WAS-IR 77-03.45
WAS County · est $1.9M
Bid dateThursday, October 28—
WAS County · est $1.9M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 114 more items below.
| Item | Quantity | R1Trucco Construction CO INC | R2Shelly & Sands INC | R3Wolf Creek Contracting Company LLC | R4Eclipse CO LLC | R5Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,225 CY | $168 | $168 | $191 | $171 | $168 | 17% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 674 CY | $210 | $210 | $238 | $215 | $210 | 12% |
| 203E10000 EXCAVATION | 13,780 CY | $7.75 | $12.00 | $18.15 | $14.50 | $20.00 |
| Item | Quantity | R1Trucco Construction CO INC | R2Shelly & Sands INC | R3Wolf Creek Contracting Company LLC | R4Eclipse CO LLC | R5Complete General Construction Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $19,800 | $20,001 | $5,381 | $32,000 | $40,000 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $650 | $200 | $358 | $230 | $225 |
| 202E30000 WALK REMOVED | 2,851 SF | $0.50 | $0.50 | $3.20 | $1.50 | $3.00 |
| 202E32000 CURB REMOVED | 2,307 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 304E20000 AGGREGATE BASE | 933 CY | $113 | $95.00 | $78.81 | $69.25 | $52.00 | 9% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 393 CY | $210 | $210 | $238 | $215 | $210 | 7% |
| 601E45050 BIORETENTION CELL | 536 CY | $120 | $90.00 | $39.38 | $95.75 | $110 | 5% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 6,015 FT | $10.11 | $9.30 | $10.56 | $10.50 | $10.00 | 5% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 600 CY | $95.00 | $70.00 | $40.99 | $71.75 | $55.00 | 5% |
| 609E26000 CURB, TYPE 6 | 3,173 FT | $16.00 | $17.50 | $35.96 | $30.25 | $21.00 | 4% |
| 611E98150 CATCH BASIN, NO. 3 | 8 EACH | $5,700 | $3,500 | $2,172 | $5,174 | $4,500 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | $121,813 | $104,176 | $100,000 | 3% |
| 659E00300 TOPSOIL | 1,017 CY | $39.00 | $50.00 | $25.59 | $34.25 | $40.00 | 3% |
| 625E25740 CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 80, JACKE | 442 FT | $80.02 | $55.00 | $62.43 | $84.00 | $65.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 4,030 SY | $8.00 | $7.00 | $15.32 | $14.50 | $11.00 | 3% |
| 832E30000 EROSION CONTROL | 27,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 611E10400 24" CONDUIT, TYPE B | 227 FT | $118 | $164 | $31.72 | $100 | $145 | 2% |
| 611E99574 MANHOLE, NO. 3 | 7 EACH | $3,800 | $3,450 | $2,655 | $5,610 | $3,500 | 2% |
| 611E05900 15" CONDUIT, TYPE B | 303 FT | $87.50 | $115 | $15.69 | $77.00 | $112 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 339 FT | $75.00 | $75.00 | $11.75 | $69.00 | $109 | 2% |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS, 707.31 | 1,344 FT | $18.50 | $16.00 | $3.85 | $14.50 | $14.00 | 2% |
| $3.50 |
| $1.00 |
| $3.64 |
| $3.25 |
| $5.00 |
| 202E32700 GUTTER REMOVED | 632 SY | $5.00 | $4.00 | $5.73 | $8.00 | $25.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 478 FT | $48.50 | $30.00 | $5.73 | $22.50 | $24.00 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $700 | $300 | $716 | $405 | $705 |
| 202E58100 CATCH BASIN REMOVED | 6 EACH | $475 | $180 | $358 | $450 | $350 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 12" | 70 FT | $19.50 | $40.00 | $14.26 | $37.00 | $40.00 |
| 202E98000 REMOVAL MISC.: HARDSCAPE ITEMS | 1 LS | $3,000 | $3,000 | $3,440 | $7,000 | $15,000 |
| 203E10001 EXCAVATION, AS PER PLAN | 504 CY | $15.00 | $23.00 | $17.64 | $19.00 | $28.00 |
