BUT-SR 122-10.33
BUT County · est $0.8M
Bid dateThursday, December 17—
BUT County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 99 more items below.
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Eclipse CO LLC | R3Barrett Paving Materials INC | R4Sunesis Construction CO | R5Complete General Construction Company | R6Prus Construction Company | R7John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 328 CY | $220 | $237 | $212 | $231 | $230 | $275 | $351 | 13% |
| 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 282 CY | $230 | $247 | $225 | $242 | $235 | $285 | $310 | 11% |
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Eclipse CO LLC | R3Barrett Paving Materials INC | R4Sunesis Construction CO | R5Complete General Construction Company | R6Prus Construction Company | R7John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 2,942 SF | $1.75 | $1.75 | $2.25 | $2.69 | $2.50 | $2.50 | $3.66 |
| 202E30600 CONCRETE MEDIAN REMOVED | 137 SY | $49.00 | $11.50 | $31.15 | $93.44 | $35.00 | $34.00 | $31.64 |
| 202E30800 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 |
| 337 CY |
| $185 |
| $206 |
| $200 |
| $216 |
| $220 |
| $235 |
| $248 |
| 11% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 918 FT | $36.00 | $40.00 | $29.00 | $29.21 | $45.00 | $34.00 | $31.47 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $32,000 | $35,707 | $65,000 | $15,026 | $80,000 | $37,000 | $37,676 | 6% |
| AA2 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN(WAVETRONIX) | 4 EACH | $7,325 | $7,081 | $7,331 | $7,377 | $6,700 | $7,692 | $7,325 | 5% |
| 203E10000 EXCAVATION | 920 CY | $30.00 | $25.50 | $34.00 | $52.32 | $40.00 | $31.00 | $35.00 | 5% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 4" | 469 FT | $58.00 | $46.25 | $48.90 | $58.41 | $40.00 | $61.00 | $58.00 | 5% |
| 609E26000 CURB, TYPE 6 | 1,076 FT | $23.50 | $32.00 | $18.00 | $18.13 | $43.00 | $32.00 | $20.14 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 7,563 SY | $3.25 | $4.00 | $3.50 | $4.62 | $4.00 | $4.00 | $3.62 | 4% |
| 202E23000 PAVEMENT REMOVED | 700 SY | $33.00 | $16.50 | $21.25 | $35.53 | $15.00 | $41.00 | $23.53 | 4% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $5,570 | $5,150 | $4,893 | $5,610 | $5,000 | $5,849 | $5,570 | 4% |
| 608E10000 4" CONCRETE WALK | 2,872 SF | $7.00 | $8.75 | $5.80 | $7.70 | $7.00 | $6.00 | $7.45 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $40,000 | $20,000 | $44,853 | $20,000 | $10,000 | $40,000 | 3% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 1,198 FT | $14.00 | $10.75 | $20.00 | $14.23 | $20.00 | $18.00 | $14.57 | 3% |
| 304E20000 AGGREGATE BASE | 219 CY | $75.00 | $56.00 | $140 | $121 | $80.00 | $70.00 | $113 | 3% |
| AA2 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN(WAVETRONIX) ( | 2 EACH | $7,785 | $6,721 | $7,676 | $7,841 | $7,000 | $8,174 | $7,785 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $70.00 | $67.00 | $65.00 | $65.46 | $75.00 | $90.00 | $75.00 | 2% |
| 608E52000 CURB RAMP | 422 SF | $33.00 | $32.75 | $23.00 | $30.67 | $20.00 | $25.00 | $28.15 | 2% |
| 638E20754 SPECIAL - FIRE HYDRANT REMOVED AND RESET (MIDDLETO | 2 EACH | $6,500 | $2,165 | $5,000 | $4,636 | $2,500 | $5,300 | $5,626 | 2% |
| 23 SY |
| $60.00 |
| $13.50 |
| $125 |
| $135 |
| $35.00 |
| $50.00 |
| $102 |
| 202E32000 CURB REMOVED | 1,016 FT | $6.50 | $4.75 | $10.15 | $5.09 | $8.00 | $12.75 | $11.47 |
| 202E32500 CURB AND GUTTER REMOVED | 929 FT | $7.00 | $5.25 | $12.25 | $5.57 | $8.00 | $14.00 | $12.42 |
| 202E58200 INLET REMOVED | 4 EACH | $575 | $453 | $600 | $729 | $500 | $650 | $1,022 |
