AUG-St. Marys US 33 Ped Bridge
AUG County · est $3.4M
Bid dateThursday, October 14—
AUG County · est $3.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 122 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Complete General Construction Company | R3Miller Bros Const INC | R4Eagle Bridge CO | R5Jutte Excavating INC | R6R B Jergens Contractors INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 530E00200 SPECIAL - STRUCTURES: PRE-ENGINEERED SUPERSTRUCTUR | 1 LS | $1,200,000 | $1,120,000 | $1,175,000 | $1,225,000 | $1,447,000 | $1,507,806 | 44% |
| AA2 514E80030 SHOP PAINTING AND FIELD TOUCH-UP OF STRUCTURAL STE | 1 LS | $450,000 | $350,792 | $315,000 | $565,000 | $350,792 | $363,769 | 17% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 3,990 FT | $35.00 | $32.00 |
| Item | Quantity | R1Brumbaugh Construction INC | R2Complete General Construction Company | R3Miller Bros Const INC | R4Eagle Bridge CO | R5Jutte Excavating INC | R6R B Jergens Contractors INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,000 | $8,000 | $72,000 | $7,500 | $11,800 | $17,420 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $300 | $500 | $250 | $150 | $250 | $524 |
| 202E23000 PAVEMENT REMOVED | 106 SY | $35.00 | $50.00 | $15.00 | $22.00 | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $45.00 |
| $50.00 |
| $34.00 |
| $37.66 |
| 5% |
| 511E45722 CLASS QC SCC CONCRETE WITH QC/QA, ABUTMENT | 208 CY | $550 | $700 | $750 | $950 | $950 | $977 | 4% |
| 607E98000 FENCE, MISC.: WOOD FENCE AS PER STD. DWG. RM-5.2 | 1,256 FT | $70.00 | $65.00 | $43.80 | $44.23 | $44.50 | $67.40 | 3% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 218 CY | $350 | $300 | $350 | $325 | $640 | $610 | 3% |
| 203E20000 EMBANKMENT | 7,120 CY | $10.00 | $12.00 | $21.00 | $14.00 | $15.00 | $11.64 | 3% |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) (70 MPH, | 2 EACH | $30,000 | $30,125 | $31,925 | $30,000 | $29,775 | $31,239 | 2% |
| 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN | 31 EACH | $1,800 | $2,400 | $2,035 | $1,650 | $1,750 | $1,837 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $55,000 | $90,000 | $50,000 | $35,000 | $61,024 | 2% |
| 622E10061 CONCRETE BARRIER, SINGLE SLOPE, TYPE B, AS PER PLA | 124 FT | $400 | $550 | $450 | $375 | $450 | $177 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 51,380 LB | $0.90 | $1.50 | $1.35 | $1.30 | $2.70 | $1.68 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,400 FT | $30.00 | $25.00 | $18.00 | $23.50 | $40.00 | $29.12 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $42,000 | $100,000 | $100,000 | $93,000 | $66,300 | $101,635 | 2% |
| 832E30000 EROSION CONTROL | 41,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN | 102 FT | $400 | $160 | $400 | $375 | $200 | $239 | 2% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 3,696 FT | $10.00 | $10.00 | $9.50 | $8.50 | $9.00 | $9.45 | 1% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 4 MILE | $9,000 | $8,630 | $8,500 | $5,000 | $8,500 | $9,075 | 1% |
| 659E00300 TOPSOIL | 1,287 CY | $26.00 | $15.00 | $7.00 | $5.00 | $13.00 | $30.08 | 1% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 31 EACH | $1,055 | $1,300 | $1,525 | $960 | $1,100 | $1,154 | 1% |
| $41.72 |