| 203E20000 EMBANKMENT | 875 CY | $16.00 | $9.00 | $26.47 | $7.75 | $12.00 |
| 204E10000 SUBGRADE COMPACTION | 6,029 SY | $3.50 | $3.50 | $1.42 | $2.50 | $2.10 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,200 CY | $15.00 | $18.00 | $11.61 | $17.75 | $28.00 |
| 204E20000 EMBANKMENT | 600 CY | $16.00 | $10.00 | $26.47 | $17.75 | $20.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $300 | $200 | $265 | $275 | $300 |
| 607E98000 FENCE, MISC.: WOODEN SLAT FENCE | 48 FT | $150 | $150 | $170 | $158 | $153 |
| 608E10000 4" CONCRETE WALK | 3,230 SF | $7.25 | $5.50 | $9.72 | $8.50 | $7.00 |
| 608E52000 CURB RAMP | 969 SF | $20.00 | $13.50 | $12.34 | $24.00 | $12.00 |
| 659E10000 SEEDING AND MULCHING | 13,369 SY | $0.75 | $0.75 | $0.85 | $0.75 | $0.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 668 SY | $0.75 | $0.75 | $0.85 | $0.75 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 1.2 TON | $800 | $800 | $908 | $263 | $800 |
| 659E31000 LIME | 2.76 ACRE | $100 | $100 | $114 | $26.25 | $100 |
| 659E35000 WATER | 14 MGAL | $1.00 | $1.00 | $1.14 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 421 SY | $2.00 | $2.00 | $2.27 | $1.50 | $2.00 |
| 671E15010 EROSION CONTROL MAT, TYPE B | 700 SY | $2.00 | $2.00 | $2.27 | $1.75 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,300 | $1,424 | $3,780 | $1,255 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,100 | $5,000 | $5,108 | $9,450 | $8,160 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,815 | $11,000 | $1,424 | $11,356 | $11,700 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 75 SY | $6.00 | $6.00 | $4.35 | $4.25 | $6.00 |
| 602E20000 CONCRETE MASONRY | 1.8 CY | $2,700 | $2,500 | $1,698 | $1,824 | $700 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS, 707.41 | 169 FT | $12.00 | $4.00 | $4.31 | $7.50 | $20.00 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS, 707.31 | 262 FT | $23.50 | $16.50 | $3.91 | $16.00 | $26.00 |
| 611E00100 4" CONDUIT, TYPE B | 163 FT | $40.50 | $20.00 | $5.81 | $49.25 | $35.00 |
| 611E00406 4" CONDUIT, TYPE F, 707.41 | 58 FT | $18.00 | $15.00 | $7.21 | $10.00 | $19.00 |
| 611E00900 6" CONDUIT, TYPE B | 238 FT | $46.50 | $22.00 | $6.94 | $32.00 | $45.00 |
| 611E04600 12" CONDUIT, TYPE C | 244 FT | $52.50 | $75.00 | $12.29 | $66.50 | $72.00 |
| 611E07400 18" CONDUIT, TYPE B | 167 FT | $113 | $110 | $21.11 | $83.50 | $125 |
| 611E07600 18" CONDUIT, TYPE C | 239 FT | $85.00 | $100 | $19.89 | $77.50 | $90.00 |
| 611E10600 24" CONDUIT, TYPE C | 194 FT | $90.00 | $118 | $31.01 | $93.00 | $111 |
| 611E13600 30" CONDUIT, TYPE C | 20 FT | $110 | $140 | $44.18 | $146 | $148 |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $4,500 | $3,000 | $1,713 | $4,481 | $3,500 |
| 611E98230 CATCH BASIN, NO. 4 | 3 EACH | $6,500 | $5,500 | $3,040 | $7,022 | $4,100 |
| 611E98300 CATCH BASIN, NO. 5 | 2 EACH | $6,000 | $5,200 | $2,473 | $6,773 | $4,700 |
| 611E98410 CATCH BASIN, NO. 8 | 3 EACH | $5,500 | $5,500 | $2,585 | $6,798 | $4,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $350 | $450 | $409 | $437 | $250 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 45 CY | $205 | $100 | $211 | $122 | $190 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 11,059 SY | $1.90 | $1.90 | $2.16 | $2.00 | $1.90 |
| 407E20000 NON-TRACKING TACK COAT | 2,060 GAL | $4.00 | $4.00 | $4.54 | $4.10 | $4.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 171 SY | $105 | $110 | $124 | $110 | $90.00 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 3 EACH | $843 | $1,800 | $1,740 | $1,731 | $1,000 |
