ATH-Woodlane Drive
ATH County · est $0.6M
Bid dateThursday, January 14—
ATH County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2D G M INC | R3Black Horse Bridge Construction INC | R4Buds INC | R5Shelly & Sands INC | R6Rietschlin Construction INC | R7George J Igel & CO INC | R8Alan Stone CO INC | R9Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 7 EACH | $21,000 | $23,100 | $19,500 | $22,250 | $21,050 | $20,750 | $22,000 | $22,000 | $27,265 | 29% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN, SEC | 2,865 SF |
| Item | Quantity | R1Axis Civil Construction LLC | R2D G M INC | R3Black Horse Bridge Construction INC | R4Buds INC | R5Shelly & Sands INC | R6Rietschlin Construction INC | R7George J Igel & CO INC | R8Alan Stone CO INC | R9Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 175 SY | $9.00 | $12.00 | $18.00 | $25.00 | $8.00 | $12.00 | $6.00 | $4.50 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 401 FT | $3.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $43.00 |
| $33.75 |
| $42.00 |
| $40.00 |
| $36.00 |
| $28.50 |
| $32.00 |
| $38.00 |
| $32.00 |
| 24% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 56 CY | $760 | $1,200 | $775 | $1,200 | $1,010 | $1,100 | $950 | $1,300 | $925 | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $25,000 | $25,000 | $31,000 | $25,000 | $26,001 | $42,000 | $64,800 | $43,000 | $30,000 | 5% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 58 CY | $425 | $450 | $500 | $500 | $838 | $450 | $650 | $435 | $975 | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 171 FT | $141 | $148 | $125 | $132 | $125 | $135 | $125 | $148 | $135 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,113 LB | $1.60 | $1.10 | $1.40 | $1.25 | $1.26 | $1.25 | $1.19 | $1.60 | $1.50 | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $14,590 | $5,000 | $15,000 | $18,000 | $17,000 | $12,300 | $10,000 | $4,000 | $10,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $8,000 | $20,000 | $13,500 | $20,000 | $35,000 | $20,000 | $18,000 | $20,000 | 2% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 480 FT | $22.50 | $37.50 | $23.00 | $28.00 | $20.00 | $33.00 | $27.00 | $26.50 | $25.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $13,000 | $7,450 | $4,000 | $3,800 | $4,000 | $10,000 | $6,000 | $20,000 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 4 EACH | $2,450 | $2,500 | $2,340 | $2,250 | $2,200 | $2,528 | $2,340 | $2,800 | $2,340 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,175 | $2,200 | $2,120 | $2,100 | $2,000 | $2,290 | $2,120 | $2,500 | $2,120 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 93 CY | $85.00 | $90.00 | $115 | $95.00 | $92.00 | $83.00 | $85.00 | $99.00 | $65.00 | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 60 CY | $115 | $125 | $130 | $90.00 | $126 | $240 | $170 | $147 | $400 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 24 CY | $245 | $375 | $380 | $380 | $400 | $411 | $360 | $427 | $348 | 1% |
| 503E21100 UNCLASSIFIED EXCAVATION | 125 CY | $45.00 | $20.00 | $135 | $30.00 | $63.00 | $70.00 | $75.00 | $30.50 | $70.00 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,650 | $4,000 | $6,000 | $5,000 | $4,700 | $4,400 | $5,000 | $5,500 | $4,650 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $3,000 | $5,000 | $4,000 | $10,000 | $3,600 | $6,800 | $7,100 | $3,000 | 1% |
| $2.00 |
| $2.25 |
| $1.00 |
| $4.00 |
| $1.80 |
| $2.00 |
| $1.80 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 2 EACH | $350 | $250 | $295 | $500 | $200 | $385 | $295 | $350 | $295 |
| 202E75000 FENCE REMOVED | 8 FT | $6.00 | $20.00 | $12.50 | $10.00 | $15.00 | $78.00 | $25.00 | $15.00 | $12.50 |
| 203E10000 EXCAVATION | 23 CY | $25.00 | $30.00 | $45.00 | $25.00 | $12.00 | $35.00 | $25.00 | $17.00 | $25.00 |
