WAR-US 22-07.12
WAR County · est $1.4M
Bid dateThursday, January 14—
WAR County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 99 more items below.
| Item | Quantity | R1Sunesis Construction CO | R2Barrett Paving Materials INC | R3Prus Construction Company | R4Eclipse CO LLC | R5John R Jurgensen Company | R6Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 638E20248 SPECIAL - 20" WATER MAIN DIP CLASS 52 MECHANICAL J | 1,126 FT | $285 | $235 | $255 | $251 | $259 | $375 | 32% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 779 CY | $172 | $175 | $180 | $177 | $185 | $173 | 14% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,245 CY | $57.00 | $75.00 | $55.00 |
| Item | Quantity | R1Sunesis Construction CO | R2Barrett Paving Materials INC | R3Prus Construction Company | R4Eclipse CO LLC | R5John R Jurgensen Company | R6Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $13,700 | $20,000 | $8,000 | $11,500 | $15,222 | $25,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 308 FT | $17.00 | $6.00 | $23.50 | $19.00 | $40.90 | $15.00 |
| 202E75000 FENCE REMOVED | 130 FT | $7.00 | $4.50 | $8.00 | $8.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $53.50 |
| $51.92 |
| $48.00 |
| 7% |
| 203E10000 EXCAVATION | 1,885 CY | $29.00 | $30.00 | $29.00 | $25.50 | $34.13 | $35.00 | 6% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,245 CY | $33.00 | $30.00 | $32.50 | $33.00 | $23.91 | $35.00 | 4% |
| 304E20000 AGGREGATE BASE | 521 CY | $73.00 | $100 | $62.00 | $59.00 | $110 | $56.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $36,700 | $40,000 | $40,000 | $72,841 | $40,000 | $40,000 | 4% |
| 638E20080 SPECIAL - 8" WATER MAIN DIP CLASS 52 MECHANICAL JO | 184 FT | $181 | $137 | $173 | $133 | $152 | $260 | 3% |
| 632E86131 STRAIN POLE, TYPE TC-81.11, DESIGN 10, AS PER PLAN | 4 EACH | $7,200 | $7,155 | $7,500 | $7,091 | $7,155 | $6,100 | 3% |
| 202E23000 PAVEMENT REMOVED | 1,346 SY | $21.00 | $20.00 | $22.00 | $12.00 | $27.53 | $15.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 131 CY | $212 | $205 | $225 | $207 | $280 | $205 | 3% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (139 CY | $186 | $185 | $225 | $187 | $230 | $185 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,480 | $54,000 | $38,000 | $24,546 | $78,358 | $65,000 | 2% |
| 611E04900 12" CONDUIT, TYPE D | 278 FT | $80.00 | $55.00 | $70.00 | $26.50 | $131 | $85.00 | 2% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $5,300 | $5,280 | $5,550 | $7,620 | $5,280 | $6,000 | 2% |
| 659E00300 TOPSOIL | 644 CY | $30.00 | $51.00 | $54.00 | $53.50 | $5.62 | $40.00 | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,557 FT | $12.00 | $14.00 | $14.50 | $11.50 | $22.44 | $12.00 | 2% |
| 809E69000 ADVANCE RADAR DETECTION | 2 EACH | $7,900 | $7,880 | $8,275 | $9,154 | $7,880 | $7,000 | 2% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 809E69100 STOP LINE RADAR DETECTION | 2 EACH | $7,500 | $7,525 | $7,900 | $8,572 | $7,525 | $6,800 | 2% |
| $4.50 |
| $5.00 |
| 202E98100 REMOVAL MISC.: BOLLARD | 16 EACH | $145 | $50.00 | $48.00 | $73.00 | $57.50 | $45.00 |
| 202E98100 REMOVAL MISC.: WOOD POST | 1 EACH | $145 | $10.00 | $400 | $118 | $145 | $450 |
| 202E98200 REMOVAL MISC.: ROCK WALL | 32 FT | $13.00 | $10.00 | $30.00 | $4.50 | $58.83 | $26.00 |
| 203E20000 EMBANKMENT | 373 CY | $13.00 | $30.00 | $11.00 | $22.50 | $29.76 | $8.00 |