| 202E30000 WALK REMOVED | 290 SF | $2.00 | $10.00 | $3.00 | $2.50 | $3.00 | $1.27 |
| 202E32500 CURB AND GUTTER REMOVED | 206 FT | $4.00 | $10.00 | $4.25 | $7.50 | $3.00 | $2.85 |
| 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN | 99 FT | $15.00 | $50.00 | $6.50 | $7.50 | $5.00 | $28.36 |
| 202E75000 FENCE REMOVED | 280 FT | $5.00 | $15.00 | $2.00 | $4.00 | $4.00 | $6.45 |
| 203E10000 EXCAVATION | 781 CY | $10.00 | $15.00 | $21.00 | $25.00 | $15.00 | $11.92 |
| 204E10000 SUBGRADE COMPACTION | 2,646 SY | $1.00 | $4.00 | $0.75 | $3.00 | $1.50 | $3.98 |
| 204E13000 EXCAVATION OF SUBGRADE | 250 CY | $15.00 | $15.00 | $10.50 | $10.00 | $10.00 | $25.73 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 250 CY | $35.00 | $65.00 | $27.00 | $35.00 | $22.00 | $39.69 |
| 204E45000 PROOF ROLLING | 1 HOUR | $70.00 | $300 | $85.00 | $175 | $75.00 | $225 |
| 204E50000 GEOTEXTILE FABRIC | 700 SY | $2.50 | $5.00 | $1.10 | $1.50 | $2.00 | $4.62 |
| 607E15000 FENCE, TYPE 47 | 328 FT | $70.00 | $65.50 | $17.40 | $17.57 | $17.40 | $67.92 |
| 608E10000 4" CONCRETE WALK | 3,003 SF | $7.50 | $6.00 | $7.00 | $7.50 | $6.00 | $5.60 |
| 608E52000 CURB RAMP | 519 SF | $25.00 | $12.00 | $10.00 | $20.00 | $18.00 | $12.63 |
| 608E52001 CURB RAMP, AS PER PLAN | 260 SF | $25.00 | $15.00 | $10.00 | $20.00 | $18.00 | $10.19 |
| 622E24841 CONCRETE BARRIER END SECTION, TYPE B, AS PER PLAN | 2 EACH | $8,500 | $7,500 | $8,500 | $8,000 | $9,000 | $6,576 |
| 690E50610 SPECIAL - BOLLARD, HINGED | 2 EACH | $3,000 | $2,700 | $1,185 | $1,250 | $1,230 | $2,800 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 30 SY | $26.00 | $35.00 | $100 | $25.00 | $40.00 | $61.50 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 62 SY | $85.00 | $85.00 | $80.00 | $65.00 | $56.00 | $75.76 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 192 CY | $70.00 | $85.00 | $80.00 | $70.00 | $60.00 | $164 |
| 659E10000 SEEDING AND MULCHING | 5,844 SY | $1.50 | $0.80 | $0.80 | $1.50 | $1.35 | $0.83 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 5,739 SY | $2.00 | $1.45 | $1.45 | $1.50 | $3.00 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 579 SY | $2.00 | $0.80 | $0.80 | $1.50 | $1.35 | $0.83 |
| 659E15000 INTER-SEEDING | 579 SY | $2.00 | $0.40 | $0.40 | $1.50 | $1.35 | $0.41 |
| 659E20000 COMMERCIAL FERTILIZER | 1.62 TON | $700 | $600 | $1.62 | $1,250 | $400 | $622 |
| 659E31000 LIME | 2.39 ACRE | $5.00 | $35.00 | $35.00 | $10.00 | $100 | $36.29 |
| 659E35000 WATER | 65 MGAL | $5.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.04 |
| 670E00500 SLOPE EROSION PROTECTION | 2,063 SY | $2.00 | $1.80 | $1.80 | $2.50 | $3.00 | $1.87 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,375 | $1,500 | $1,500 | $1,300 | $1,555 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $13,000 | $4,760 | $6,000 | $12,500 | $10,000 | $15,555 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,500 | $11,000 | $11,000 | $5,500 | $11,000 | $15,555 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $3,800 | $5,000 | $5,750 | $2,500 | $1,500 | $3,473 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 757 FT | $12.00 | $15.00 | $11.00 | $9.00 | $10.00 | $9.38 |
| 605E31100 AGGREGATE DRAINS | 151 FT | $10.00 | $17.50 | $15.75 | $7.00 | $15.00 | $8.23 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 23 FT | $8.00 | $35.00 | $25.00 | $18.00 | $10.00 | $23.21 |
