ASD-SR 302-09.34
ASD County · est $0.8M
Bid dateThursday, January 14—
ASD County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 56 more items below.
| Item | Quantity | R1Black Horse Bridge Construction INC | R2R & I Construction INC | R3V O Menuez & Son INC | R4Great Lakes Demolition Company | R5Shelly & Sands INC | R6Stanley Miller Construction Company | R7Suburban Maintenance & Construction | R8INC Mosser Construction INC | R9Chagrin Valley Paving INC | R10Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 515E12090 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $20,275 | $20,875 | $22,268 | $19,000 | $21,300 | $22,100 | $22,000 | $23,800 | $23,600 |
| Item | Quantity | R1Black Horse Bridge Construction INC | R2R & I Construction INC | R3V O Menuez & Son INC | R4Great Lakes Demolition Company | R5Shelly & Sands INC | R6Stanley Miller Construction Company | R7Suburban Maintenance & Construction | R8INC Mosser Construction INC | R9Chagrin Valley Paving INC | R10Rietschlin Construction INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $1,000 | $12,248 | $2,000 | $1,300 | $2,167 | $5,000 | $7,000 | $2,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $21,180 |
| 27% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 73 CY | $810 | $750 | $560 | $550 | $1,000 | $564 | $550 | $800 | $800 | $960 | 10% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $56,000 | $78,800 | $80,435 | $25,000 | $46,600 | $52,500 | $55,000 | $56,000 | $65,000 | $38,000 | 9% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 875 FT | $58.00 | $60.00 | $68.38 | $49.50 | $50.00 | $54.10 | $55.00 | $75.00 | $47.00 | $71.00 | 9% |
| 832E30000 EROSION CONTROL | 32,200 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 86 CY | $340 | $500 | $482 | $1,100 | $675 | $443 | $600 | $580 | $485 | $410 | 5% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 143 SY | $200 | $240 | $231 | $275 | $250 | $215 | $200 | $260 | $240 | $202 | 5% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $24,000 | $10,000 | $4,000 | $5,800 | $15,000 | $11,000 | $22,932 | $16,000 | $23,000 | $9,000 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 182 FT | $130 | $141 | $151 | $145 | $127 | $157 | $141 | $127 | $141 | $144 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 18,280 LB | $1.10 | $1.20 | $1.20 | $2.00 | $1.08 | $1.13 | $1.50 | $1.10 | $1.10 | $1.50 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $32,000 | $22,000 | $42,000 | $20,000 | $24,222 | $20,000 | $20,000 | $20,000 | $45,000 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 266 CY | $75.00 | $75.00 | $85.00 | $100 | $95.00 | $90.00 | $80.00 | $120 | $75.00 | $92.00 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 94 CY | $187 | $167 | $195 | $215 | $295 | $171 | $154 | $154 | $157 | $212 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $25,000 | $10,000 | $1,850 | $8,000 | $15,667 | $15,000 | $16,000 | $10,000 | $22,900 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $9,000 | $7,800 | $10,000 | $4,400 | $8,278 | $15,000 | $5,000 | $8,500 | $8,000 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $4,000 | $4,460 | $2,000 | $2,100 | $5,000 | $5,500 | $3,175 | $1,900 | $2,143 | 1% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (27 CY | $275 | $246 | $201 | $255 | $320 | $312 | $281 | $281 | $191 | $217 | 1% |
| 202E23000 PAVEMENT REMOVED | 738 SY | $10.00 | $5.00 | $4.00 | $11.00 | $8.00 | $7.70 | $10.00 | $11.00 | $25.00 | $8.00 | 1% |
| 526E90010 TYPE A INSTALLATION | 64 FT | $105 | $150 | $111 | $90.00 | $125 | $105 | $110 | $115 | $120 | $155 | 1% |
| 304E20000 AGGREGATE BASE | 97 CY | $68.00 | $50.00 | $66.00 | $55.00 | $70.00 | $110 | $75.00 | $115 | $90.00 | $74.00 | 1% |
| $4,500 |
| 202E38000 GUARDRAIL REMOVED | 341 FT | $2.00 | $1.00 | $1.50 | $1.50 | $2.00 | $2.50 | $1.50 | $2.00 | $1.40 | $8.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $135 | $100 | $220 | $220 | $135 | $200 | $200 | $135 | $200 | $172 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $55.00 | $100 | $220 | $220 | $55.00 | $202 | $200 | $55.00 | $200 | $84.00 |