| 204E10000 SUBGRADE COMPACTION | 3,200 SY | $3.00 | $4.00 | $1.25 | $2.00 | $3.47 | $3.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $300 | $850 | $120 | $225 | $209 | $190 |
| 204E50000 GEOTEXTILE FABRIC | 3,200 SY | $1.00 | $3.00 | $1.75 | $1.50 | $4.23 | $2.50 |
| 606E15050 GUARDRAIL, TYPE MGS | 325 FT | $26.00 | $19.20 | $22.50 | $20.00 | $19.20 | $19.20 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 62.5 FT | $26.00 | $19.60 | $22.50 | $21.50 | $19.60 | $19.60 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,500 | $985 | $1,285 | $1,035 | $985 | $985 |
| 606E26551 ANCHOR ASSEMBLY, MGS TYPE T, AS PER PLAN | 1 EACH | $1,500 | $1,020 | $1,285 | $1,071 | $1,020 | $1,020 |
| 623E38500 MONUMENT ASSEMBLY | 1 EACH | $500 | $1,000 | $1,600 | $1,513 | $1,093 | $1,100 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 2 EACH | $100 | $500 | $600 | $523 | $532 | $600 |
| 623E40500 REFERENCE MONUMENT | 7 EACH | $1.00 | $600 | $200 | $530 | $1,063 | $500 |
| 625E31510 PULL BOX REMOVED | 3 EACH | $210 | $215 | $250 | $263 | $215 | $200 |
| 625E75400 LIGHT POLE REMOVED | 1 EACH | $1,550 | $2,500 | $2,000 | $420 | $1,555 | $975 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 4 EACH | $260 | $175 | $500 | $189 | $195 | $136 |
| 659E10000 SEEDING AND MULCHING | 5,140 SY | $1.50 | $1.14 | $1.25 | $1.00 | $1.14 | $1.14 |
| 659E14000 REPAIR SEEDING AND MULCHING | 257 SY | $1.00 | $1.14 | $1.00 | $1.00 | $1.14 | $1.14 |
| 659E20000 COMMERCIAL FERTILIZER | 0.69 TON | $1,000 | $800 | $535 | $840 | $800 | $800 |
| 659E31000 LIME | 1.06 ACRE | $200 | $60.00 | $53.50 | $63.00 | $60.00 | $60.00 |
| 659E35000 WATER | 27.8 MGAL | $50.00 | $1.00 | $1.07 | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 1,107 SY | $2.00 | $2.35 | $2.40 | $2.50 | $2.35 | $2.35 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,260 | $1,250 | $1,500 | $2,520 | $1,250 | $1,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,700 | $2,720 | $2,150 | $4,725 | $4,020 | $10,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,600 | $9,512 | $5,350 | $9,988 | $9,513 | $9,500 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $8,000 | $12,000 | $10,000 | $9,286 | $5,850 | $24,000 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $200 | $200 | $500 | $147 | $238 | $200 |
| 605E31100 AGGREGATE DRAINS | 80 FT | $20.00 | $20.00 | $32.00 | $13.00 | $47.20 | $11.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 33 FT | $34.00 | $28.00 | $33.00 | $25.50 | $33.76 | $25.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,325 | $1,250 | $3,000 | $1,953 | $1,928 | $2,200 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $260 | $250 | $1,100 | $390 | $615 | $600 |
| 407E20000 NON-TRACKING TACK COAT | 538 GAL | $3.00 | $3.00 | $7.00 | $3.00 | $5.00 | $3.00 |
| 618E40800 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 1,137 FT | $5.00 | $4.65 | $5.00 | $7.50 | $6.24 | $4.65 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 145 FT | $16.00 | $10.00 | $65.00 | $19.50 | $5.00 | $20.00 |
| 202E98000 REMOVAL MISC.: EXISTING WATER MAIN (WARREN COUNTY) | 1 LS | $4,535 | $250 | $8,000 | $32,498 | $150 | $30,000 |
| 203E98000 ROADWAY, MISC.: ADDITIONAL EXCAVATION (CIN 1119) | 5 CY | $65.00 | $10.00 | $75.00 | $85.50 | $5.00 | $150 |
| 509E25000 UNCOATED REINFORCING STEEL | 1,500 LB | $1.00 | $0.50 | $0.75 | $3.00 | $1.00 | $1.50 |
| 602E98200 MASONRY, MISC.: CONCRETE, CLASS "C" (CIN 1110) | 13 CY | $180 | $137 | $150 | $598 | $75.00 | $225 |