| 611E02400 8" CONDUIT, TYPE D-707.45 | 60 FT | $40.00 | $45.00 | $50.00 | $40.00 | $35.00 | $27.09 |
| 611E04900 12" CONDUIT, TYPE D-706.02 | 31 FT | $55.00 | $150 | $47.00 | $55.00 | $40.00 | $82.43 |
| 611E06400 15" CONDUIT, TYPE D | 40 FT | $60.00 | $125 | $26.00 | $35.00 | $50.00 | $66.83 |
| 611E07901 18" CONDUIT, TYPE D, AS PER PLAN-706.02 | 38 FT | $85.00 | $200 | $100 | $70.00 | $65.00 | $79.96 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $350 | $1,500 | $950 | $1,000 | $250 | $981 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $265 | $500 | $400 | $300 | $250 | $445 |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 35 SY | $100 | $100 | $190 | $150 | $150 | $159 |
| 304E20000 AGGREGATE BASE | 476 CY | $40.00 | $55.00 | $50.00 | $55.00 | $35.00 | $57.72 |
| 407E10000 TACK COAT | 103 GAL | $5.00 | $4.75 | $1.00 | $1.00 | $4.75 | $1.13 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 82 CY | $235 | $216 | $270 | $270 | $216 | $306 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (91 CY | $215 | $196 | $220 | $220 | $196 | $249 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $1,000 | $960 | $500 | $500 | $960 | $567 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 37 SY | $90.00 | $110 | $71.00 | $70.00 | $65.00 | $108 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 34 SY | $100 | $125 | $80.00 | $80.00 | $75.00 | $110 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 120 FT | $50.00 | $45.00 | $36.00 | $45.00 | $42.00 | $22.83 |
| 609E26000 CURB, TYPE 6 | 9 FT | $50.00 | $350 | $53.50 | $45.00 | $40.00 | $77.98 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $80.00 | $200 | $500 | $350 | $100 | $269 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $500 | $1,000 | $1,000 | $650 | $250 | $554 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $2,400 | $2,000 | $4,500 | $1,000 | $3,500 | $1,703 |
| 611E99900 DRAINAGE STRUCTURE, MISC.: LAMPHOLE ADJUSTED TO GR | 1 EACH | $700 | $1,000 | $1,000 | $325 | $200 | $950 |
| 625E00450 CONNECTION, FUSED PULL APART | 144 EACH | $95.00 | $120 | $90.00 | $85.00 | $85.00 | $89.20 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 1,596 FT | $3.00 | $4.25 | $3.00 | $2.60 | $3.00 | $3.15 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 3,276 FT | $0.60 | $1.50 | $1.85 | $0.50 | $0.50 | $0.52 |
| 625E25001 CONDUIT, 3/4", 725.04, AS PER PLAN | 394 FT | $14.00 | $50.00 | $15.00 | $30.00 | $15.00 | $15.74 |
| 625E27403 LUMINAIRE, POST TOP, SOLID STATE (LED), AS PER PLA | 31 EACH | $1,000 | $750 | $700 | $900 | $900 | $945 |
| 625E27600 LUMINAIRE, MISC.: PIER LIGHTING | 2 EACH | $850 | $1,200 | $1,250 | $780 | $780 | $819 |
| 625E27600 LUMINAIRE, MISC.: TRUSS LIGHTING | 13 EACH | $700 | $1,300 | $735 | $640 | $640 | $672 |
| 625E29002 TRENCH, 24" DEEP | 1,987 FT | $8.50 | $10.00 | $9.50 | $8.00 | $8.00 | $8.40 |
| 625E29901 JUNCTION BOX, AS PER PLAN | 1 EACH | $545 | $3,200 | $675 | $1,500 | $495 | $519 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $700 | $1,200 | $900 | $650 | $650 | $682 |
| 625E32000 GROUND ROD | 33 EACH | $175 | $250 | $265 | $160 | $160 | $168 |
