PIK-CR 66-04.36
PIK County · est $3.5M
Bid dateThursday, March 11—
PIK County · est $3.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 99 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Kokosing Construction Company INC | R3Complete General Construction Company | R4Shelly & Sands INC | R5Allard Excavation LLC | R6Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 4,280 FT | $73.50 | $55.00 | $90.00 | $64.00 | $111 | $101 | 12% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 1,521 FT | $180 | $144 | $154 | $144 | $157 | $169 | 11% |
| 203E10000 EXCAVATION | 10,238 CY | $21.50 | $15.10 |
| Item | Quantity | R1Alan Stone CO INC | R2Kokosing Construction Company INC | R3Complete General Construction Company | R4Shelly & Sands INC | R5Allard Excavation LLC | R6Sunesis Construction CO |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 6,519 SY | $6.50 | $5.20 | $6.00 | $6.50 | $6.30 | $7.52 |
| 202E30000 WALK REMOVED | 168 SF | $2.00 | $2.00 | $3.00 | $2.00 | $0.72 | $2.71 |
| 202E30200 STEPS REMOVED | 15 FT | $1.50 | $6.00 | $31.00 | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $14.00 |
| $13.50 |
| $17.43 |
| $20.06 |
| 9% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 2,620 FT | $83.00 | $120 | $110 | $92.00 | $121 | $195 | 9% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W27X84 | 3,267 FT | $58.00 | $68.00 | $65.00 | $57.00 | $68.50 | $64.26 | 7% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 406 CY | $415 | $785 | $650 | $1,125 | $309 | $690 | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,030 CY | $156 | $131 | $131 | $125 | $157 | $125 | 6% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG SHAFT, 42" DIAMETER, U | 1,750 FT | $77.00 | $90.00 | $75.00 | $105 | $140 | $134 | 5% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP14X117 | 1,578 FT | $72.50 | $85.00 | $76.00 | $70.00 | $83.90 | $85.64 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (557 CY | $168 | $142 | $142 | $135 | $162 | $135 | 4% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP14X73 | 1,895 FT | $46.00 | $53.00 | $47.00 | $45.00 | $53.64 | $51.58 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE THICK | 4,535 SY | $18.00 | $5.85 | $4.50 | $14.55 | $5.85 | $14.55 | 3% |
| 659E10000 SEEDING AND MULCHING | 27,127 SY | $3.00 | $0.55 | $0.55 | $0.60 | $0.63 | $2.65 | 3% |
| 304E20000 AGGREGATE BASE | 1,462 CY | $50.50 | $67.00 | $56.00 | $60.00 | $53.60 | $62.01 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 401 CY | $180 | $152 | $152 | $145 | $157 | $145 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $61,000 | $40,000 | $50,000 | $47,000 | $34,000 | $44,400 | 2% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 300 FT | $180 | $60.00 | $90.00 | $64.00 | $90.35 | $215 | 2% |
| 832E30000 EROSION CONTROL | 52,643 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 990 FT | $52.00 | $17.00 | $50.00 | $35.00 | $42.60 | $42.60 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 32,440 LB | $1.50 | $1.40 | $1.49 | $1.75 | $1.47 | $1.51 | 2% |
| $8.00 |
| $18.84 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 315 FT | $24.00 | $30.00 | $23.00 | $30.00 | $12.89 | $14.73 |
| 202E38000 GUARDRAIL REMOVED | 2,629 FT | $1.50 | $1.80 | $2.00 | $1.80 | $2.00 | $1.40 |
| 202E38800 GUARD POST REMOVED | 2 EACH | $93.50 | $25.00 | $20.00 | $25.00 | $20.00 | $50.00 |
| 202E53100 MAILBOX REMOVED | 10 EACH | $57.00 | $50.00 | $15.00 | $25.00 | $15.00 | $25.00 |
