MED-SR 57-17.65
MED County · est $1.5M
Bid dateThursday, August 12—
MED County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Lockhart Concrete CO | R2Digioia-suburban Excavating LLC | R3Catts Construction INC | R4Fabrizi Trucking & Paving CO INC | R5Mark Schaffer Excavating & Trucking | R6INC Eclipse CO LLC | R7Tri-mor CORP | R8Shelly & Sands INC | R9Great Lakes Construction CO | R10S E T INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E19601 42" CONDUIT, TYPE C, AS PER PLAN | 3,224 FT | $137 | $131 | $194 | $171 | $175 | $137 | $195 | $188 | $215 | $190 | 41% |
| Item | Quantity | R1Lockhart Concrete CO | R2Digioia-suburban Excavating LLC | R3Catts Construction INC | R4Fabrizi Trucking & Paving CO INC | R5Mark Schaffer Excavating & Trucking | R6INC Eclipse CO LLC | R7Tri-mor CORP | R8Shelly & Sands INC | R9Great Lakes Construction CO | R10S E T INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 688 SY | $10.00 | $17.50 | $6.30 | $22.00 | $15.00 | $7.00 | $10.00 | $6.50 | $14.00 | $14.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 611E10601 24" CONDUIT, TYPE C, AS PER PLAN, 706.02 |
| 1,036 FT |
| $100 |
| $97.00 |
| $147 |
| $127 |
| $100 |
| $115 |
| $135 |
| $147 |
| $95.00 |
| $112 |
| 10% |
| 832E30000 EROSION CONTROL | 90,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 8% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $49,000 | $15,350 | $5,875 | $10,000 | $10,000 | $16,000 | $7,500 | $20,000 | $25,000 | $15,697 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $47,900 | $3,550 | $8,300 | $4,500 | $60,000 | $10,340 | $43,000 | $18,000 | $20,000 | $3,740 | 4% |
| 659E00300 TOPSOIL | 1,699 CY | $25.00 | $53.00 | $34.75 | $40.00 | $15.00 | $44.00 | $25.00 | $28.00 | $32.00 | $61.60 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $39,000 | $10,400 | $13,700 | $9,800 | $20,000 | $25,028 | $25,000 | $9,400 | $21,000 | $15,800 | 4% |
| 611E19401 42" CONDUIT, TYPE B, AS PER PLAN | 180 FT | $200 | $141 | $201 | $158 | $200 | $153 | $250 | $176 | $240 | $172 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $34,500 | $20,950 | $16,169 | $23,000 | $40,000 | $40,000 | $12,000 | $40,000 | $55,000 | $200,000 | 3% |
| 203E20001 EMBANKMENT, AS PER PLAN | 1,209 CY | $25.00 | $40.00 | $20.00 | $16.00 | $25.00 | $121 | $9.00 | $65.00 | $30.00 | $10.00 | 3% |
| 451E10010 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1PP | 260 SY | $100 | $70.50 | $57.00 | $80.00 | $60.00 | $87.00 | $66.00 | $106 | $115 | $113 | 2% |
| 452E11050 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 235 SY | $100 | $67.50 | $51.00 | $92.00 | $65.00 | $82.00 | $74.00 | $115 | $75.00 | $108 | 2% |
| 611E98434 CATCH BASIN, NO. 8A | 15 EACH | $1,500 | $4,550 | $4,925 | $6,080 | $8,500 | $6,621 | $5,000 | $6,400 | $6,000 | $3,811 | 2% |
| 611E16401 36" CONDUIT, TYPE B, AS PER PLAN | 124 FT | $150 | $228 | $297 | $332 | $170 | $142 | $275 | $355 | $200 | $228 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,000 | $16,000 | $17,600 | $16,500 | $23,745 | $34,007 | $35,000 | $20,000 | $65,000 | $27,803 | 2% |
| 659E10000 SEEDING AND MULCHING | 15,306 SY | $1.00 | $1.75 | $1.10 | $1.75 | $0.65 | $1.60 | $2.00 | $0.75 | $0.63 | $1.78 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $14,000 | $13,850 | $8,805 | $28,000 | $15,000 | $31,000 | $16,500 | $14,000 | $16,523 | $63,740 | 1% |
| 611E98510 CATCH BASIN, NO. 2-3 | 6 EACH | $2,000 | $2,500 | $3,015 | $4,280 | $4,000 | $3,416 | $2,830 | $3,600 | $2,100 | $2,056 | 1% |
| 203E10000 EXCAVATION | 979 CY | $12.00 | $26.00 | $27.75 | $10.00 | $50.00 | $22.66 | $10.00 | $25.00 | $20.00 | $12.93 | 1% |
