ATH-Embrey Street
ATH County · est $0.4M
Bid dateThursday, July 15—
ATH County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1D G M INC | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Buds INC | R5George J Igel & CO INC | R6Complete General Construction Company | R7J & J Bridge Company INC | R8Eclipse CO LLC | R9Clearwater Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E71000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 24 FT | $4,100 | $3,011 | $3,400 | $4,000 | $3,200 | $3,200 | $4,250 | $3,600 | $5,756 | 23% |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 560 FT | $175 |
| Item | Quantity | R1D G M INC | R2Shelly & Sands INC | R3Axis Civil Construction LLC | R4Buds INC | R5George J Igel & CO INC | R6Complete General Construction Company | R7J & J Bridge Company INC | R8Eclipse CO LLC | R9Clearwater Construction INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 106 SY | $10.00 | $10.50 | $10.00 | $25.00 | $10.00 | $12.00 | $10.00 | $83.00 | $13.00 |
| 202E38000 GUARDRAIL REMOVED | 66 FT | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $150 |
| $162 |
| $171 |
| $160 |
| $170 |
| $180 |
| $212 |
| $250 |
| 23% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 360 FT | $63.00 | $38.75 | $42.00 | $43.00 | $50.00 | $65.00 | $50.00 | $39.00 | $70.00 | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 27 CY | $700 | $1,221 | $1,050 | $1,400 | $760 | $1,100 | $1,200 | $1,273 | $1,650 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $18,000 | $28,500 | $25,000 | $9,000 | $35,000 | $25,000 | $500 | $166,402 | $2,000 | 4% |
| 611E97600 CONDUIT, MISC.: GRANUALR STRUCTURAL BACKFILL | 703 (256 CY | $62.50 | $92.00 | $90.00 | $108 | $85.00 | $85.00 | $115 | $90.50 | $120 | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 28 CY | $525 | $983 | $650 | $950 | $710 | $570 | $1,250 | $783 | $2,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $4,250 | $4,000 | $6,500 | $7,000 | $4,500 | $4,000 | $7,500 | $4,000 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 35 CY | $390 | $400 | $250 | $297 | $390 | $297 | $300 | $350 | $375 | 3% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 10 CY | $1,250 | $1,836 | $1,750 | $2,500 | $1,510 | $1,300 | $1,300 | $2,689 | $5,000 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 7,464 LB | $1.50 | $2.25 | $2.00 | $1.85 | $2.00 | $2.45 | $2.50 | $2.50 | $3.50 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $11,000 | $1,500 | $5,000 | $2,000 | $2,000 | $5,000 | $100 | $6,500 | $1,500 | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $10,000 | $11,275 | $18,000 | $12,000 | $55,600 | $60,000 | $26,000 | $27,500 | $60,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 19 CY | $520 | $450 | $250 | $521 | $515 | $521 | $500 | $375 | $500 | 2% |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 480 FT | $20.00 | $44.00 | $18.00 | $3.00 | $28.00 | $10.00 | $3.00 | $99.50 | $165 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $2,750 | $3,500 | $5,000 | $3,000 | $5,000 | $25,000 | $14,500 | $1.00 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $9,000 | $12,250 | $20,000 | $7,500 | $20,000 | $30,000 | $20,000 | $11,500 | $15,000 | 2% |
| 606E15350 GUARDRAIL, TYPE MGS WITH SOCKETED POSTS | 62.5 FT | $140 | $95.00 | $130 | $95.00 | $200 | $160 | $150 | $160 | $24.60 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $8,000 | $10,000 | $20,000 | $8,000 | $20,000 | $20,000 | $15,000 | $46,658 | $21,155 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 2 EACH | $3,500 | $2,400 | $3,400 | $2,400 | $2,300 | $2,300 | $2,500 | $2,400 | $179 | 2% |
| $5.50 |
| $5.00 |
| $2.00 |
| $5.00 |
| $3.00 |
| $5.00 |
| $4.50 |
| $7.00 |
| 203E10000 EXCAVATION | 21 CY | $50.00 | $46.00 | $30.00 | $25.00 | $25.00 | $40.00 | $75.00 | $33.50 | $7.00 |
| 203E20000 EMBANKMENT | 13 CY | $50.00 | $20.00 | $30.00 | $60.00 | $50.00 | $60.00 | $110 | $45.00 | $85.00 |
