MAH-US 62/SR 7-13.16/11.26
MAH County · est $1.3M
Bid dateThursday, September 30—
MAH County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Kirila Contractors INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC | R5Shelly Company | % of bid |
|---|---|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 1,633 CY | $220 | $223 | $215 | $200 | $225 | 29% |
| 826E10500 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2450 CY | $140 | $168 | $170 | $150 | $175 | 28% |
| 608E52000 CURB RAMP | 4,284 SF | $17.83 | $18.00 | $15.00 | $15.42 | $18.00 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 2 1/2") |
| Item | Quantity | R1Shelly & Sands INC | R2Kirila Contractors INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC | R5Shelly Company |
|---|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 16 FT | $12.00 | $12.00 | $10.00 | $21.00 | $12.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 40 CY | $50.00 | $30.00 | $25.00 | $10.00 | $145 |
| 608E10000 4" CONCRETE WALK | 534 SF | $8.00 | $8.00 | $8.00 | $6.30 | $8.00 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $1,200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 58,781 SY |
| $1.20 |
| $2.30 |
| $1.82 |
| $2.50 |
| $1.75 |
| 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,500 SY | $45.00 | $26.75 | $40.00 | $35.00 | $30.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,990 | $81,530 | $90,000 | $175,000 | $155,000 | 5% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 30 EACH | $1,400 | $1,400 | $1,400 | $1,250 | $1,400 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $30,725 | $58,700 | $87,650 | $40,000 | 3% |
| 253E01000 PAVEMENT REPAIR | 200 SY | $180 | $100 | $100 | $150 | $165 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 7,643 GAL | $3.00 | $2.75 | $2.20 | $2.00 | $2.00 | 2% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 20 EACH | $1,100 | $11.00 | $1,100 | $750 | $1,100 | 2% |
| 202E30000 WALK REMOVED | 4,818 SF | $3.90 | $4.00 | $6.25 | $4.75 | $4.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $70.00 | $55.00 | $75.00 | $100 | $65.00 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 5 EACH | $2,500 | $2,500 | $2,500 | $1,500 | $2,500 | 1% |
| 646E10200 CENTER LINE | 2.38 MILE | $4,900 | $4,900 | $4,900 | $4,900 | $4,900 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $950 | $600 | $900 | $900 | $900 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $1,500 | $1,500 | $1,500 | $1,500 | 1% |
| 646E20300 LANE ARROW | 41 EACH | $200 | $200 | $200 | $200 | $200 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 5 EACH | $1,250 | $1,250 | $1,250 | $1,250 | $1,250 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 4.76 MILE | $1,200 | $1,200 | $1,200 | $1,200 | $1,200 | 0% |
| $1,200 |
| $1,200 |
| $750 |
| $1,200 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $1,250 | $1,250 | $1,250 | $1,250 | $1,250 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,200 FT | $0.50 | $3.00 | $3.00 | $4.00 | $4.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 40 CY | $50.00 | $75.00 | $50.00 | $50.00 | $60.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $25.00 | $1,100 | $1,100 | $750 | $1,100 |
| 646E10110 LANE LINE, 6" | 1.72 MILE | $2,800 | $2,800 | $2,800 | $2,800 | $2,800 |
| 646E10300 CHANNELIZING LINE, 8" | 1,370 FT | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 646E10400 STOP LINE | 175 FT | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 646E10500 CROSSWALK LINE | 289 FT | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 646E20504 DOTTED LINE, 6" | 50 FT | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $65.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $300 | $225 | $350 | $500 | $165 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 3.44 MILE | $525 | $525 | $525 | $525 | $525 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.72 MILE | $525 | $525 | $525 | $525 | $525 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 2.38 MILE | $1,200 | $1,200 | $1,200 | $1,200 | $1,200 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 2,570 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,285 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 350 FT | $3.65 | $3.65 | $3.65 | $3.65 | $3.65 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 175 FT | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $8,803 | $10,000 | $15,000 | $8,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $7,000 | $1,750 | $500 | $6,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 1,633 CY | $220 | $359k | 28% |
| 826E10500 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2450 CY | $140 | $343k | 27% |
| 608E52000 CURB RAMP | 4,284 SF | $17.83 | $76k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 2 1/2") | 58,781 SY | $1.2 | $71k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,500 SY | $45 | $68k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,990 | $56k | 4% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 30 EACH | $1,400 | $42k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 253E01000 PAVEMENT REPAIR | 200 SY | $180 | $36k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 7,643 GAL | $3 | $23k | 2% |