| 690E98400 SPECIAL - ACCESS ROAD CONSTRUCTION AND REMOVAL | 1 LS | $10,000 | $42,500 | $13,633 | $60,000 | $50,000 | $45,919 | $45,000 | $43,500 | $15,000 | $31,871 | 1% |
| 74 FT |
| $10.00 |
| $8.00 |
| $3.00 |
| $25.00 |
| $10.00 |
| $6.00 |
| $10.00 |
| $3.00 |
| $3.00 |
| $5.00 |
| 202E32500 CURB AND GUTTER REMOVED | 73 FT | $10.00 | $10.00 | $3.00 | $25.00 | $10.00 | $6.00 | $10.00 | $3.00 | $4.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 612 FT | $10.00 | $9.50 | $3.25 | $5.00 | $5.00 | $6.00 | $10.00 | $15.00 | $10.00 | $6.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (12", 15" | 243 FT | $20.00 | $22.75 | $23.00 | $18.00 | $30.00 | $27.00 | $32.00 | $40.00 | $25.00 | $16.22 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 42 FT | $20.00 | $49.00 | $53.00 | $40.00 | $60.00 | $88.00 | $22.00 | $93.00 | $50.00 | $72.18 |
| 203E20000 EMBANKMENT | 203 CY | $25.00 | $29.00 | $28.00 | $12.00 | $10.00 | $14.00 | $6.00 | $28.00 | $12.00 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 782 SY | $5.00 | $1.75 | $1.00 | $4.00 | $1.00 | $2.00 | $1.00 | $5.00 | $4.00 | $1.50 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 73 FT | $35.00 | $50.75 | $41.00 | $56.00 | $40.00 | $41.00 | $38.00 | $47.00 | $50.00 | $65.25 |
| 609E26000 CURB, TYPE 6 | 74 FT | $20.00 | $42.50 | $29.00 | $50.00 | $33.00 | $41.00 | $35.00 | $40.00 | $40.00 | $65.25 |
| 609E54001 6" CONCRETE TRAFFIC ISLAND, AS PER PLAN, TOOLED AN | 63 SY | $100 | $132 | $138 | $293 | $115 | $137 | $166 | $87.00 | $155 | $14.00 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 5 EACH | $1,000 | $78.00 | $230 | $450 | $500 | $496 | $405 | $470 | $350 | $655 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 18 EACH | $200 | $185 | $155 | $200 | $300 | $188 | $100 | $400 | $200 | $296 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 9 CY | $120 | $170 | $265 | $175 | $150 | $155 | $275 | $210 | $200 | $135 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 10 CY | $130 | $125 | $325 | $165 | $125 | $123 | $275 | $185 | $210 | $102 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $500 | $200 | $60.00 | $175 | $100 | $210 | $250 | $106 | $100 | $165 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 4,000 SY | $1.25 | $1.80 | $1.15 | $2.00 | $2.00 | $2.65 | $5.50 | $1.00 | $1.90 | $1.65 |
| 659E14000 REPAIR SEEDING AND MULCHING | 765 SY | $1.00 | $2.75 | $1.50 | $1.00 | $1.00 | $0.43 | $2.00 | $0.75 | $1.00 | $2.01 |
| 659E15000 INTER-SEEDING | 765 SY | $1.00 | $2.75 | $1.50 | $1.00 | $1.00 | $0.11 | $2.00 | $0.75 | $0.10 | $3.30 |
| 659E20000 COMMERCIAL FERTILIZER | 2.14 TON | $800 | $521 | $650 | $600 | $1,000 | $802 | $3,500 | $650 | $1,000 | $2,133 |
| 659E31000 LIME | 3.16 ACRE | $500 | $50.00 | $1,400 | $700 | $500 | $27.00 | $700 | $84.00 | $10.00 | $770 |
| 659E35000 WATER | 85 MGAL | $50.00 | $150 | $2.00 | $10.00 | $1.00 | $1.00 | $50.00 | $1.00 | $10.00 | $44.00 |
| 670E00700 DITCH EROSION PROTECTION | 2,383 SY | $3.00 | $1.25 | $3.25 | $3.00 | $2.50 | $2.00 | $3.00 | $2.00 | $2.50 | $1.76 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,615 | $1,820 | $2,300 | $2,000 | $3,360 | $1,800 | $1,600 | $2,000 | $2,205 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,500 | $6,220 | $6,565 | $1,200 | $3,000 | $7,088 | $6,800 | $6,400 | $3,000 | $6,286 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,000 | $10,370 | $9,971 | $8,500 | $10,000 | $10,469 | $9,375 | $10,500 | $6,000 | $550 |
| 836E10030 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 53 SY | $10.00 | $13.50 | $7.25 | $10.00 | $20.00 | $17.00 | $20.00 | $7.00 | $20.00 | $14.85 |
| 602E20000 CONCRETE MASONRY | 0.9 CY | $1,500 | $1,950 | $1,170 | $1,940 | $3,000 | $1,105 | $3,000 | $1,250 | $2,500 | $1,841 |