| 204E10000 SUBGRADE COMPACTION | 230 SY | $8.00 | $6.50 | $3.00 | $3.00 | $5.00 | $3.50 | $5.00 | $3.00 | $150 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 187.5 FT | $26.00 | $24.00 | $24.75 | $24.00 | $28.70 | $28.70 | $30.00 | $29.00 | $6.50 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,000 | $1,100 | $985 | $1,100 | $1,050 | $1,050 | $1,200 | $1,100 | $2,820 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 247 SY | $12.00 | $8.11 | $11.00 | $4.00 | $14.00 | $8.12 | $4.00 | $11.50 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $650 | $743 | $620 | $600 | $743 | $743 | $10,000 | $651 | $300 |
| 659E31000 LIME | 0.04 ACRE | $100 | $196 | $80.00 | $300 | $196 | $197 | $11,000 | $84.00 | $300 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $0.10 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 93 FT | $6.00 | $10.00 | $5.00 | $4.00 | $6.00 | $3.00 | $8.00 | $7.50 | $7.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" MAX. | 36 SY | $60.00 | $38.00 | $50.00 | $133 | $62.00 | $98.00 | $50.00 | $26.00 | $60.00 |
| 304E20000 AGGREGATE BASE | 37 CY | $90.00 | $106 | $95.00 | $95.00 | $80.00 | $118 | $125 | $74.50 | $100 |
| 407E20000 NON-TRACKING TACK COAT | 28 GAL | $5.00 | $3.00 | $5.00 | $4.00 | $5.00 | $4.00 | $3.00 | $15.00 | $5.00 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1 CY | $520 | $450 | $250 | $521 | $515 | $521 | $500 | $375 | $500 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 8 EACH | $10.00 | $8.50 | $8.00 | $8.00 | $10.00 | $10.00 | $10.00 | $10.50 | $7.25 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 13 FT | $15.00 | $12.50 | $12.50 | $12.50 | $12.00 | $12.00 | $15.00 | $12.50 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $20.00 | $45.00 | $50.00 | $12.50 | $20.00 | $20.00 | $20.00 | $21.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $75.00 | $45.00 | $45.00 | $45.00 | $50.00 | $50.00 | $30.00 | $52.50 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $45.00 | $50.00 | $10.00 | $20.00 | $20.00 | $25.00 | $21.00 | $20.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,500 | $3,500 | $3,250 | $3,500 | $3,250 | $3,250 | $3,250 | $3,255 | $3,250 |
| 616E10000 WATER | 1 MGAL | $1.00 | $41.00 | $1.00 | $1.00 | $50.00 | $125 | $10.00 | $64.00 | $0.10 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $5,000 | $15,650 | $24,000 | $25,000 | $8,000 | $10,000 | $24,000 | $38,000 | $14,000 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 320 FT | $10.00 | $24.00 | $5.00 | $3.00 | $10.00 | $10.00 | $3.00 | $54.50 | $70.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 57 SY | $35.00 | $35.00 | $52.00 | $25.00 | $21.50 | $35.00 | $52.00 | $23.00 | $33.00 |
| 512E33000 TYPE 2 WATERPROOFING | 136 SY | $14.00 | $23.50 | $18.00 | $24.00 | $25.00 | $23.50 | $25.00 | $20.50 | $50.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 46 SF | $20.00 | $1.75 | $5.00 | $15.00 | $15.00 | $12.00 | $5.00 | $7.00 | $5.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 15 CY | $100 | $194 | $180 | $165 | $160 | $110 | $200 | $113 | $200 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 35 CY | $100 | $263 | $90.00 | $150 | $125 | $98.00 | $150 | $94.00 | $150 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $5,000 | $6,000 | $3,500 | $6,000 | $4,000 | $1,000 | $9,500 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E71000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 24 FT | $4,100 | $98k | 21% |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 560 FT | $175 | $98k | 21% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 360 FT | $63 | $23k | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 27 CY | $700 | $19k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $18,000 | $18k | 4% |
| 611E97600 CONDUIT, MISC.: GRANUALR STRUCTURAL BACKFILL | 703 (256 CY | $62.5 | $16k | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 28 CY | $525 | $15k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $14k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 35 CY | $390 | $14k | 3% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 10 CY | $1,250 | $13k | 3% |