | $35.00 | $25.00 | $30.00 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 6.5 MILE | $650 | $1,510 | $650 | $650 | $1,000 | $1,250 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 3.25 MILE | $650 | $1,650 | $650 | $650 | $1,000 | $1,450 |
| 621E00100 RPM | 319 EACH | $27.95 | $28.00 | $31.90 | $30.00 | $29.50 | $28.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 324 EACH | $5.00 | $1.00 | $1.00 | $5.00 | $5.45 | $8.67 |
| 646E10300 CHANNELIZING LINE, 8" | 348 FT | $2.00 | $1.90 | $1.66 | $1.66 | $1.70 | $1.90 |
| 646E10400 STOP LINE | 89 FT | $10.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10500 CROSSWALK LINE | 615 FT | $5.50 | $5.00 | $5.50 | $5.50 | $5.50 | $5.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $500 | $600 | $600 | $600 | $600 | $600 |
| 646E20300 LANE ARROW | 4 EACH | $175 | $165 | $160 | $160 | $160 | $165 |
| 614E12460 WORK ZONE MARKING SIGN | 32 EACH | $100 | $50.00 | $70.00 | $70.00 | $55.00 | $70.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $155 | $75.00 | $150 | $300 | $115 | $200 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,000 | $600 | $500 | $900 | $900 | $600 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 4.01 MILE | $900 | $1,050 | $650 | $650 | $900 | $1,050 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.58 MILE | $900 | $1,050 | $650 | $650 | $900 | $1,050 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 7.16 MILE | $400 | $600 | $525 | $525 | $400 | $600 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 696 FT | $0.75 | $0.75 | $1.50 | $1.50 | $0.75 | $0.75 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 348 FT | $0.75 | $1.10 | $1.50 | $1.50 | $0.75 | $1.10 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 164 FT | $2.00 | $3.00 | $3.00 | $3.00 | $2.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 82 FT | $2.00 | $3.00 | $3.00 | $3.00 | $2.00 | $3.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E25500 CONDUIT, 3", 725.04 | 105 FT | $15.00 | $22.00 | $15.00 | $15.00 | $15.00 | $22.00 |
| 625E29000 TRENCH | 90 FT | $17.50 | $15.00 | $17.50 | $17.50 | $17.50 | $15.00 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 15 FT | $65.00 | $45.00 | $65.00 | $65.00 | $65.00 | $45.00 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,250 | $1,100 | $1,250 | $1,250 | $1,250 | $1,100 |
| 625E31510 PULL BOX REMOVED | 10 EACH | $200 | $200 | $200 | $200 | $200 | $200 |
| 625E32000 GROUND ROD | 9 EACH | $200 | $200 | $200 | $200 | $200 | $200 |
| 625E36000 PLASTIC CAUTION TAPE | 105 FT | $0.25 | $1.00 | $0.25 | $0.25 | $0.25 | $1.00 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, CONTROLLER | 1 EACH | $500 | $1,500 | $500 | $500 | $500 | $1,500 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 4 EACH | $800 | $650 | $800 | $800 | $800 | $650 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 5 EACH | $1,200 | $1,200 | $1,200 | $1,200 | $1,200 | $1,200 |
| 632E20720 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2 | 8 EACH | $700 | $525 | $700 | $700 | $700 | $525 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 9 EACH | $50.00 | $40.00 | $50.00 | $50.00 | $50.00 | $40.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 8 EACH | $50.00 | $40.00 | $50.00 | $50.00 | $50.00 | $40.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 8 EACH | $250 | $195 | $250 | $250 | $250 | $195 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 460 FT | $8.00 | $10.00 | $8.00 | $8.00 | $8.00 | $10.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 460 FT | $15.00 | $13.75 | $15.00 | $15.00 | $15.00 | $13.75 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 1,683 FT | $2.25 | $1.50 | $2.25 | $2.25 | $2.25 | $1.50 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,745 FT | $2.50 | $1.95 | $2.50 | $2.50 | $2.50 | $1.95 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 926 FT | $3.00 | $2.25 | $3.00 | $3.00 | $3.00 | $2.25 |
| 632E64020 PEDESTAL FOUNDATION | 5 EACH | $750 | $900 | $750 | $750 | $750 | $900 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 48 FT | $6.00 | $3.00 | $6.00 | $6.00 | $6.00 | $3.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,000 | $2,800 | $2,000 | $2,000 | $2,000 | $2,800 |
| 632E86501 STRAIN POLE, TYPE TC-81.11, INSTALLATION ONLY, AS | 4 EACH | $1,000 | $900 | $1,000 | $1,000 | $1,000 | $900 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 5 EACH | $650 | $600 | $650 | $650 | $650 | $600 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $2,000 | $3,500 | $2,000 | $2,000 | $2,000 | $3,500 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,750 | $2,800 | $1,750 | $1,750 | $1,750 | $2,800 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $550 | $800 | $550 | $550 | $550 | $800 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $6,500 | $5,500 | $5,500 | $5,500 | $6,500 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,500 | $7,500 | $4,500 | $4,500 | $4,500 | $7,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $67.00 | $90.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,000 | $5,000 | $4,000 | $7,500 | $2,500 | $7,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $7,200 | $9,000 | $9,000 | $3,000 | $15,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $500 | $4,000 | $10,000 | $2,868 | $250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 1,855 CY | $173 | $321k | 36% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1.0 | 57,700 SY | $0.6 | $35k | 4% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (227 CY | $135 | $31k | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 15 MNTH | $2,000 | $30k | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,750 | $27k | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,500 | $26k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $25 | $25k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T=2.0") | 444 CY | $45 | $20k | 2% |
| 646E10000 EDGE LINE, 4" | 7.16 MILE | $2,700 | $19k | 2% |