| 202E56100 BUILDING DEMOLISHED, PARCEL 5-WD | 3 EACH | $1,900 | $4,500 | $5,440 | $4,500 | $2,656 | $5,167 |
| 202E75000 FENCE REMOVED | 495 FT | $2.00 | $4.00 | $4.00 | $4.00 | $1.83 | $6.03 |
| 202E75250 GATE REMOVED | 2 EACH | $187 | $220 | $220 | $200 | $91.00 | $629 |
| 202E98100 REMOVAL MISC.: FLAG POLE REMOVED | 1 EACH | $187 | $300 | $200 | $150 | $302 | $423 |
| 202E98200 REMOVAL MISC.: TIMBER RETAINING WALL REMOVED | 238 FT | $4.50 | $3.50 | $2.00 | $1.00 | $16.84 | $15.00 |
| 203E20000 EMBANKMENT | 3,892 CY | $4.50 | $3.00 | $4.00 | $13.50 | $12.50 | $13.28 |
| 204E10000 SUBGRADE COMPACTION | 9,186 SY | $2.50 | $2.00 | $2.50 | $3.50 | $3.00 | $1.73 |
| 204E13000 EXCAVATION OF SUBGRADE | 484 CY | $20.50 | $11.50 | $16.00 | $19.00 | $17.00 | $37.15 |
| 204E20000 EMBANKMENT | 868 CY | $8.00 | $4.00 | $12.00 | $9.50 | $18.34 | $13.65 |
| 204E45000 PROOF ROLLING | 4 HOUR | $293 | $140 | $290 | $650 | $72.00 | $211 |
| 606E13000 GUARDRAIL, TYPE 5 | 243.75 FT | $22.00 | $17.80 | $18.40 | $17.80 | $18.40 | $18.90 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,162.5 FT | $22.50 | $18.50 | $18.20 | $18.50 | $18.60 | $18.90 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 1 EACH | $1,500 | $1,250 | $1,120 | $1,250 | $1,120 | $1,085 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 6 EACH | $1,500 | $1,250 | $1,180 | $1,250 | $1,180 | $1,085 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $1,100 | $900 | $725 | $900 | $725 | $885 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,200 | $1,000 | $975 | $1,000 | $975 | $885 |
| 606E32161 BRIDGE TERMINAL ASSEMBLY, TYPE TST, AS PER PLAN | 1 EACH | $3,100 | $2,500 | $2,650 | $2,500 | $2,650 | $2,275 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,400 | $1,950 | $2,180 | $1,950 | $2,240 | $2,275 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 3 EACH | $978 | $800 | $840 | $800 | $840 | $975 |
| 623E40500 REFERENCE MONUMENT | 25 EACH | $283 | $340 | $525 | $650 | $360 | $240 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 10 EACH | $168 | $175 | $145 | $175 | $145 | $548 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $291 | $135 | $130 | $120 | $244 | $336 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 9.5 CY | $191 | $305 | $200 | $220 | $99.60 | $157 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,356 SY | $6.00 | $0.55 | $0.55 | $0.50 | $0.05 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 3.78 TON | $672 | $605 | $605 | $400 | $400 | $500 |
| 659E31000 LIME | 5.6 ACRE | $861 | $80.00 | $80.00 | $75.00 | $75.00 | $200 |
| 659E35000 WATER | 150 MGAL | $122 | $1.00 | $1.00 | $0.50 | $0.50 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 2,120 SY | $2.00 | $2.00 | $2.00 | $1.90 | $1.90 | $2.15 |
| 670E00700 DITCH EROSION PROTECTION | 407 SY | $5.50 | $2.25 | $2.25 | $1.90 | $1.90 | $1.95 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,100 | $2,425 | $2,500 | $3,000 | $2,425 | $2,425 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,600 | $4,000 | $4,100 | $6,000 | $6,800 | $3,120 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,000 | $7,000 | $8,600 | $9,000 | $8,600 | $8,569 |
| 602E20000 CONCRETE MASONRY | 2.6 CY | $2,000 | $3,300 | $2,500 | $2,000 | $4,254 | $2,170 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,789 FT | $12.00 | $11.00 | $12.00 | $11.00 | $11.06 | $8.15 |