| 203E20000 EMBANKMENT | 74 CY | $25.00 | $25.00 | $32.00 | $45.00 | $22.00 | $25.00 | $25.00 | $24.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 154 SY | $2.50 | $8.00 | $7.00 | $3.00 | $7.00 | $7.00 | $5.00 | $3.00 | $7.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 150 FT | $16.95 | $19.00 | $19.60 | $18.50 | $18.00 | $21.25 | $19.60 | $23.00 | $19.60 |
| 659E10000 SEEDING AND MULCHING | 416 SY | $2.00 | $7.00 | $5.00 | $3.00 | $4.70 | $8.00 | $6.00 | $3.50 | $6.30 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $350 | $650 | $500 | $500 | $626 | $800 | $626 | $1,400 | $610 |
| 659E31000 LIME | 0.09 ACRE | $300 | $80.00 | $200 | $300 | $147 | $100 | $147 | $525 | $80.00 |
| 659E35000 WATER | 3 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $20.00 | $1.00 | $119 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 43 FT | $2.50 | $10.00 | $15.00 | $4.00 | $11.00 | $2.00 | $2.00 | $32.00 | $1.50 |
| 304E20000 AGGREGATE BASE | 25 CY | $95.00 | $150 | $100 | $160 | $118 | $110 | $150 | $85.00 | $95.00 |
| 407E20000 NON-TRACKING TACK COAT | 16 GAL | $5.00 | $5.00 | $62.50 | $3.50 | $3.00 | $68.00 | $5.00 | $6.00 | $4.37 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 12 CY | $330 | $380 | $560 | $560 | $600 | $605 | $365 | $433 | $686 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 2 EACH | $8.00 | $8.00 | $8.00 | $8.00 | $7.80 | $9.00 | $7.80 | $9.50 | $7.80 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 8 EACH | $8.00 | $8.00 | $9.00 | $8.00 | $8.50 | $9.00 | $8.45 | $10.00 | $8.45 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $24,500 | $50,000 | $24,500 | $25,000 | $24,500 | $3,300 | $2,975 | $29,000 | $24,500 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $60.00 | $20.00 | $35.00 | $1.00 | $60.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,000 | $3,000 | $4,000 | $6,500 | $7,300 | $9,500 | $100 | $1.00 | $17,000 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 420 FT | $10.50 | $10.00 | $4.00 | $3.50 | $22.00 | $22.00 | $20.00 | $31.50 | $30.50 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 92 SY | $22.50 | $35.00 | $24.00 | $25.00 | $28.00 | $31.00 | $28.00 | $94.00 | $28.00 |
| 512E33000 TYPE 2 WATERPROOFING | 32 SY | $16.00 | $30.00 | $100 | $40.00 | $60.00 | $26.00 | $25.00 | $56.00 | $125 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 37 SF | $6.00 | $20.00 | $10.00 | $15.00 | $10.00 | $16.00 | $5.00 | $1.50 | $10.00 |
| 516E31000 JOINT SEALER | 56 FT | $12.00 | $20.00 | $20.00 | $35.00 | $23.50 | $26.00 | $22.00 | $24.50 | $23.50 |
| 516E41100 1/8" PREFORMED BEARING PAD | 14 EACH | $12.00 | $15.00 | $18.00 | $10.00 | $18.00 | $45.00 | $45.00 | $31.00 | $43.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 28 EACH | $95.00 | $75.00 | $75.00 | $100 | $68.00 | $107 | $125 | $82.00 | $115 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 190 FT | $14.00 | $15.00 | $14.00 | $14.00 | $13.50 | $13.00 | $11.00 | $18.50 | $13.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $5,500 | $6,820 | $6,200 | $3,300 | $6,500 | $3,400 | $4,200 | $7,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,000 | $6,000 | $7,500 | $4,500 | $3,500 | $3,300 | $1,000 | $3,900 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 7 EACH | $21,000 | $147k | 26% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN, SEC | 2,865 SF | $43 | $123k | 22% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 56 CY | $760 | $43k | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $25,000 | $25k | 4% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 58 CY | $425 | $25k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 171 FT | $141 | $24k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,113 LB | $1.6 | $21k | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $14,590 | $15k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 2% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 480 FT | $22.5 | $11k | 2% |