| 625E25803 CONDUIT, CONCRETE ENCASED, AS PER PLAN, 2" | 12 FT | $125 | $400 | $150 | $291 | $420 | $115 |
| 638E20168 SPECIAL - 12" WATER MAIN DIP CLASS 52 MECHANICAL J | 14 FT | $253 | $470 | $920 | $685 | $548 | $800 |
| 638E20498 SPECIAL - VALVE BOX (CIN 1116) | 2 EACH | $1,000 | $176 | $2,100 | $322 | $160 | $300 |
| 638E20500 SPECIAL - VALVE BOX ADJUSTED TO GRADE (WARREN COUN | 1 EACH | $900 | $25.00 | $650 | $395 | $15.00 | $250 |
| 638E20750 SPECIAL - 6" FIRE HYDRANT (WARREN COUNTY) | 2 EACH | $5,500 | $5,766 | $6,300 | $5,797 | $4,850 | $5,000 |
| 638E20766 SPECIAL - 3/4" COPPER WATER SERVICE LINE, TYPE K ( | 17 FT | $125 | $114 | $120 | $100 | $191 | $120 |
| 638E30002 SPECIAL - SHEETING AND BRACING ORDERED LEFT IN PLA | 1 MBF | $1.00 | $1.00 | $165 | $1,827 | $0.50 | $3,100 |
| 638E98000 WATER WORK, MISC.: REMOVING EXISTING MANHOLE CURB | 1 EACH | $1,900 | $150 | $325 | $884 | $75.00 | $700 |
| 638E98000 WATER WORK, MISC.: RESTRAINED COUPLING SLEEVE, DRE | 2 EACH | $325 | $1,258 | $320 | $1,112 | $1,100 | $450 |
| 638E98000 WATER WORK, MISC.: SERVICE CONNECTIONS (WARREN COU | 2 EACH | $20.00 | $656 | $1,320 | $693 | $550 | $3,500 |
| 638E98100 WATER WORK, MISC.: DISINFECTION AND PRESSURE TEST | 1 LS | $1,300 | $500 | $2,675 | $790 | $750 | $2,100 |
| 638E98600 WATER WORK, MISC.: CHANGING 8" AND UNDER PIPE SEWE | 10 FT | $360 | $10.00 | $51.00 | $197 | $5.00 | $88.00 |
| 638E98600 WATER WORK, MISC.:CHANGING 10" THRU 24" PIPE SEWER | 10 FT | $370 | $10.00 | $51.00 | $203 | $5.00 | $190 |
| 621E00100 RPM | 85 EACH | $41.00 | $41.20 | $45.00 | $43.50 | $41.20 | $46.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 27 EACH | $10.00 | $10.00 | $16.00 | $9.00 | $22.79 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $15.00 | $7.50 | $15.00 | $8.00 | $7.50 | $7.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 92 FT | $7.00 | $12.00 | $13.00 | $12.50 | $15.00 | $12.00 |
| 630E80100 SIGN, FLAT SHEET | 15 SF | $13.00 | $25.00 | $27.00 | $26.50 | $25.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $48.00 | $65.00 | $75.00 | $68.50 | $85.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $13.00 | $25.00 | $26.75 | $26.50 | $15.00 | $25.00 |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 0.4 MILE | $5,450 | $5,437 | $6,300 | $5,709 | $5,437 | $13,622 |
| 644E00104 EDGE LINE, 6" | 0.4 MILE | $4,800 | $4,769 | $5,100 | $5,008 | $4,769 | $4,769 |
| 644E00300 CENTER LINE | 0.7 MILE | $5,350 | $5,320 | $5,700 | $5,587 | $5,320 | $5,320 |
| 644E00400 CHANNELIZING LINE, 8" | 635 FT | $2.00 | $1.29 | $1.35 | $1.50 | $1.29 | $1.29 |
| 644E00500 STOP LINE | 24 FT | $5.50 | $5.45 | $6.00 | $5.50 | $5.45 | $5.45 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 376 FT | $5.50 | $5.45 | $6.00 | $5.50 | $5.45 | $5.45 |
| 644E01300 LANE ARROW | 8 EACH | $133 | $132 | $140 | $8.50 | $132 | $132 |
| 625E25604 CONDUIT, 4", 725.051 | 11 FT | $15.00 | $15.00 | $16.00 | $24.50 | $15.00 | $22.00 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3" | 82 FT | $41.00 | $40.50 | $43.00 | $46.50 | $40.50 | $65.00 |
| 625E29000 TRENCH | 11 FT | $15.00 | $15.00 | $16.00 | $24.50 | $15.00 | $8.00 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,050 | $1,045 | $1,100 | $1,059 | $1,045 | $1,200 |