| 605E31100 AGGREGATE DRAINS | 1,098 FT | $9.50 | $14.00 | $8.50 | $12.00 | $17.85 | $9.38 |
| 611E00406 4" CONDUIT, TYPE F | 39 FT | $30.50 | $38.00 | $47.00 | $22.00 | $12.00 | $33.07 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $28.00 | $30.00 | $21.00 | $20.00 | $34.60 | $30.16 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $28.00 | $30.00 | $12.00 | $17.00 | $32.50 | $30.16 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $28.00 | $30.00 | $12.00 | $17.00 | $32.50 | $30.16 |
| 611E04400 12" CONDUIT, TYPE B | 44 FT | $74.00 | $90.00 | $95.00 | $75.00 | $35.00 | $60.25 |
| 611E04900 12" CONDUIT, TYPE D | 30 FT | $40.00 | $75.00 | $74.00 | $65.00 | $98.00 | $65.47 |
| 611E05700 15" CONDUIT, TYPE A, 706.02, 707.01 (ALUMINIZED), | 94 FT | $101 | $90.00 | $89.00 | $90.00 | $101 | $77.78 |
| 611E05900 15" CONDUIT, TYPE B | 85 FT | $104 | $100 | $99.00 | $75.00 | $100 | $74.08 |
| 611E06100 15" CONDUIT, TYPE C | 63 FT | $63.50 | $100 | $89.00 | $80.00 | $104 | $74.88 |
| 611E06400 15" CONDUIT, TYPE D | 70 FT | $53.00 | $70.00 | $68.00 | $65.00 | $106 | $71.89 |
| 611E07900 18" CONDUIT, TYPE D | 120 FT | $57.00 | $75.00 | $83.00 | $65.00 | $83.00 | $58.19 |
| 611E11700 27" CONDUIT, TYPE A, 706.02, 707.01 (ALUMINIZED), | 54 FT | $183 | $120 | $127 | $140 | $208 | $176 |
| 611E98180 CATCH BASIN, NO. 3A | 3 EACH | $2,000 | $3,000 | $2,750 | $2,800 | $3,654 | $2,349 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,100 | $2,800 | $3,850 | $2,800 | $3,815 | $3,280 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $287 | $425 | $300 | $250 | $295 | $296 |
| 407E10000 TACK COAT | 1,016 GAL | $2.50 | $2.00 | $2.00 | $2.00 | $1.85 | $2.00 |
| 408E10000 PRIME COAT | 17 GAL | $18.50 | $30.00 | $50.00 | $15.00 | $4.00 | $15.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 732 CY | $54.50 | $60.00 | $70.00 | $80.00 | $54.00 | $48.34 |
| 609E26000 CURB, TYPE 6 | 992 FT | $25.00 | $18.00 | $19.00 | $17.00 | $30.00 | $17.71 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 37 EACH | $10.50 | $8.50 | $8.00 | $8.50 | $7.50 | $8.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 47 FT | $14.50 | $9.50 | $10.00 | $12.00 | $10.00 | $9.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 115 FT | $15.50 | $10.50 | $11.00 | $12.50 | $11.00 | $10.50 |
| 630E80100 SIGN, FLAT SHEET | 52 SF | $24.50 | $14.00 | $25.00 | $20.00 | $25.00 | $14.00 |
| 630E84901 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, AS PE | 35 EACH | $30.50 | $10.00 | $20.00 | $25.00 | $20.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 8 EACH | $85.50 | $45.00 | $65.00 | $70.00 | $65.00 | $45.00 |
| 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 27 EACH | $30.50 | $10.00 | $25.00 | $25.00 | $25.00 | $10.00 |
| 644E00100 EDGE LINE, 4" | 1.74 MILE | $3,400 | $2,800 | $2,800 | $2,800 | $2,800 | $2,800 |
| 644E00300 CENTER LINE | 0.87 MILE | $5,500 | $4,520 | $4,520 | $4,520 | $4,520 | $4,520 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 3 FT | $5.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 175 CY | $71.50 | $60.00 | $75.00 | $59.00 | $54.00 | $59.61 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $65.00 | $55.00 | $85.00 | $65.00 | $85.00 | $65.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $8,500 | $18,000 | $10,875 | $4,500 | $10,875 | $14,130 |
