HOL-US 62/VAR-05.06/VAR
HOL County · est $0.4M
Bid dateThursday, January 28—
HOL County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Adena Corporation | R2V O Menuez & Son INC | R3Shelly & Sands INC | R4Buds INC | R5Glenn O Hawbaker INC | R6Bcc Ohio INC | R7Ohio-west Virginia Excavating CO | R8Stanley Miller Construction Company | R9Tucson INC | R10Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 602E20000 CONCRETE MASONRY | 60 CY | $777 | $1,311 | $805 | $1,300 | $1,000 | $1,012 | $1,167 | $1,242 | $1,100 | $758 | 16% |
| 832E30000 EROSION CONTROL |
| Item | Quantity | R1Adena Corporation | R2V O Menuez & Son INC | R3Shelly & Sands INC | R4Buds INC | R5Glenn O Hawbaker INC | R6Bcc Ohio INC | R7Ohio-west Virginia Excavating CO | R8Stanley Miller Construction Company | R9Tucson INC | R10Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,041 | $13,261 | $9,000 | $5,000 | $3,850 | $1,170 | $9,950 | $3,222 | $38,700 | $10,046 |
| 202E20010 HEADWALL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 27,962 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 10% |
| 203E10000 EXCAVATION | 792 CY | $25.55 | $10.70 | $16.00 | $25.00 | $21.00 | $9.75 | $17.00 | $20.60 | $8.50 | $26.96 | 7% |
| 611E22200 54" CONDUIT, TYPE A, 707.02 (0.188) WITH CONCRETE | 62 FT | $265 | $307 | $340 | $560 | $435 | $427 | $454 | $361 | $424 | $410 | 6% |
| 203E20000 EMBANKMENT | 562 CY | $27.59 | $10.70 | $13.00 | $25.00 | $16.00 | $21.44 | $30.50 | $22.70 | $11.00 | $11.81 | 5% |
| 611E22200 54" CONDUIT, TYPE A, 707.02 (0.28), 706.02, 707.33 | 64 FT | $240 | $298 | $330 | $580 | $450 | $490 | $509 | $340 | $365 | $395 | 5% |
| 614E12420 DETOUR SIGNING | 1 LS | $14,603 | $14,593 | $17,500 | $13,400 | $13,845 | $19,163 | $19,515 | $13,989 | $12,600 | $15,463 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $14,209 | $14,180 | $10,000 | $15,000 | $13,425 | $28,589 | $40,000 | $30,000 | $39,000 | $62,000 | 5% |
| 601E11000 RIPRAP, TYPE D | 86 SY | $161 | $246 | $104 | $110 | $20.00 | $141 | $177 | $187 | $267 | $158 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 62 CY | $211 | $305 | $375 | $330 | $358 | $422 | $290 | $447 | $343 | $404 | 5% |
| 611E20700 48" CONDUIT, TYPE A, 707.02 (0.249), 706.02, 707.3 | 54 FT | $218 | $286 | $295 | $510 | $320 | $434 | $520 | $236 | $306 | $268 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 286 SY | $39.38 | $21.00 | $42.00 | $25.00 | $22.00 | $27.30 | $15.00 | $28.89 | $51.25 | $27.04 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,135 | $7,141 | $9,400 | $6,000 | $12,700 | $2,865 | $2,425 | $23,867 | $5,000 | $15,500 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 26 CY | $413 | $380 | $550 | $400 | $440 | $496 | $380 | $525 | $561 | $472 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 300 FT | $27.87 | $17.95 | $23.00 | $28.00 | $18.65 | $24.78 | $25.00 | $26.22 | $17.00 | $24.54 | 3% |
| 304E20000 AGGREGATE BASE | 62 CY | $134 | $104 | $152 | $110 | $70.00 | $111 | $111 | $90.50 | $77.00 | $88.98 | 3% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (18 CY | $406 | $330 | $455 | $400 | $440 | $484 | $292 | $512 | $561 | $463 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,408 | $7,520 | $12,700 | $5,000 | $29,650 | $4,380 | $19,400 | $7,000 | $20,000 | $22,749 | 2% |