| 625E33001 STRUCTURE GROUNDING SYSTEM, AS PER PLAN | 1 EACH | $9,300 | $8,300 | $8,335 | $8,500 | $9,800 | $10,285 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,900 | $7,000 | $3,100 | $3,500 | $4,000 | $4,198 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 1 EACH | $4,000 | $4,000 | $7,952 | $3,600 | $4,200 | $4,408 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,987 FT | $0.25 | $1.50 | $0.70 | $0.25 | $25.00 | $0.26 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 120 FT | $16.00 | $14.00 | $19.50 | $19.50 | $15.00 | $14.52 |
| 630E80100 SIGN, FLAT SHEET | 35 SF | $35.00 | $24.00 | $22.00 | $22.00 | $30.00 | $24.89 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 1 SF | $100 | $24.00 | $135 | $135 | $100 | $24.89 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 5 EACH | $15.00 | $50.00 | $15.00 | $15.00 | $15.00 | $51.85 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $85.00 | $95.00 | $70.00 | $70.00 | $75.00 | $98.51 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $30.00 | $15.00 | $15.00 | $15.00 | $31.11 |
| 630E87510 REMOVAL OF POLE MOUNTED SIGN AND STORAGE | 5 EACH | $30.00 | $40.00 | $45.00 | $45.00 | $25.00 | $41.48 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 1 EACH | $100 | $100 | $110 | $110 | $100 | $104 |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 2 EACH | $6,000 | $5,200 | $7,000 | $5,450 | $7,000 | $7,648 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $700 | $1,100 | $1,036 | $600 | $1,000 | $630 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 3 MILE | $760 | $690 | $1,500 | $1,560 | $1,500 | $1,602 |
| 642E00204 LANE LINE, 6", TYPE 1 | 1 MILE | $700 | $610 | $1,000 | $780 | $1,000 | $1,068 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 10 FT | $100 | $100 | $150 | $100 | $150 | $160 |
| 642E30020 REMOVAL OF PAVEMENT MARKING | 2 EACH | $100 | $100 | $500 | $600 | $500 | $534 |
| 644E00404 CHANNELIZING LINE, 12" | 1,200 FT | $2.00 | $1.70 | $3.00 | $1.74 | $3.00 | $3.20 |
| 644E00500 STOP LINE | 16 FT | $6.00 | $5.00 | $8.00 | $10.00 | $8.00 | $8.54 |
| 644E00600 CROSSWALK LINE | 303 FT | $6.00 | $5.30 | $6.00 | $4.00 | $6.00 | $6.41 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 200 FT | $6.00 | $5.10 | $6.00 | $9.54 | $6.00 | $6.41 |
| 644E01300 LANE ARROW | 2 EACH | $125 | $105 | $100 | $250 | $100 | $107 |
| 644E20800 YIELD LINE | 26 FT | $7.00 | $6.00 | $10.00 | $25.00 | $10.00 | $10.68 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $80.00 | $82.50 | $70.00 | $85.00 | $70.00 | $86.71 |
| 614E12381 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,400 | $2,100 | $1,980 | $1,980 | $2,040 | $2,644 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 32 EACH | $9.00 | $15.00 | $8.00 | $8.00 | $8.00 | $8.54 |
| 614E13350 OBJECT MARKER, ONE WAY | 32 EACH | $15.00 | $16.00 | $12.00 | $12.00 | $12.00 | $12.81 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $925 | $1,050 | $850 | $900 | $850 | $908 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 10,000 FT | $3.00 | $2.45 | $2.50 | $1.15 | $2.50 | $2.67 |