| 203E20000 EMBANKMENT | 33 CY | $36.00 | $17.25 | $170 | $47.84 | $12.00 | $61.00 | $39.00 |
| 608E15000 8" CONCRETE WALK | 487 SF | $11.00 | $13.25 | $8.45 | $10.71 | $10.00 | $10.00 | $12.08 |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 15 SY | $155 | $182 | $90.00 | $428 | $125 | $250 | $90.00 |
| 623E38500 MONUMENT ASSEMBLY | 1 EACH | $1,700 | $967 | $875 | $1,944 | $1,000 | $900 | $849 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 5 EACH | $475 | $377 | $450 | $1,004 | $650 | $600 | $849 |
| 690E98400 SPECIAL - SPECIAL MISC.: CONSULTANT FOR CONCRETE Q | 1 LS | $7,500 | $7,416 | $5,000 | $2,578 | $6,000 | $10,000 | $6,846 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $3,000 | $3,245 | $3,500 | $1,571 | $6,000 | $8,000 | $7,450 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $150 | $92.75 | $125 | $128 | $125 | $260 | $125 |
| 659E00300 TOPSOIL | 150 CY | $57.00 | $74.25 | $65.00 | $56.34 | $30.00 | $64.00 | $55.00 |
| 659E10000 SEEDING AND MULCHING | 1,349 SY | $3.25 | $1.75 | $2.15 | $3.01 | $2.15 | $1.05 | $2.15 |
| 659E14000 REPAIR SEEDING AND MULCHING | 67 SY | $1.00 | $1.00 | $2.15 | $2.20 | $2.15 | $1.30 | $2.15 |
| 659E15000 INTER-SEEDING | 67 SY | $1.00 | $1.00 | $0.75 | $0.77 | $0.75 | $1.30 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.2 TON | $800 | $1,030 | $800 | $819 | $800 | $800 | $800 |
| 659E31000 LIME | 0.03 ACRE | $200 | $103 | $1,000 | $1,024 | $1,000 | $475 | $1,000 |
| 659E35000 WATER | 7.5 MGAL | $75.00 | $25.75 | $10.00 | $10.24 | $10.00 | $53.00 | $10.00 |
| 832E30000 EROSION CONTROL | 11,600 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00900 6" CONDUIT, TYPE B | 12 FT | $40.00 | $42.75 | $35.00 | $43.23 | $20.00 | $115 | $93.18 |
| 611E04400 12" CONDUIT, TYPE B | 50 FT | $125 | $133 | $165 | $158 | $210 | $150 | $288 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $3,350 | $3,585 | $4,300 | $3,875 | $6,000 | $4,500 | $3,210 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $2,650 | $2,893 | $3,500 | $2,940 | $2,750 | $4,200 | $2,285 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $1,050 | $546 | $2,200 | $549 | $600 | $750 | $1,677 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $900 | $546 | $650 | $549 | $600 | $750 | $1,325 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $1,250 | $1,249 | $2,200 | $1,092 | $1,500 | $2,500 | $1,652 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $500 | $284 | $550 | $338 | $225 | $700 | $859 |
| 407E20000 NON-TRACKING TACK COAT | 574 GAL | $1.00 | $3.25 | $3.25 | $3.45 | $3.25 | $7.00 | $5.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 9 SY | $117 | $173 | $64.00 | $372 | $70.00 | $75.00 | $101 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 117 SY | $105 | $105 | $72.00 | $95.38 | $85.00 | $80.00 | $77.25 |
| 638E20796 SPECIAL - RETAP, RECONNECT AND EXTEND 3/4" COPPER | 21 FT | $400 | $91.50 | $110 | $168 | $175 | $150 | $164 |
| 625E32000 GROUND ROD | 2 EACH | $275 | $294 | $232 | $277 | $230 | $290 | $275 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 105 FT | $11.00 | $15.25 | $9.00 | $11.08 | $12.00 | $11.50 | $11.00 |
| 630E74601 OVERHEAD SIGN SUPPORT, INSTALLATION ONLY, AS PER P | 2 EACH | $500 | $5,600 | $1,700 | $423 | $4,850 | $530 | $500 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 15 EACH | $280 | $366 | $410 | $126 | $285 | $300 | $280 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 4 EACH | $82.50 | $213 | $130 | $25.18 | $145 | $136 | $125 |
| 630E80100 SIGN, FLAT SHEET | 148 SF | $25.00 | $17.75 | $15.25 | $126 | $13.75 | $27.00 | $25.00 |
