CUY-US 42-11.01
CUY County · est $1.8M
Bid dateThursday, July 29—
CUY County · est $1.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Shelly Company | R3Perk Company INC | R4Terrace Construction CO INC | R5Chagrin Valley Paving INC | R6Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 10,327 SY | $32.00 | $25.00 | $27.00 | $30.00 | $25.00 | $45.00 | 17% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2183 CY | $140 | $130 | $140 | $163 | $150 | $150 | 15% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,560 CY | $185 | $175 | $180 |
| Item | Quantity | R1Ronyak Paving INC | R2Shelly Company | R3Perk Company INC | R4Terrace Construction CO INC | R5Chagrin Valley Paving INC | R6Karvo Companies INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $1,500 | $500 | $34,714 | $100 | $2,800 |
| 202E23000 PAVEMENT REMOVED | 700 SY | $15.00 | $15.00 | $17.00 | $15.75 | $25.00 | $25.00 |
| 202E30000 WALK REMOVED | 4,463 SF | $1.75 | $1.75 | $2.00 | $0.65 | $2.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $221 |
| $160 |
| $185 |
| 15% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 2,249 SY | $75.00 | $115 | $70.00 | $100 | $70.00 | $90.00 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $145,000 | $345,000 | $209,500 | $95,791 | $278,500 | $250,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $136,797 | $100,000 | $122,715 | $25,252 | $145,000 | $170,000 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3" MIN) | 44,811 SY | $3.00 | $1.55 | $3.00 | $6.00 | $4.00 | $3.00 | 7% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 89 EACH | $700 | $700 | $950 | $903 | $1,000 | $915 | 3% |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 700 SY | $77.00 | $77.00 | $80.00 | $86.75 | $125 | $75.00 | 3% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 30,000 LB | $1.60 | $1.75 | $1.50 | $1.70 | $1.75 | $1.75 | 2% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 4,416 FT | $10.00 | $10.00 | $3.50 | $12.00 | $15.00 | $10.00 | 2% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 61 EACH | $565 | $565 | $750 | $460 | $900 | $800 | 2% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 1,134 FT | $30.00 | $31.50 | $51.00 | $31.20 | $50.00 | $25.00 | 2% |
| 608E52000 CURB RAMP | 1,684 SF | $20.00 | $20.00 | $32.00 | $19.05 | $30.00 | $15.00 | 2% |
| 202E98200 REMOVAL MISC.: TRENCH DRAIN | 159 FT | $200 | $200 | $135 | $52.10 | $25.00 | $45.00 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 42 EACH | $725 | $725 | $950 | $881 | $1,250 | $1,050 | 2% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 609E26000 CURB, TYPE 6 | 1,032 FT | $28.00 | $30.00 | $50.00 | $31.25 | $50.00 | $25.00 | 1% |
| 202E32000 CURB REMOVED | 2,166 FT | $9.50 | $9.50 | $9.75 | $6.25 | $7.50 | $25.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,712 | $16,500 | $28,500 | $13,636 | $25,000 | $20,000 | 1% |
| $4.00 |
| 204E10000 SUBGRADE COMPACTION | 700 SY | $1.00 | $1.00 | $2.50 | $0.45 | $1.00 | $0.99 |
| 209E60200 LINEAR GRADING | 66 STA | $150 | $75.00 | $5.00 | $145 | $75.00 | $250 |
| 608E10000 4" CONCRETE WALK | 1,915 SF | $7.50 | $7.50 | $11.50 | $5.45 | $15.00 | $6.00 |
| 608E10001 4" CONCRETE WALK, AS PER PLAN (STAMPED COLORED) | 276 SF | $20.00 | $20.00 | $55.00 | $15.00 | $50.00 | $25.00 |
| 608E98000 WALKWAY, MISC.: BRICK PAVERS | 554 SF | $15.00 | $15.00 | $65.00 | $18.05 | $50.00 | $30.00 |
| 608E98200 WALKWAY, MISC.: CURB RAMP, AS PER PLAN | 1 EACH | $7,200 | $7,200 | $9,500 | $3,107 | $5,000 | $5,500 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 6 EACH | $555 | $555 | $950 | $590 | $900 | $750 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $50.00 | $50.00 | $210 | $250 | $200 |
| 659E00300 TOPSOIL | 20 CY | $60.00 | $60.00 | $95.00 | $63.00 | $250 | $75.00 |
| 659E10000 SEEDING AND MULCHING | 355 SY | $10.00 | $10.00 | $35.00 | $10.50 | $15.00 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 18 SY | $0.50 | $0.50 | $20.00 | $10.50 | $10.00 | $0.25 |
| 659E15000 INTER-SEEDING | 18 SY | $0.50 | $0.50 | $20.00 | $10.50 | $10.00 | $0.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $17.00 | $17.00 | $1,100 | $966 | $1,500 | $1,000 |
| 659E31000 LIME | 0.07 ACRE | $600 | $600 | $1,100 | $52.57 | $1,000 | $750 |
| 659E35000 WATER | 1 MGAL | $1.00 | $1.00 | $200 | $210 | $100 | $1.00 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $4,000 | $4,000 | $6,500 | $3,575 | $5,000 | $4,000 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 3 EACH | $1,240 | $1,240 | $1,100 | $1,790 | $1,750 | $1,500 |