| 203E10000 EXCAVATION | 31 CY | $15.00 | $10.00 | $34.00 | $25.00 | $8.00 | $38.00 | $65.00 | $18.00 | $55.00 | $23.00 |
| 203E20000 EMBANKMENT | 199 CY | $20.00 | $10.00 | $34.00 | $25.00 | $16.00 | $29.00 | $28.00 | $8.00 | $70.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 519 SY | $4.00 | $1.00 | $1.75 | $2.00 | $3.00 | $1.00 | $3.50 | $4.00 | $4.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 42 CY | $30.00 | $10.00 | $20.00 | $25.00 | $18.00 | $28.00 | $55.00 | $8.00 | $95.00 | $41.91 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 111 CY | $50.00 | $45.00 | $43.00 | $40.00 | $52.00 | $50.00 | $65.00 | $42.00 | $70.00 | $70.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $200 | $25.00 | $200 | $400 | $172 | $100 | $150 | $200 | $200 | $147 |
| 204E50000 GEOTEXTILE FABRIC | 332 SY | $2.00 | $2.00 | $0.70 | $5.00 | $1.90 | $2.00 | $4.25 | $2.05 | $3.10 | $3.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 212.5 FT | $18.40 | $15.80 | $15.90 | $17.40 | $18.40 | $17.56 | $16.50 | $18.40 | $15.80 | $20.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 75 FT | $19.80 | $16.85 | $17.00 | $18.50 | $19.80 | $18.72 | $18.00 | $19.80 | $16.85 | $22.50 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 1 EACH | $2,140 | $2,250 | $2,260 | $2,475 | $2,140 | $2,500 | $2,250 | $2,140 | $2,250 | $2,316 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $725 | $925 | $935 | $1,015 | $725 | $1,028 | $925 | $725 | $925 | $785 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $985 | $2,175 | $2,180 | $2,392 | $985 | $2,417 | $2,175 | $985 | $2,175 | $1,112 |
| 659E00300 TOPSOIL | 42 CY | $50.00 | $10.00 | $23.00 | $50.00 | $32.00 | $25.00 | $40.00 | $23.00 | $70.00 | $55.00 |
| 659E10000 SEEDING AND MULCHING | 693 SY | $2.00 | $4.00 | $4.00 | $2.00 | $3.61 | $2.50 | $5.00 | $3.95 | $5.00 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 35 SY | $1.00 | $1.00 | $0.69 | $2.00 | $0.69 | $1.00 | $1.00 | $1.45 | $5.00 | $40.00 |
| 659E15000 INTER-SEEDING | 35 SY | $1.00 | $1.00 | $0.69 | $2.00 | $0.69 | $0.50 | $0.01 | $0.10 | $5.00 | $40.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $500 | $500 | $850 | $1,000 | $751 | $800 | $800 | $940 | $775 | $2,760 |
| 659E31000 LIME | 0.08 ACRE | $200 | $50.00 | $300 | $1,000 | $275 | $100 | $50.00 | $30.00 | $500 | $100 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 | $1.00 | $5.00 | $1.00 | $4.00 | $1.00 | $1.00 | $10.00 | $124 |
| 605E31100 AGGREGATE DRAINS | 70 FT | $14.00 | $10.00 | $8.00 | $15.00 | $15.00 | $28.00 | $20.00 | $13.00 | $30.00 | $26.00 |
| 407E10000 TACK COAT | 66 GAL | $10.00 | $4.00 | $8.20 | $1.50 | $2.00 | $2.78 | $2.50 | $2.50 | $1.80 | $9.00 |
| 408E10000 PRIME COAT | 63 GAL | $8.00 | $6.00 | $18.20 | $7.00 | $15.00 | $3.62 | $6.25 | $6.25 | $9.21 | $20.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 46 CY | $100 | $50.00 | $89.00 | $55.00 | $70.00 | $158 | $70.00 | $80.00 | $110 | $96.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 19 CY | $345 | $309 | $221 | $325 | $350 | $449 | $404 | $404 | $233 | $238 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 8 EACH | $8.00 | $8.00 | $9.00 | $10.00 | $8.00 | $9.00 | $8.00 | $8.00 | $8.00 | $9.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 12 FT | $20.00 | $15.00 | $22.75 | $22.65 | $20.00 | $16.11 | $9.00 | $22.65 | $14.50 | $22.00 |
| 630E80100 SIGN, FLAT SHEET | 1 SF | $30.00 | $200 | $250 | $249 | $30.00 | $83.33 | $33.00 | $249 | $75.00 | $33.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $10.00 | $10.00 | $5.00 | $238 | $10.00 | $66.67 | $15.00 | $238 | $60.00 | $11.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $15.00 | $10.00 | $5.00 | $238 | $15.00 | $74.44 | $15.00 | $238 | $67.00 | $16.50 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $15,000 | $12,200 | $27,500 | $51,000 | $12,000 | $16,667 | $15,000 | $12,200 | $15,000 | $13,300 |