| 630E80510 SIGN, STREET NAME | 4 EACH | $300 | $230 | $365 | $20.14 | $185 | $300 | $300 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 2 EACH | $4,495 | $5,223 | $5,550 | $25.18 | $4,650 | $4,750 | $4,495 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $20.00 | $11.00 | $20.00 | $12.59 | $10.00 | $25.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $25.00 | $16.50 | $30.00 | $13.27 | $15.00 | $30.00 | $25.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 7 EACH | $25.00 | $32.75 | $15.00 | $15.29 | $25.00 | $16.00 | $25.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 2 EACH | $65.00 | $246 | $65.00 | $69.11 | $195 | $70.00 | $180 |
| 644E00104 EDGE LINE, 6", WHITE | 0 MILE | $5,515 | $56,805 | $5,515 | $176,255 | $5,515 | $5,750 | $5,515 |
| 644E00204 LANE LINE, 6", WHITE | 0.28 MILE | $3,600 | $3,708 | $3,600 | $5,036 | $3,600 | $3,820 | $3,600 |
| 644E00300 CENTER LINE, 4", SOLID DOUBLE YELLOW | 0.01 MILE | $6,225 | $6,412 | $6,225 | $5,036 | $6,225 | $6,600 | $6,225 |
| 644E00400 CHANNELIZING LINE, 8" | 1,270 FT | $1.15 | $1.25 | $1.15 | $1.16 | $1.15 | $1.30 | $1.15 |
| 644E00500 STOP LINE, 24" | 240 FT | $4.65 | $4.75 | $4.65 | $6.06 | $4.65 | $5.00 | $4.65 |
| 644E00600 CROSSWALK LINE, 12" | 685 FT | $2.65 | $2.75 | $2.65 | $2.62 | $2.65 | $3.00 | $2.65 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, 24", WHITE | 62 FT | $4.50 | $4.75 | $4.50 | $4.20 | $4.50 | $4.75 | $4.50 |
| 644E00720 CHEVRON MARKING, 24", WHITE | 60 FT | $4.50 | $4.75 | $4.50 | $22.16 | $4.50 | $4.75 | $4.50 |
| 644E01300 LANE ARROW, 8' | 14 EACH | $80.00 | $82.50 | $80.00 | $78.21 | $80.00 | $85.00 | $80.00 |
| 644E01500 DOTTED LINE, 4", YELLOW | 95 FT | $1.00 | $1.00 | $1.00 | $1.27 | $1.00 | $1.25 | $1.00 |
| 644E01514 DOTTED LINE, 8", WHITE | 270 FT | $1.10 | $1.25 | $1.10 | $1.69 | $1.10 | $1.25 | $1.10 |
| 625E25400 CONDUIT, 2", 725.04 | 84 FT | $15.50 | $10.25 | $20.55 | $15.61 | $14.00 | $16.50 | $15.50 |
| 625E25402 CONDUIT, 2", 725.05 | 64 FT | $5.20 | $4.00 | $8.50 | $5.24 | $6.00 | $5.50 | $5.20 |
| 625E25502 CONDUIT, 3", 725.05 | 110 FT | $6.70 | $6.50 | $13.10 | $6.75 | $9.50 | $7.00 | $6.70 |
| 625E25602 CONDUIT, 4", 725.05 | 48 FT | $12.50 | $8.75 | $15.30 | $12.59 | $12.50 | $13.00 | $12.50 |
| 625E29001 TRENCH, AS PER PLAN | 221 FT | $24.00 | $13.00 | $14.75 | $24.17 | $15.00 | $25.00 | $24.00 |
| 625E30706 PULL BOX, 725.08, 24" | 8 EACH | $985 | $1,149 | $905 | $992 | $1,200 | $1,034 | $985 |
| 625E31510 PULL BOX REMOVED | 13 EACH | $325 | $155 | $221 | $327 | $250 | $341 | $325 |
| 625E32000 GROUND ROD | 10 EACH | $275 | $294 | $232 | $277 | $230 | $290 | $275 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 221 FT | $0.05 | $0.50 | $0.15 | $0.05 | $0.70 | $0.05 | $0.05 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 9 EACH | $925 | $994 | $906 | $932 | $900 | $971 | $925 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 4 EACH | $1,450 | $1,530 | $1,340 | $1,460 | $1,500 | $1,522 | $1,450 |
| 632E20741 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 10 EACH | $1,205 | $1,030 | $1,141 | $1,214 | $1,000 | $1,265 | $1,205 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 13 EACH | $5.00 | $41.25 | $42.00 | $5.04 | $50.00 | $5.30 | $5.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $5.00 | $41.25 | $42.00 | $5.04 | $50.00 | $5.30 | $5.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 9 EACH | $695 | $1,030 | $776 | $700 | $800 | $730 | $695 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,470 FT | $2.55 | $2.00 | $2.65 | $2.57 | $3.00 | $2.70 | $2.55 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,630 FT | $2.75 | $2.25 | $2.90 | $2.77 | $3.50 | $2.90 | $2.75 |