| 659E00300 TOPSOIL | 275 CY | $22.55 | $37.00 | $67.00 | $10.00 | $35.00 | $18.00 | $45.81 | $22.00 | $38.00 | $44.46 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 30 CY | $203 | $87.85 | $117 | $115 | $118 | $129 | $69.00 | $123 | $116 | $93.11 | 2% |
| 6 EACH |
| $711 |
| $108 |
| $527 |
| $500 |
| $2,350 |
| $488 |
| $550 |
| $134 |
| $285 |
| $391 |
| 202E23000 PAVEMENT REMOVED, (ASPHALT) | 427 SY | $8.17 | $3.20 | $9.60 | $13.00 | $7.00 | $4.97 | $19.00 | $8.58 | $16.00 | $19.60 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 106 FT | $10.16 | $3.76 | $14.00 | $10.00 | $19.00 | $3.90 | $12.00 | $4.00 | $25.00 | $24.63 |
| 202E35200 PIPE REMOVED, OVER 24" | 139 FT | $36.26 | $21.20 | $14.00 | $45.00 | $27.00 | $54.71 | $73.00 | $19.50 | $23.00 | $40.86 |
| 202E38000 GUARDRAIL REMOVED | 281 FT | $9.65 | $2.92 | $2.00 | $3.00 | $6.00 | $2.10 | $2.50 | $2.50 | $8.00 | $2.08 |
| 202E75000 FENCE REMOVED | 183 FT | $3.29 | $3.20 | $4.00 | $1.00 | $8.00 | $4.20 | $7.00 | $3.00 | $5.00 | $4.56 |
| 204E10000 SUBGRADE COMPACTION | 475 SY | $2.58 | $2.05 | $2.60 | $4.00 | $2.00 | $1.95 | $3.10 | $1.00 | $1.50 | $4.01 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 2 EACH | $2,952 | $3,095 | $2,480 | $2,300 | $3,250 | $2,604 | $2,890 | $2,756 | $3,000 | $2,579 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 4 EACH | $763 | $1,139 | $625 | $1,000 | $1,200 | $656 | $995 | $694 | $1,100 | $650 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $151 | $150 | $307 | $100 | $260 | $247 | $145 | $400 | $182 | $260 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 25 CY | $154 | $91.88 | $144 | $115 | $118 | $113 | $73.00 | $132 | $98.00 | $89.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 6 CY | $539 | $132 | $215 | $150 | $118 | $145 | $460 | $190 | $103 | $98.20 |
| 659E10000 SEEDING AND MULCHING | 2,475 SY | $1.75 | $2.00 | $1.40 | $1.90 | $2.60 | $2.05 | $2.40 | $2.17 | $2.60 | $4.58 |
| 659E14000 REPAIR SEEDING AND MULCHING | 123 SY | $1.00 | $1.00 | $1.40 | $0.10 | $1.00 | $0.53 | $4.00 | $56.00 | $1.80 | $1.14 |
| 659E20000 COMMERCIAL FERTILIZER | 0.55 TON | $1,223 | $750 | $610 | $700 | $555 | $404 | $941 | $428 | $573 | $1,032 |
| 659E31000 LIME | 0.52 ACRE | $379 | $200 | $80.00 | $150 | $221 | $52.50 | $600 | $56.00 | $50.00 | $205 |
| 659E35000 WATER | 14 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.50 | $2.55 | $10.00 | $1.00 | $1.00 | $18.57 |
| 670E00510 SLOPE EROSION PROTECTION MAT, TYPE A | 763 SY | $3.24 | $10.00 | $2.10 | $2.50 | $2.60 | $2.63 | $2.50 | $3.00 | $2.00 | $2.08 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 455 SY | $4.86 | $10.00 | $2.10 | $2.50 | $2.60 | $2.73 | $2.50 | $3.00 | $2.00 | $2.34 |