| 614E12420 DETOUR SIGNING | 1 LS | $9,200 | $3,600 | $5,000 | $6,500 | $4,650 | $7,745 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 21 EACH | $30.50 | $9.75 | $6.30 | $10.00 | $11.00 | $7.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 21 EACH | $18.50 | $17.50 | $17.00 | $15.00 | $15.00 | $15.00 |
| 616E10000 WATER | 46 MGAL | $0.01 | $65.00 | $80.00 | $40.00 | $1.00 | $9.58 |
| 203E35150 GRANULAR MATERIAL, TYPE F | 15 CY | $155 | $60.00 | $120 | $58.00 | $108 | $117 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $2,500 | $46,150 | $60,000 | $175,000 | $8,750 | $1,161 |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP14X89 | 876 FT | $55.00 | $68.00 | $60.00 | $57.00 | $66.25 | $66.46 |
| 511E81300 CONCRETE, MISC.: 8" X 24" X 69" PRECAST CONCRETE L | 63 EACH | $179 | $225 | $450 | $210 | $410 | $401 |
| 511E81300 CONCRETE, MISC.: 8" X 24" X 69" PRECAST CONCRETE L | 30 EACH | $179 | $225 | $450 | $225 | $607 | $401 |
| 511E81300 CONCRETE, MISC.: 8" X 24" X 93" PRECAST CONCRETE L | 41 EACH | $241 | $300 | $460 | $300 | $520 | $452 |
| 511E81300 CONCRETE, MISC.: 8" X 24" X 93" PRECAST CONCRETE L | 47 EACH | $410 | $300 | $460 | $300 | $537 | $452 |
| 511E81300 CONCRETE, MISC.: 8" X 36" X 69" PRECAST CONCRETE L | 69 EACH | $235 | $320 | $480 | $260 | $464 | $475 |
| 511E81300 CONCRETE, MISC.: 8" X 36" X 69" PRECAST CONCRETE L | 30 EACH | $235 | $320 | $460 | $275 | $695 | $475 |
| 511E81300 CONCRETE, MISC.: 8" X 36" X 93" PRECAST CONCRETE L | 94 EACH | $319 | $410 | $460 | $370 | $647 | $551 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 959 SY | $22.00 | $19.50 | $18.00 | $18.00 | $18.00 | $19.99 |
| 512E33000 TYPE 2 WATERPROOFING | 16 SY | $44.50 | $40.00 | $35.00 | $50.00 | $76.00 | $76.88 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 118 SF | $1.50 | $5.00 | $12.00 | $2.00 | $1.70 | $4.95 |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 420 FT | $67.50 | $115 | $105 | $82.00 | $96.35 | $192 |
| 530E00600 SPECIAL - STRUCTURES: PREFABRICATED GEOCOMPOSITE D | 3,537 SF | $2.50 | $1.00 | $2.50 | $2.25 | $1.40 | $5.30 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $6,000 | $3,000 | $5,000 | $7,661 | $7,500 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $10,000 | $25,000 | $22,500 | $45,900 | $20,608 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $20,000 | $11,000 | $25,700 | $6,600 | $5,355 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $1,200 | $3,000 | $2,000 | $2,400 | $1,200 | $1,243 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $33,000 | $35,000 | $20,000 | $45,000 | $35,000 | $29,700 |
| 624E10000 MOBILIZATION | 1 LS | $38,000 | $100,000 | $100,000 | $100,000 | $150,000 | $97,377 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 4,280 FT | $73.5 | $315k | 9% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 1,521 FT | $180 | $274k | 8% |
| 203E10000 EXCAVATION | 10,238 CY | $21.5 | $220k | 7% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 2,620 FT | $83 | $217k | 6% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W27X84 | 3,267 FT | $58 | $189k | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 406 CY | $415 | $168k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,030 CY | $156 | $161k | 5% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG SHAFT, 42" DIAMETER, U | 1,750 FT | $77 | $135k | 4% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP14X117 | 1,578 FT | $72.5 | $114k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (557 CY | $168 | $94k | 3% |