HOL-SR 520-11.80/12.91
HOL County · est $1.3M
Bid dateThursday, September 30—
HOL County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1Dennison Bridge INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Bog Construction INC | R5Great Lakes Construction CO | R6Wolf Creek Contracting Company LLC | R7Complete General Construction Company | R8Shelly & Sands INC | R9V O Menuez & Son INC | R10George J Igel & CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,030 FT | $45.00 | $41.00 | $46.00 | $45.00 | $55.00 | $51.75 | $46.00 | $50.00 | $52.90 | $50.00 |
| Item | Quantity | R1Dennison Bridge INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Bog Construction INC | R5Great Lakes Construction CO | R6Wolf Creek Contracting Company LLC | R7Complete General Construction Company | R8Shelly & Sands INC | R9V O Menuez & Son INC | R10George J Igel & CO INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $2,500 | $4,000 | $7,000 | $5,000 | $2,172 | $15,000 | $7,500 | $6,437 | $5,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 14% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 2,690 FT | $45.00 | $40.50 | $46.00 | $45.00 | $55.00 | $51.75 | $46.00 | $50.00 | $52.90 | $50.00 | 12% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,470 FT | $50.00 | $30.00 | $38.00 | $64.00 | $40.00 | $64.21 | $55.00 | $45.00 | $64.04 | $34.00 | 7% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,441 FT | $50.00 | $31.00 | $29.00 | $64.00 | $50.00 | $63.93 | $55.00 | $45.00 | $72.15 | $40.00 | 7% |
| 511E81300 CONCRETE, MISC.: 8" x 24" x 69" PRECAST CONCRETE L | 364 EACH | $180 | $235 | $205 | $230 | $200 | $197 | $230 | $250 | $271 | $200 | 7% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 940 FT | $65.00 | $66.00 | $52.00 | $61.00 | $80.00 | $64.18 | $70.00 | $85.00 | $110 | $80.00 | 6% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 806 FT | $65.00 | $63.50 | $57.00 | $60.00 | $100 | $63.97 | $70.00 | $65.00 | $97.45 | $62.50 | 5% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 727 SY | $65.00 | $85.00 | $60.00 | $95.00 | $100 | $66.63 | $52.00 | $75.00 | $61.85 | $40.00 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 168 CY | $280 | $230 | $250 | $290 | $209 | $261 | $275 | $375 | $220 | $250 | 5% |
| 511E81300 CONCRETE, MISC.: 8" x 24" x 57" PRECAST CONCRETE L | 267 EACH | $160 | $218 | $189 | $170 | $180 | $169 | $230 | $250 | $211 | $185 | 4% |
| 304E20000 AGGREGATE BASE | 418 CY | $100 | $62.00 | $78.50 | $93.00 | $50.00 | $58.52 | $95.00 | $70.00 | $75.30 | $70.00 | 4% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1,163 CY | $30.00 | $65.50 | $23.00 | $20.00 | $60.00 | $11.78 | $70.00 | $35.00 | $5.00 | $56.00 | 3% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 875 FT | $39.00 | $36.50 | $44.50 | $39.00 | $36.40 | $43.98 | $36.40 | $36.50 | $37.00 | $38.00 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 82 CY | $400 | $315 | $519 | $505 | $442 | $511 | $350 | $350 | $430 | $250 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 287 CY | $90.00 | $84.00 | $165 | $90.00 | $100 | $56.37 | $65.00 | $125 | $20.00 | $120 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $22,500 | $75,000 | $57,000 | $20,500 | $57,289 | $46,000 | $45,450 | $19,463 | $60,000 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $40,000 | $27,500 | $30,000 | $40,000 | $129,152 | $40,000 | $40,000 | $18,500 | $50,000 | 2% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 83 CY | $300 | $332 | $350 | $265 | $350 | $224 | $425 | $375 | $599 | $378 | 2% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 783 CY | $30.00 | $61.50 | $19.50 | $25.00 | $60.00 | $11.85 | $65.00 | $48.00 | $10.00 | $51.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 1,172 SY | $18.00 | $13.50 | $6.00 | $15.00 | $15.00 | $10.86 | $15.00 | $8.00 | $10.20 | $24.00 | 2% |
| 202E38000 GUARDRAIL REMOVED | 1,106 FT | $2.00 | $4.00 | $2.00 | $2.00 | $1.60 | $2.13 | $1.60 | $1.60 | $4.00 | $2.25 |
| 202E75000 FENCE REMOVED | 267 FT | $4.00 | $2.00 | $2.00 | $5.00 | $1.91 | $1.87 | $4.50 | $4.50 | $2.00 | $1.90 |