| 611E99154 INLET RECONSTRUCTED TO GRADE | 1 EACH | $1,550 | $1,550 | $1,200 | $1,790 | $2,000 | $1,800 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 3 EACH | $1,090 | $1,090 | $1,100 | $1,202 | $1,250 | $1,200 |
| 611E99830 SPECIAL - TRENCH DRAIN | 9 FT | $500 | $1,000 | $1,300 | $653 | $750 | $675 |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 107 SY | $140 | $150 | $220 | $121 | $300 | $150 |
| 304E20000 AGGREGATE BASE | 120 CY | $75.00 | $50.00 | $75.00 | $62.25 | $100 | $100 |
| 407E20000 NON-TRACKING TACK COAT | 6,722 GAL | $2.00 | $2.50 | $2.00 | $4.45 | $2.00 | $2.47 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 6,557 LB | $2.00 | $1.40 | $2.50 | $1.60 | $2.00 | $1.00 |
| 642E00200 LANE LINE, 4", TYPE 1 | 2.77 MILE | $450 | $450 | $500 | $525 | $500 | $450 |
| 642E00300 CENTER LINE, TYPE 1, DOUBLE SOLID, YELLOW | 0.27 MILE | $1,000 | $1,000 | $800 | $840 | $800 | $1,000 |
| 642E00300 CENTER LINE, TYPE 1, SOLID AND BROKEN, YELLOW | 2.34 MILE | $850 | $850 | $800 | $840 | $800 | $850 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 1,050 FT | $0.50 | $0.50 | $0.95 | $1.00 | $0.95 | $0.50 |
| 642E00500 STOP LINE, TYPE 1 | 293 FT | $3.50 | $3.50 | $3.50 | $3.70 | $3.50 | $3.50 |
| 642E00600 CROSSWALK LINE, TYPE 1 | 2,047 FT | $2.75 | $2.75 | $2.20 | $2.30 | $2.20 | $2.75 |
| 642E01300 LANE ARROW, TYPE 1 | 81 EACH | $40.00 | $40.00 | $55.00 | $57.75 | $55.00 | $40.00 |
| 644E00200 LANE LINE, 4" | 0.15 MILE | $7,500 | $7,500 | $3,500 | $3,675 | $3,500 | $7,500 |
| 644E00300 CENTER LINE | 0.07 MILE | $15,000 | $15,000 | $9,500 | $9,975 | $9,500 | $15,000 |
| 644E00400 CHANNELIZING LINE, 8" | 320 FT | $2.25 | $2.25 | $1.25 | $1.30 | $1.25 | $2.25 |
| 644E00500 STOP LINE | 66 FT | $5.95 | $5.95 | $6.25 | $6.55 | $6.25 | $5.95 |
| 644E01300 LANE ARROW | 5 EACH | $85.00 | $85.00 | $1,500 | $131 | $125 | $85.00 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 8 EACH | $1,500 | $1,250 | $1.00 | $1,190 | $1,500 | $1,250 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $70.00 | $65.00 | $75.00 | $68.25 | $75.00 | $75.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: MAINTAINING EXISTING T | 5 EACH | $1,100 | $1,000 | $1,100 | $2,060 | $1,100 | $6,200 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 1.67 MILE | $500 | $500 | $550 | $578 | $550 | $500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, DOUBLE | 0.56 MILE | $1,200 | $1,200 | $900 | $945 | $900 | $1,200 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, SOLID A | 7.62 MILE | $850 | $850 | $900 | $945 | $900 | $850 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, DO | 0.4 MILE | $12,000 | $12,000 | $10,500 | $11,025 | $10,500 | $12,000 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, SO | 0.32 MILE | $9,000 | $9,000 | $10,500 | $11,025 | $10,500 | $9,000 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 1.03 MILE | $600 | $600 | $700 | $735 | $700 | $600 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.03 MILE | $15,000 | $15,000 | $6,500 | $6,825 | $6,500 | $15,000 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 4,241 FT | $0.50 | $0.50 | $0.85 | $0.90 | $0.85 | $0.50 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 1,459 FT | $2.50 | $2.50 | $2.25 | $2.35 | $2.25 | $2.50 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 550 FT | $3.50 | $3.50 | $3.00 | $3.15 | $3.00 | $3.50 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 69 EACH | $40.00 | $40.00 | $50.00 | $52.50 | $50.00 | $40.00 |
| 616E10000 WATER | 100 MGAL | $10.00 | $1.00 | $10.00 | $24.60 | $1.00 | $10.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,445 | $4,200 | $6,500 | $10,876 | $100 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 10,327 SY | $32 | $330k | 15% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2183 CY | $140 | $306k | 14% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,560 CY | $185 | $289k | 13% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 2,249 SY | $75 | $169k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $145,000 | $145k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $136,797 | $137k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3" MIN) | 44,811 SY | $3 | $134k | 6% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 89 EACH | $700 | $62k | 3% |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 700 SY | $77 | $54k | 2% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 30,000 LB | $1.6 | $48k | 2% |