| 605E31100 AGGREGATE DRAINS | 34 FT | $20.00 | $19.00 | $50.00 | $30.00 | $8.00 | $9.00 | $30.00 | $24.00 | $15.00 | $4.81 |
| 611E02500 8" CONDUIT, TYPE E | 154 FT | $14.75 | $42.00 | $51.00 | $85.00 | $45.00 | $29.00 | $45.00 | $30.00 | $35.00 | $24.80 |
| 611E97300 CONDUIT, MISC.:STRUCTURAL SURVEY | 1 LS | $5,000 | $750 | $825 | $3,000 | $4,000 | $2,940 | $2,850 | $1,000 | $7,500 | $2,253 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $2,500 | $3,550 | $3,854 | $4,450 | $6,000 | $4,394 | $3,535 | $5,100 | $4,000 | $3,432 |
| 253E02000 PAVEMENT REPAIR | 100 CY | $90.00 | $375 | $228 | $250 | $400 | $680 | $450 | $466 | $595 | $690 |
| 304E20000 AGGREGATE BASE | 134 CY | $55.00 | $62.00 | $54.00 | $62.00 | $100 | $77.00 | $70.00 | $100 | $100 | $68.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 29 CY | $60.00 | $70.00 | $66.00 | $85.00 | $225 | $88.00 | $75.00 | $96.00 | $130 | $68.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $500 | $495 | $865 | $850 | $450 | $445 | $600 | $460 | $400 | $440 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1PP | 82 SY | $90.00 | $67.00 | $48.00 | $80.00 | $50.00 | $77.00 | $66.00 | $104 | $115 | $108 |
| 638E01201 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, PUS | 22 FT | $150 | $510 | $649 | $750 | $600 | $300 | $400 | $500 | $600 | $584 |
| 638E02731 12" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTING | 29 FT | $170 | $480 | $577 | $625 | $550 | $354 | $400 | $425 | $550 | $578 |
| 638E98000 WATER WORK, MISC.:WATER SERVICE EXCAVATION | 4 EACH | $2,500 | $1,250 | $295 | $1,300 | $1,000 | $1,454 | $1,000 | $2,600 | $1,200 | $1,000 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 60 FT | $2.50 | $7.00 | $14.00 | $12.00 | $7.25 | $13.00 | $12.00 | $8.00 | $12.00 | $7.54 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 84 FT | $3.50 | $7.25 | $15.00 | $14.00 | $7.25 | $14.00 | $15.00 | $8.00 | $12.85 | $7.65 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $100 | $75.00 | $32.00 | $55.00 | $75.00 | $51.00 | $40.00 | $76.00 | $28.00 | $78.76 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 17 EACH | $175 | $69.00 | $26.00 | $65.00 | $70.00 | $67.00 | $85.00 | $70.00 | $22.50 | $72.99 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 11 EACH | $175 | $45.50 | $24.00 | $20.00 | $45.00 | $32.00 | $60.00 | $46.00 | $20.75 | $48.07 |
| 644E00100 EDGE LINE, 4" | 0.06 MILE | $24,000 | $8,750 | $14,123 | $25,000 | $8,500 | $41,000 | $5,000 | $8,900 | $40,310 | $9,240 |
| 644E00300 CENTER LINE | 0.01 MILE | $28,000 | $16,250 | $26,270 | $45,000 | $15,700 | $42,500 | $35,000 | $17,000 | $41,870 | $17,188 |
| 644E00500 STOP LINE | 13 FT | $100 | $15.00 | $25.00 | $8.00 | $15.00 | $13.00 | $20.00 | $16.00 | $12.00 | $15.95 |
| 644E20800 YIELD LINE | 18 FT | $50.00 | $31.25 | $51.00 | $12.00 | $30.00 | $13.00 | $20.00 | $32.00 | $12.35 | $33.00 |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $500 | $3,025 | $1,941 | $2,000 | $1,000 | $730 | $1,500 | $3,000 | $1,500 | $1,788 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E19601 42" CONDUIT, TYPE C, AS PER PLAN | 3,224 FT | $136.5 | $440k | 36% |
| 611E10601 24" CONDUIT, TYPE C, AS PER PLAN, 706.02 | 1,036 FT | $100 | $104k | 8% |
| 832E30000 EROSION CONTROL | 90,000 EACH | $1 | $90k | 7% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $49,000 | $49k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $47,900 | $48k | 4% |
| 659E00300 TOPSOIL | 1,699 CY | $25 | $42k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $39,000 | $39k | 3% |
| 611E19401 42" CONDUIT, TYPE B, AS PER PLAN | 180 FT | $200 | $36k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $34,500 | $35k | 3% |
| 203E20001 EMBANKMENT, AS PER PLAN | 1,209 CY | $25 | $30k | 2% |