| 625E32000 GROUND ROD | 5 EACH | $290 | $290 | $310 | $281 | $290 | $250 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 24 FT | $21.00 | $20.00 | $21.00 | $11.50 | $15.00 | $13.00 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 2 EACH | $240 | $235 | $250 | $310 | $395 | $350 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 6 EACH | $40.00 | $235 | $42.50 | $132 | $165 | $125 |
| 630E80100 SIGN, FLAT SHEET | 23 SF | $26.00 | $25.00 | $26.75 | $27.50 | $25.00 | $25.00 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $950 | $945 | $1,000 | $953 | $945 | $700 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $5.00 | $5.00 | $5.35 | $42.50 | $5.00 | $30.00 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 229 FT | $9.00 | $9.00 | $9.75 | $19.00 | $9.00 | $24.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 229 FT | $8.00 | $8.50 | $9.00 | $19.00 | $8.50 | $30.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 585 FT | $3.00 | $2.90 | $3.10 | $3.00 | $2.90 | $2.85 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 62 FT | $5.00 | $5.00 | $5.35 | $4.00 | $5.00 | $5.25 |
| 632E69801 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG, AS PER PLAN | 44 FT | $6.50 | $6.50 | $7.00 | $5.00 | $6.50 | $5.25 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,400 | $2,400 | $2,500 | $1,323 | $2,400 | $2,300 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $2,100 | $2,080 | $2,200 | $1,270 | $2,080 | $3,200 |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $10,800 | $10,765 | $11,300 | $11,588 | $10,765 | $10,850 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,840 | $1,830 | $1,925 | $2,963 | $1,830 | $2,750 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,350 | $1,340 | $1,450 | $519 | $1,340 | $1,100 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 1 EACH | $1,850 | $1,840 | $1,975 | $1,614 | $1,840 | $1,950 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,700 | $5,670 | $6,000 | $6,032 | $5,670 | $5,000 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,700 | $4,665 | $4,900 | $5,059 | $4,665 | $4,200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $65.00 | $100 | $68.50 | $103 | $81.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.4 MILE | $18,600 | $18,480 | $20,000 | $19,404 | $18,480 | $18,480 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.4 MILE | $6,600 | $6,600 | $7,200 | $6,930 | $6,600 | $6,600 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 20 FT | $9.00 | $8.50 | $9.25 | $9.00 | $8.50 | $8.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,360 | $7,095 | $15,000 | $16,800 | $19,820 | $12,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,800 | $15,000 | $10,800 | $18,690 | $12,165 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 638E20248 SPECIAL - 20" WATER MAIN DIP CLASS 52 MECHANICAL J | 1,126 FT | $285 | $321k | 26% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 779 CY | $172 | $134k | 11% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,245 CY | $57 | $71k | 6% |
| 203E10000 EXCAVATION | 1,885 CY | $29 | $55k | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,245 CY | $33 | $41k | 3% |
| 304E20000 AGGREGATE BASE | 521 CY | $73 | $38k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $36,700 | $37k | 3% |
| 638E20080 SPECIAL - 8" WATER MAIN DIP CLASS 52 MECHANICAL JO | 184 FT | $181 | $33k | 3% |
| 632E86131 STRAIN POLE, TYPE TC-81.11, DESIGN 10, AS PER PLAN | 4 EACH | $7,200 | $29k | 2% |
| 202E23000 PAVEMENT REMOVED | 1,346 SY | $21 | $28k | 2% |