| 616E10000 WATER | 24 MGAL | $5.00 | $60.00 | $55.00 | $15.00 | $1.00 | $121 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,500 | $10,000 | $1.00 | $10,000 | $25,000 | $27,781 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $15,000 | $40,000 | $60,000 | $23,500 | $32,553 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $8,000 | $50,000 | $20,000 | $45,000 | $11,384 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 3,705 FT | $4.00 | $15.00 | $5.00 | $6.00 | $2.00 | $21.85 |
| 507E93300 STEEL POINTS OR SHOES | 57 EACH | $125 | $500 | $135 | $155 | $125 | $120 |
| 511E34445 CLASS QC2 CONCRETE, BRIDGE DECK, AS PER PLAN | 57 CY | $500 | $900 | $825 | $950 | $950 | $894 |
| 511E40512 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 44 CY | $650 | $1,000 | $850 | $850 | $950 | $983 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 115 SY | $25.00 | $12.50 | $12.00 | $12.50 | $22.00 | $13.49 |
| 512E75500 SPECIAL - SEALING: STAINING AND SEALING OF CONCRET | 268 SY | $60.00 | $50.00 | $45.00 | $50.00 | $90.00 | $53.95 |
| 516E12201 STRUCTURAL STEEL EXPANSION JOINT, AS PER PLAN | 30 FT | $650 | $139 | $150 | $650 | $150 | $131 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $2,800 | $350 | $3,000 | $3,000 | $2,000 | $3,185 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $4,000 | $350 | $3,000 | $4,250 | $3,000 | $3,185 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $11,000 | $8,000 | $12,000 | $15,000 | $7,000 | $7,628 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 104 FT | $12.00 | $15.00 | $10.00 | $12.00 | $15.00 | $9.74 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 14 FT | $14.00 | $20.00 | $40.00 | $15.00 | $15.00 | $13.61 |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 49 SY | $475 | $450 | $325 | $425 | $230 | $306 |
| 530E13000 SPECIAL - FORM LINER (DECORATIVE STONE FACING) | 1,731 SF | $18.00 | $30.00 | $20.00 | $35.00 | $22.00 | $20.37 |
| 530E13000 SPECIAL - FORM LINER (INDENTED LETTERING AND PICTO | 686 SF | $30.00 | $20.00 | $20.00 | $35.00 | $22.00 | $46.35 |
| 623E40900 MONUMENT, MISC.: RESETTING DISTURBED RIGHT-OF-WAY | 14 EACH | $150 | $500 | $100 | $400 | $500 | $928 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $32,000 | $20,000 | $40,000 | $14,000 | $17,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $5,000 | $3,500 | $3,000 | $5,500 | $2,500 | $2,644 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $800 | $2,500 | $1,500 | $2,000 | $2,000 | $1,586 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $5,000 | $21,000 | $20,000 | $10,000 | $15,669 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 530E00200 SPECIAL - STRUCTURES: PRE-ENGINEERED SUPERSTRUCTUR | 1 LS | $1,200,000 | $1.20M | 34% |
| AA2 514E80030 SHOP PAINTING AND FIELD TOUCH-UP OF STRUCTURAL STE | 1 LS | $450,000 | $450k | 13% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 3,990 FT | $35 | $140k | 4% |
| 511E45722 CLASS QC SCC CONCRETE WITH QC/QA, ABUTMENT | 208 CY | $550 | $114k | 3% |
| 607E98000 FENCE, MISC.: WOOD FENCE AS PER STD. DWG. RM-5.2 | 1,256 FT | $70 | $88k | 2% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 218 CY | $350 | $76k | 2% |
| 203E20000 EMBANKMENT | 7,120 CY | $10 | $71k | 2% |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) (70 MPH, | 2 EACH | $30,000 | $60k | 2% |
| 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN | 31 EACH | $1,800 | $56k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $50k | 1% |