| 625E00450 CONNECTION, FUSED PULL APART | 26 EACH | $73.57 | $90.00 | $102 | $77.25 | $110 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 30 EACH | $85.18 | $90.00 | $102 | $89.50 | $125 |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT15B35 | 6 EACH | $2,347 | $3,100 | $3,519 | $2,464 | $2,700 |
| 625E10494 LIGHT POLE, LOW MAST, DESIGN ATLM50 | 7 EACH | $3,277 | $3,100 | $3,519 | $3,441 | $3,000 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 6 EACH | $1,457 | $1,000 | $2,100 | $1,530 | $1,000 |
| 625E14200 LIGHT POLE FOUNDATION, 24" X 10' DEEP | 7 EACH | $1,476 | $2,300 | $2,611 | $1,550 | $1,500 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 144 FT | $3.36 | $3.20 | $3.63 | $3.50 | $4.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,145 FT | $1.35 | $2.20 | $2.50 | $1.50 | $1.75 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3" | 43 FT | $66.15 | $55.00 | $62.43 | $69.50 | $50.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 6 EACH | $479 | $550 | $624 | $503 | $610 |
| 625E26273 LUMINAIRE, LOW MAST, SOLID STATE (LED), AS PER PLA | 3 EACH | $1,405 | $1,100 | $1,249 | $1,476 | $1,240 |
| 625E26273 LUMINAIRE, LOW MAST, SOLID STATE (LED), AS PER PLA | 4 EACH | $1,405 | $1,100 | $1,249 | $1,476 | $1,240 |
| 625E29002 TRENCH, 24" DEEP | 4,872 FT | $4.80 | $9.00 | $10.22 | $5.00 | $8.50 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $1,200 | $800 | $908 | $1,260 | $1,150 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,315 | $1,050 | $1,192 | $1,381 | $1,375 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $789 | $144 | $163 | $829 | $225 |
| 625E32000 GROUND ROD | 13 EACH | $325 | $265 | $301 | $342 | $275 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 4,872 FT | $1.26 | $0.70 | $0.79 | $1.25 | $2.25 |
| 625E75350 LIGHT TOWER REMOVED | 3 EACH | $1,725 | $2,500 | $2,838 | $1,811 | $1,300 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 6 EACH | $733 | $400 | $454 | $770 | $378 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 6 EACH | $456 | $150 | $170 | $479 | $310 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 3 EACH | $517 | $300 | $341 | $543 | $950 |
| 620E31200 REMOVAL OF DELINEATOR | 1 EACH | $125 | $200 | $12.79 | $26.25 | $250 |
| 621E00100 RPM, YELLOW/RED | 10 EACH | $250 | $250 | $284 | $263 | $250 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 20 EACH | $50.00 | $12.00 | $12.78 | $20.00 | $20.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 209 FT | $12.00 | $12.00 | $13.62 | $12.50 | $12.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 67 FT | $15.00 | $15.00 | $17.03 | $15.75 | $14.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 37 FT | $25.00 | $25.00 | $28.38 | $26.25 | $42.00 |
| 630E08600 SIGN POST REFLECTOR | 7 EACH | $45.00 | $45.00 | $51.08 | $47.25 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $350 | $350 | $397 | $368 | $540 |
| 630E80100 SIGN, FLAT SHEET | 120.6 SF | $22.00 | $22.00 | $24.97 | $23.00 | $17.50 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 40 SF | $25.00 | $25.00 | $28.38 | $26.25 | $29.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 31 EACH | $20.00 | $20.00 | $19.67 | $21.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 35 EACH | $20.00 | $20.00 | $19.67 | $21.00 | $15.00 |