| 203E10000 EXCAVATION | 113 CY | $25.00 | $30.00 | $6.50 | $50.00 | $30.00 | $10.86 | $21.00 | $7.00 | $27.31 | $37.50 |
| 203E20000 EMBANKMENT | 499 CY | $30.00 | $20.00 | $6.00 | $20.00 | $10.00 | $29.77 | $32.00 | $15.00 | $27.31 | $42.00 |
| 204E10000 SUBGRADE COMPACTION | 1,332 SY | $2.00 | $5.00 | $2.00 | $3.00 | $4.00 | $1.35 | $3.50 | $4.00 | $1.90 | $4.75 |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 262.5 FT | $30.80 | $29.00 | $35.50 | $30.00 | $28.80 | $54.22 | $28.80 | $29.00 | $47.00 | $47.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 or MASH 201 | 1 EACH | $3,100 | $3,000 | $3,600 | $3,200 | $2,940 | $2,590 | $2,940 | $2,940 | $2,200 | $2,300 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $250 | $1,200 | $571 | $200 | $500 | $74.80 | $170 | $200 | $118 | $475 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $50.00 | $100 | $110 | $50.00 | $146 | $120 | $146 | $146 | $150 | $105 |
| 659E00300 TOPSOIL | 262 CY | $17.00 | $30.00 | $20.00 | $25.00 | $50.00 | $33.41 | $35.00 | $25.00 | $37.40 | $47.50 |
| 659E10000 SEEDING AND MULCHING | 2,367 SY | $2.50 | $2.65 | $1.50 | $3.00 | $0.83 | $3.17 | $0.84 | $0.85 | $1.00 | $2.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 119 SY | $2.50 | $2.00 | $2.00 | $1.00 | $0.68 | $3.17 | $0.69 | $0.70 | $0.70 | $2.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.34 TON | $1,000 | $700 | $673 | $1,000 | $628 | $843 | $629 | $630 | $700 | $725 |
| 659E31000 LIME | 0.49 ACRE | $500 | $82.00 | $862 | $100 | $150 | $96.39 | $151 | $150 | $170 | $84.00 |
| 659E35000 WATER | 13 MGAL | $1.00 | $1.00 | $122 | $0.50 | $1.00 | $1.21 | $13.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,500 | $1,800 | $5,500 | $2,000 | $904 | $1,450 | $1,500 | $1,740 | $1,525 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,000 | $5,500 | $5,100 | $4,500 | $1,000 | $217 | $4,100 | $4,500 | $5,712 | $5,750 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,000 | $4,000 | $6,000 | $6,200 | $5,000 | $6,024 | $5,800 | $6,165 | $7,606 | $8,000 |
| 832E30000 EROSION CONTROL | 9,853 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E05700 15" CONDUIT, TYPE A, 707.33 | 17 FT | $175 | $125 | $250 | $55.00 | $100 | $30.08 | $225 | $100 | $74.50 | $150 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 1,153 SY | $8.00 | $12.00 | $25.50 | $13.00 | $17.00 | $25.31 | $5.00 | $20.00 | $22.00 | $4.25 |
| 407E10000 TACK COAT | 229 GAL | $4.00 | $5.00 | $5.00 | $5.00 | $3.20 | $4.82 | $5.00 | $3.00 | $4.20 | $5.50 |
| 408E10001 PRIME COAT, AS PER PLAN | 261 GAL | $7.00 | $5.00 | $17.00 | $15.00 | $9.60 | $16.87 | $5.00 | $7.00 | $14.50 | $6.00 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (57 CY | $350 | $275 | $350 | $465 | $321 | $461 | $300 | $350 | $388 | $300 |
| 621E00100 RPM | 26 EACH | $160 | $155 | $184 | $150 | $130 | $181 | $153 | $130 | $162 | $160 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 26 EACH | $20.00 | $45.00 | $31.50 | $50.00 | $10.00 | $7.14 | $14.00 | $10.00 | $12.95 | $7.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 26 EACH | $10.00 | $10.00 | $9.50 | $10.00 | $7.90 | $11.45 | $7.90 | $8.00 | $10.00 | $9.75 |
| 646E10010 EDGE LINE, 6" | 0.37 MILE | $10,000 | $17,000 | $6,000 | $7,000 | $6,000 | $11,446 | $8,000 | $8,000 | $8,830 | $8,400 |
| 646E10200 CENTER LINE | 0.18 MILE | $20,000 | $18,000 | $17,000 | $15,000 | $12,000 | $22,289 | $8,000 | $8,000 | $17,783 | $8,400 |