| 646E10200 CENTER LINE | 0.06 MILE | $45,000 | $12,200 | $27,900 | $51,000 | $12,200 | $50,000 | $45,000 | $12,200 | $45,000 | $13,300 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $75.00 | $65.00 | $60.00 | $120 | $72.00 | $80.00 | $65.00 | $60.00 | $90.00 | $71.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,500 | $7,000 | $5,600 | $4,000 | $3,600 | $3,889 | $5,400 | $5,360 | $3,500 | $3,789 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 | $5.00 | $60.00 | $1.00 | $12.00 | $10.00 | $10.00 | $20.00 |
| 202E22900 APPROACH SLAB REMOVED | 107 SY | $30.00 | $20.00 | $15.35 | $12.00 | $35.00 | $35.50 | $50.00 | $52.00 | $35.00 | $55.00 |
| 202E23500 WEARING COURSE REMOVED | 463 SY | $5.00 | $10.00 | $3.00 | $7.00 | $7.00 | $8.00 | $12.00 | $7.00 | $8.09 | $7.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $3,000 | $500 | $2,000 | $500 | $13,400 | $8,000 | $10,000 | $50.00 | $8,000 | $32,700 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 805 FT | $5.60 | $5.00 | $19.20 | $37.00 | $28.00 | $48.86 | $25.00 | $15.00 | $19.00 | $17.50 |
| 507E93300 STEEL POINTS OR SHOES | 14 EACH | $285 | $300 | $378 | $310 | $325 | $316 | $284 | $350 | $135 | $316 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 115 SY | $20.00 | $25.00 | $16.32 | $50.00 | $28.00 | $26.00 | $35.00 | $18.00 | $30.00 | $31.50 |
| 512E33000 TYPE 2 WATERPROOFING | 10 SY | $100 | $20.00 | $54.55 | $50.00 | $85.00 | $183 | $45.00 | $40.00 | $35.00 | $136 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 42 SF | $10.00 | $4.00 | $8.00 | $20.00 | $9.00 | $2.25 | $3.85 | $6.00 | $20.00 | $12.50 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 91 FT | $24.00 | $22.00 | $28.54 | $24.00 | $25.00 | $25.00 | $55.00 | $46.00 | $21.00 | $26.00 |
| 516E42600 ELASTOMERIC BEARING PAD, MISC.: 6"x2" ELASTOMERIC | 72 FT | $60.00 | $95.00 | $125 | $115 | $54.00 | $91.00 | $100 | $75.00 | $93.00 | $62.50 |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 32 EACH | $115 | $140 | $188 | $150 | $112 | $215 | $200 | $155 | $140 | $164 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 67 CY | $80.00 | $50.00 | $90.00 | $75.00 | $109 | $82.00 | $80.00 | $95.00 | $90.00 | $116 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 205 FT | $10.00 | $10.00 | $15.00 | $10.00 | $13.50 | $8.94 | $12.00 | $23.00 | $17.00 | $9.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 100 FT | $8.00 | $8.00 | $15.00 | $12.00 | $5.00 | $3.00 | $12.00 | $16.00 | $19.00 | $7.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 71 FT | $12.00 | $8.00 | $15.00 | $12.00 | $4.00 | $4.00 | $10.00 | $16.00 | $20.00 | $14.50 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,500 | $5,340 | $6,700 | $5,000 | $3,300 | $3,525 | $5,000 | $5,000 | $3,500 | $7,153 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $500 | $500 | $2,000 | $2,250 | $3,000 | $1,000 | $2,000 | $1,800 | $1,100 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $2,000 | $3,223 | $7,200 | $10,000 | $17,445 | $10,000 | $3,000 | $8,500 | $3,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12090 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $20,275 | $162k | 23% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 73 CY | $810 | $59k | 8% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $56,000 | $56k | 8% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 875 FT | $58 | $51k | 7% |
| 832E30000 EROSION CONTROL | 32,200 EACH | $1 | $32k | 5% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 86 CY | $340 | $29k | 4% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 143 SY | $200 | $29k | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $24,000 | $24k | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 182 FT | $130 | $24k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 18,280 LB | $1.1 | $20k | 3% |