| 632E64020 PEDESTAL FOUNDATION | 5 EACH | $750 | $1,545 | $1,278 | $755 | $1,000 | $788 | $750 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 110 FT | $3.10 | $2.75 | $3.00 | $3.12 | $3.75 | $3.25 | $3.10 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,285 | $3,348 | $2,447 | $2,301 | $1,600 | $2,400 | $2,285 |
| 632E80700 SIGNAL SUPPORT, MISC.: SIGNAL SUPPORT, INSTALLATIO | 4 EACH | $640 | $2,060 | $3,283 | $645 | $2,900 | $678 | $640 |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, TRANSFORMER BASE, INSTA | 5 EACH | $90.00 | $515 | $446 | $90.64 | $300 | $95.40 | $90.00 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $8,990 | $5,150 | $6,624 | $9,054 | $6,000 | $9,440 | $8,990 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: SPREAD SPECTRUM RAD | 1 EACH | $1,375 | $1,468 | $2,913 | $1,385 | $2,500 | $1,444 | $1,375 |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN | 1 EACH | $11,190 | $12,659 | $11,027 | $11,270 | $13,000 | $11,750 | $11,190 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $1,630 | $1,288 | $1,763 | $1,642 | $3,000 | $1,711 | $1,630 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,185 | $773 | $684 | $1,193 | $1,200 | $1,244 | $1,185 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,515 | $5,959 | $5,622 | $5,554 | $5,000 | $5,791 | $5,515 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,450 | $4,568 | $5,784 | $4,482 | $4,000 | $4,673 | $4,450 |
| 809E69200 EMERGENCY VEHICLE PREEMPTION | 1 EACH | $800 | $1,828 | $1,712 | $806 | $1,500 | $848 | $800 |
| 809E69210 PREEMPT RECEIVING UNIT | 4 EACH | $650 | $623 | $582 | $655 | $750 | $689 | $650 |
| 809E69220 PREEMPT DETECTOR CABLE | 910 FT | $2.20 | $2.00 | $2.40 | $2.22 | $1.50 | $2.25 | $2.20 |
| 809E69230 PREEMPT PHASE SELECTOR | 1 EACH | $1,630 | $1,504 | $2,172 | $1,642 | $1,500 | $1,711 | $1,630 |
| 809E69240 PREEMPT CONFIRMATION LIGHT | 4 EACH | $800 | $798 | $364 | $806 | $500 | $848 | $800 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 75 CY | $60.00 | $50.25 | $70.00 | $83.13 | $50.00 | $133 | $127 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 50 CY | $50.00 | $54.00 | $75.00 | $75.55 | $50.00 | $114 | $133 |
| 614E20410 WORK ZONE LANE LINE, CLASS II, 6" | 0.26 MILE | $5,693 | $5,864 | $5,715 | $2,508 | $5,693 | $6,040 | $5,693 |
| 614E23650 WORK ZONE CHANNELIZING LINE, CLASS II, 8" | 1,210 FT | $0.55 | $0.50 | $0.55 | $0.54 | $0.55 | $0.58 | $0.55 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 240 FT | $2.50 | $2.50 | $2.50 | $3.21 | $2.50 | $2.65 | $2.50 |
| 616E10000 WATER | 1 MGAL | $95.00 | $126 | $50.00 | $14.73 | $70.00 | $1.00 | $1,458 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $15,500 | $8,576 | $0.01 | $8,000 | $10,000 | $4,380 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $14,541 | $15,000 | $16,366 | $15,000 | $7,000 | $10,199 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 328 CY | $220 | $72k | 8% |
| 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 282 CY | $230 | $65k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 337 CY | $185 | $62k | 7% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 918 FT | $36 | $33k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $32,000 | $32k | 4% |
| AA2 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN(WAVETRONIX) | 4 EACH | $7,325 | $29k | 3% |
| 203E10000 EXCAVATION | 920 CY | $30 | $28k | 3% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 4" | 469 FT | $58 | $27k | 3% |
| 609E26000 CURB, TYPE 6 | 1,076 FT | $23.5 | $25k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 7,563 SY | $3.25 | $25k | 3% |