| 614E11630 INCREASED BARRIER DELINEATION | 225 FT | $3.00 | $1.85 | $2.00 | $6.00 | $6.45 | $2.17 | $3.00 | $1.00 | $3.85 | $1.90 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $2,500 | $2,400 | $2,300 | $1,945 | $3,012 | $2,100 | $1,945 | $1,361 | $2,300 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $150 | $300 | $220 | $110 | $300 | $165 | $225 | $325 | $321 | $670 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 25 EACH | $15.00 | $30.00 | $36.50 | $10.00 | $7.25 | $36.15 | $17.50 | $10.00 | $16.50 | $10.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 25 EACH | $20.00 | $40.00 | $50.00 | $20.00 | $14.95 | $45.79 | $22.00 | $15.00 | $27.50 | $40.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.36 MILE | $10,000 | $12,600 | $15,000 | $10,000 | $21,325 | $15,175 | $11,900 | $12,595 | $16,500 | $13,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.32 MILE | $3,500 | $5,200 | $5,500 | $2,500 | $2,500 | $6,265 | $3,100 | $5,200 | $4,755 | $5,500 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.58 MILE | $8,000 | $9,100 | $10,500 | $7,500 | $8,485 | $10,904 | $8,700 | $9,050 | $8,800 | $9,500 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.62 MILE | $2,000 | $2,800 | $3,500 | $2,000 | $1,250 | $3,374 | $3,100 | $2,800 | $1,844 | $3,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 44 FT | $10.00 | $12.00 | $15.00 | $20.00 | $12.50 | $14.46 | $10.50 | $12.00 | $9.60 | $13.00 |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $15,000 | $1,500 | $19,000 | $5,000 | $10,000 | $5,921 | $20,000 | $40,000 | $20,000 | $50,000 |
| 616E10000 WATER | 10 MGAL | $10.00 | $1.00 | $0.10 | $1.00 | $50.00 | $12.05 | $60.00 | $15.00 | $10.00 | $40.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,130 FT | $12.00 | $22.50 | $25.00 | $20.00 | $25.00 | $25.79 | $22.00 | $20.00 | $39.00 | $28.00 |
| 511E81300 CONCRETE, MISC.: 8" x 24" x 69" PRECAST CONCRETE L | 1 EACH | $180 | $365 | $250 | $200 | $400 | $198 | $250 | $500 | $2,872 | $250 |
| 511E81300 CONCRETE, MISC.: CAST-IN-PLACE CONCETE LAGGING | 1 EACH | $2,500 | $2,800 | $3,000 | $2,200 | $2,500 | $1,616 | $3,500 | $3,500 | $2,830 | $5,250 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 558 FT | $8.00 | $9.50 | $7.00 | $7.00 | $6.00 | $2.85 | $8.00 | $4.00 | $10.00 | $6.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 21 FT | $15.00 | $35.00 | $16.00 | $7.00 | $35.00 | $3.24 | $18.00 | $20.00 | $10.00 | $24.00 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 3 EACH | $300 | $260 | $273 | $300 | $350 | $292 | $260 | $250 | $381 | $270 |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 45 CY | $300 | $335 | $372 | $265 | $350 | $218 | $500 | $375 | $563 | $378 |
| 511E81300 CONCRETE, MISC.: 8" x 24" x 57" PRECAST CONCRETE L | 1 EACH | $160 | $365 | $263 | $250 | $400 | $170 | $250 | $500 | $485 | $350 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 176 CY | $90.00 | $82.00 | $147 | $90.00 | $100 | $53.07 | $85.00 | $125 | $20.00 | $120 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 305 FT | $8.00 | $5.00 | $8.00 | $8.00 | $6.00 | $2.94 | $7.00 | $4.00 | $5.00 | $6.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 13 FT | $15.00 | $40.00 | $7.50 | $10.00 | $35.00 | $2.94 | $16.00 | $25.00 | $5.00 | $24.00 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 2 EACH | $300 | $250 | $300 | $300 | $350 | $292 | $260 | $250 | $381 | $265 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $14,000 | $8,000 | $20,000 | $23,000 | $14,582 | $11,000 | $8,900 | $13,575 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $500 | $900 | $500 | $500 | $2,000 | $2,234 | $3,500 | $2,500 | $2,070 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $7,000 | $13,000 | $4,000 | $10,000 | $14,458 | $11,000 | $15,000 | $8,900 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,030 FT | $45 | $136k | 11% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 2,690 FT | $45 | $121k | 10% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,470 FT | $50 | $74k | 6% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 1,441 FT | $50 | $72k | 6% |
| 511E81300 CONCRETE, MISC.: 8" x 24" x 69" PRECAST CONCRETE L | 364 EACH | $180 | $66k | 5% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 940 FT | $65 | $61k | 5% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 806 FT | $65 | $52k | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 727 SY | $65 | $47k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 168 CY | $280 | $47k | 4% |
| 511E81300 CONCRETE, MISC.: 8" x 24" x 57" PRECAST CONCRETE L | 267 EACH | $160 | $43k | 3% |