| 644E00104 EDGE LINE, 6" | 0.37 MILE | $6,950 | $6,950 | $7,888 | $7,298 | $6,950 |
| 644E00404 CHANNELIZING LINE, 12" | 64 FT | $2.55 | $2.55 | $2.89 | $2.75 | $2.55 |
| 644E00600 CROSSWALK LINE | 240 FT | $3.40 | $3.40 | $3.86 | $3.50 | $3.40 |
| 644E01200 PARKING LOT STALL MARKING | 4,370 FT | $2.08 | $2.10 | $2.36 | $2.25 | $2.08 |
| 644E01600 HANDICAP SYMBOL MARKING | 3 EACH | $110 | $110 | $125 | $116 | $110 |
| 625E02500 TRANSFORMER BASE, TYPE AT-A | 4 EACH | $336 | $450 | $511 | $353 | $475 |
| 625E02800 TRANSFORMER BASE, STEEL | 2 EACH | $589 | $750 | $851 | $618 | $725 |
| 625E10490 LIGHT POLE, CONVENTIONAL, 16' REST AREA POST-TOP T | 3 EACH | $1,841 | $1,900 | $2,157 | $1,933 | $1,700 |
| 625E10490 LIGHT POLE, CONVENTIONAL, 30' MONOARM TYPE WITHOUT | 3 EACH | $2,161 | $2,200 | $2,497 | $2,269 | $2,075 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 6 EACH | $1,516 | $1,700 | $1,930 | $1,592 | $1,000 |
| 625E25300 CONDUIT, 1-1/2", 725.04 (WITH PULL ROPE) | 15 FT | $25.78 | $16.00 | $18.16 | $27.00 | $27.00 |
| 625E25304 CONDUIT, 1-1/2", 725.051 (WITH PULL ROPE) | 589 FT | $9.25 | $9.50 | $10.78 | $9.75 | $10.00 |
| 625E25400 CONDUIT, 2", 725.04 (WITH PULL ROPE) | 15 FT | $37.51 | $28.00 | $31.78 | $39.50 | $30.00 |
| 625E25408 CONDUIT, 2", 725.051 (WITH PULL ROPE) | 570 FT | $10.19 | $11.00 | $12.49 | $10.75 | $11.00 |
| 625E25740 CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 40 (WITH | 270 FT | $34.61 | $23.50 | $26.67 | $36.25 | $35.00 |
| 625E25740 CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 80 (WITH | 190 FT | $44.46 | $30.00 | $34.05 | $46.75 | $50.00 |
| 625E29002 TRENCH, 24" DEEP | 1,189 FT | $5.26 | $9.00 | $10.22 | $5.50 | $8.50 |
| 625E29010 TRENCH, 30" DEEP | 365 FT | $5.25 | $12.00 | $13.62 | $5.50 | $9.50 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $1,200 | $800 | $908 | $1,260 | $1,150 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $1,315 | $1,050 | $1,192 | $1,381 | $1,375 |
| 625E30710 PULL BOX, 725.08, 32" | 4 EACH | $2,248 | $2,140 | $2,429 | $2,360 | $2,500 |
| 625E32000 GROUND ROD | 6 EACH | $325 | $265 | $301 | $342 | $275 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,524 FT | $1.26 | $0.70 | $0.79 | $1.25 | $2.25 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $1,800 | $800 | $4,759 | $4,116 | $3,000 |
| 616E10000 WATER | 33 MGAL | $75.00 | $30.00 | $6.27 | $42.75 | $150 |
| 690E98300 SPECIAL - TEMPORARY DRIVEWAY | 124 SY | $35.00 | $30.00 | $45.21 | $36.75 | $95.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,050 | $11,000 | $15,947 | $21,697 | $15,750 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,000 | $3,800 | $4,256 | $8,063 | $20,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $15,000 | $33,937 | $16,773 | $39,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,225 CY | $168 | $206k | 10% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 674 CY | $210 | $142k | 7% |
| 203E10000 EXCAVATION | 13,780 CY | $7.75 | $107k | 5% |
| 304E20000 AGGREGATE BASE | 933 CY | $113 | $105k | 5% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 393 CY | $210 | $83k | 4% |
| 601E45050 BIORETENTION CELL | 536 CY | $120 | $64k | 3% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 6,015 FT | $10.11 | $61k | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 600 CY | $95 | $57k | 3% |
| 609E26000 CURB, TYPE 6 | 3,173 FT | $16 | $51k | 3% |
| 611E98150 CATCH BASIN, NO. 3 | 8 EACH | $5,700 | $46k | 2% |