| 611E06400 15" CONDUIT, TYPE D | 98 FT | $31.93 | $25.94 | $55.00 | $85.00 | $35.00 | $72.59 | $44.00 | $50.80 | $62.00 | $49.28 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 600 SY | $1.00 | $17.50 | $38.00 | $25.00 | $50.00 | $111 | $17.00 | $118 | $63.25 | $110 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 27 CY | $158 | $151 | $145 | $110 | $95.00 | $91.95 | $108 | $85.00 | $68.00 | $89.93 |
| 407E10000 TACK COAT | 70 GAL | $6.37 | $21.00 | $2.00 | $15.00 | $13.00 | $2.63 | $2.00 | $2.78 | $3.50 | $2.60 |
| 621E00100 RPM | 4 EACH | $448 | $370 | $645 | $950 | $1,640 | $218 | $1,600 | $175 | $525 | $368 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $37.69 | $24.83 | $21.50 | $10.00 | $550 | $15.60 | $37.00 | $40.00 | $42.00 | $11.09 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 8 EACH | $8.40 | $15.00 | $7.25 | $10.00 | $8.75 | $7.61 | $12.00 | $8.05 | $8.00 | $7.54 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 42 FT | $13.97 | $13.00 | $15.00 | $15.00 | $13.00 | $15.75 | $12.00 | $16.67 | $12.00 | $15.60 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $47.78 | $5.00 | $10.00 | $25.00 | $45.00 | $10.50 | $13.00 | $11.11 | $41.25 | $10.40 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $97.31 | $85.00 | $85.00 | $80.00 | $92.00 | $89.25 | $55.00 | $94.44 | $84.00 | $88.40 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 8 EACH | $48.65 | $5.00 | $15.00 | $15.00 | $46.00 | $15.75 | $13.00 | $16.67 | $42.00 | $15.60 |
| 646E10010 EDGE LINE, 6" | 0.08 MILE | $15,572 | $12,000 | $38,510 | $45,000 | $93,500 | $102,900 | $41,182 | $42,789 | $38,500 | $12,272 |
| 646E10200 CENTER LINE | 0.04 MILE | $13,687 | $13,000 | $39,896 | $50,000 | $137,500 | $103,950 | $42,664 | $44,329 | $40,000 | $12,272 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $72.49 | $100 | $65.00 | $60.00 | $82.50 | $68.25 | $59.00 | $90.00 | $65.00 | $67.60 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $1.00 | $100 | $350 | $75.00 | $550 | $210 | $285 | $50.00 | $250 | $180 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.04 MILE | $1.00 | $37,000 | $55,950 | $5,000 | $54,700 | $75,323 | $59,825 | $39,989 | $36,000 | $85,020 |
| 616E10000 WATER | 15 MGAL | $1.00 | $10.00 | $15.00 | $1.00 | $130 | $2.55 | $10.00 | $1.00 | $1.15 | $19.94 |
| 617E10100 COMPACTED AGGREGATE | 75 CY | $1.00 | $115 | $174 | $40.00 | $120 | $91.95 | $94.00 | $30.00 | $87.00 | $121 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,860 | $4,200 | $3,297 | $7,000 | $550 | $6,020 | $7,131 | $6,800 | $7,200 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 602E20000 CONCRETE MASONRY | 60 CY | $776.79 | $47k | 13% |
| 832E30000 EROSION CONTROL | 27,962 EACH | $1 | $28k | 8% |
| 203E10000 EXCAVATION | 792 CY | $25.55 | $20k | 6% |
| 611E22200 54" CONDUIT, TYPE A, 707.02 (0.188) WITH CONCRETE | 62 FT | $264.69 | $16k | 5% |
| 203E20000 EMBANKMENT | 562 CY | $27.59 | $16k | 4% |
| 611E22200 54" CONDUIT, TYPE A, 707.02 (0.28), 706.02, 707.33 | 64 FT | $240.1 | $15k | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $14,603 | $15k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $14,209 | $14k | 4% |
| 601E11000 RIPRAP, TYPE D | 86 SY | $160.61 | $14k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 62 CY | $211.21 | $13k | 4% |