VAN-SR 49-05.24
VAN County · est $1.0M
Bid dateThursday, December 16—
VAN County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Miller Bros Const INC | R2Brumbaugh Construction INC | R3Eagle Bridge CO | R4R G Zachrich Construction INC | R5Complete General Construction Company | R6Vernon Nagel INC | R7R & I Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 513E10221 STRUCTURAL STEEL MEMBERS, LEVEL 1, AS PER PLAN | 111,058 LB | $2.00 | $2.31 | $2.10 | $2.16 | $2.25 | $2.58 | $3.00 | 27% |
| 511E21520 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 118 CY | $1,000 | $1,045 | $1,000 | $1,148 | $850 | $1,100 | $1,000 | 14% |
| Item | Quantity | R1Miller Bros Const INC | R2Brumbaugh Construction INC | R3Eagle Bridge CO | R4R G Zachrich Construction INC | R5Complete General Construction Company | R6Vernon Nagel INC | R7R & I Construction INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,750 | $500 | $1,000 | $2,000 | $1,000 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 749 SY | $9.00 | $5.00 | $10.00 | $8.50 | $10.00 | $12.00 | $10.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $58,000 |
| $32,500 |
| $37,500 |
| $76,250 |
| $40,000 |
| $45,000 |
| $55,000 |
| 7% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 178 SY | $300 | $350 | $290 | $255 | $235 | $300 | $250 | 6% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 36,784 LB | $1.35 | $1.50 | $1.30 | $1.30 | $1.30 | $1.25 | $1.50 | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 75 CY | $600 | $565 | $650 | $650 | $725 | $800 | $900 | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 179 FT | $245 | $255 | $245 | $245 | $270 | $252 | $252 | 5% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 720 FT | $54.00 | $36.00 | $55.00 | $35.00 | $35.00 | $48.00 | $50.00 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 149 CY | $225 | $225 | $225 | $225 | $228 | $225 | $225 | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $20,000 | $15,000 | $14,000 | $20,000 | $12,000 | $25,000 | $15,000 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | $40,000 | $40,000 | $40,000 | $38,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 56 CY | $300 | $300 | $300 | $300 | $290 | $300 | $300 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 31 CF | $533 | $550 | $533 | $586 | $533 | $535 | $425 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,000 | $10,350 | $22,500 | $30,000 | $50,000 | $18,000 | $25,000 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 178 CY | $80.00 | $105 | $60.00 | $90.00 | $75.00 | $100 | $80.00 | 2% |
| 304E20000 AGGREGATE BASE | 187 CY | $75.00 | $64.00 | $100 | $56.00 | $80.00 | $75.00 | $60.00 | 2% |
| 526E90010 TYPE A INSTALLATION | 74 FT | $175 | $205 | $155 | $102 | $200 | $125 | $150 | 2% |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,550 | $2,550 | $2,550 | $2,550 | $3,140 | $3,140 | $3,140 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $6,500 | $10,000 | $14,000 | $13,000 | $15,000 | $12,000 | 1% |
| 341 FT |
| $2.00 |
| $2.00 |
| $3.00 |
| $2.00 |
| $1.80 |
| $3.00 |
| $1.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 3 EACH | $300 | $1,000 | $250 | $265 | $265 | $265 | $100 |
| 203E10000 EXCAVATION | 18 CY | $20.00 | $20.00 | $50.00 | $14.00 | $20.00 | $20.00 | $20.00 |
| 203E20000 EMBANKMENT | 388 CY | $20.00 | $20.00 | $25.00 | $12.00 | $15.00 | $15.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 949 SY | $1.25 | $1.00 | $4.00 | $1.90 | $6.00 | $1.00 | $1.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 188 FT | $30.00 | $30.00 | $30.00 | $30.00 | $32.40 | $32.40 | $32.40 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,700 | $2,700 | $2,700 | $2,700 | $2,880 | $2,880 | $2,880 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,280 | $1,280 | $1,280 | $1,280 | $1,430 | $1,430 | $1,430 |
| 659E10000 SEEDING AND MULCHING | 675 SY | $4.50 | $3.50 | $4.00 | $4.75 | $4.65 | $3.95 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $600 | $800 | $1,500 | $275 | $323 | $275 | $500 |
| 659E35000 WATER | 4 MGAL | $10.00 | $5.00 | $20.00 | $1.00 | $1.18 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 68 FT | $16.00 | $15.00 | $8.00 | $12.00 | $13.00 | $17.17 | $10.00 |
| 407E10000 TACK COAT | 111 GAL | $1.00 | $1.00 | $1.00 | $1.00 | $4.50 | $1.00 | $1.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 4 EACH | $55.00 | $70.00 | $55.00 | $70.00 | $55.00 | $55.00 | $55.00 |
| 621E00100 RPM | 4 EACH | $685 | $635 | $675 | $745 | $675 | $685 | $350 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $8.00 | $30.00 | $10.00 | $10.00 | $50.00 | $35.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 12 EACH | $10.00 | $10.00 | $10.00 | $10.00 | $8.50 | $8.50 | $8.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $50.00 | $50.00 | $55.00 | $65.00 | $75.00 | $50.00 | $50.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $100 | $100 | $180 | $180 | $145 | $100 | $100 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.14 MILE | $5,250 | $5,250 | $5,250 | $5,250 | $11,000 | $5,250 | $5,250 |
| 642E00300 CENTER LINE, TYPE 1 | 0.07 MILE | $10,500 | $10,500 | $10,500 | $10,500 | $12,000 | $10,500 | $10,500 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $300 | $300 | $300 | $300 | $665 | $300 | $300 |
| 407E10000 TACK COAT | 20 GAL | $1.00 | $1.00 | $1.00 | $1.00 | $4.50 | $1.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $300 | $300 | $300 | $300 | $550 | $300 | $300 |
| 616E10000 WATER | 1 MGAL | $75.00 | $5.00 | $20.00 | $20.00 | $60.00 | $10.00 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $70.00 | $35.00 | $60.00 | $60.00 | $90.00 | $60.00 | $35.00 |
| 202E23500 WEARING COURSE REMOVED | 300 SY | $5.00 | $10.00 | $8.00 | $8.50 | $5.00 | $3.00 | $10.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1.00 | $1,000 | $18,000 | $2,000 | $25,000 | $2,000 | $1,000 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 640 FT | $2.00 | $5.00 | $5.00 | $2.00 | $15.00 | $4.00 | $5.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 117 SY | $30.00 | $23.00 | $32.00 | $26.00 | $32.00 | $40.00 | $25.00 |
| 513E20001 WELDED STUD SHEAR CONNECTORS, AS PER PLAN | 888 EACH | $5.00 | $5.00 | $6.00 | $6.50 | $5.25 | $5.00 | $4.80 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 68 SF | $5.50 | $5.00 | $5.00 | $7.00 | $15.00 | $10.00 | $3.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 68 SF | $6.50 | $7.00 | $8.00 | $9.00 | $15.50 | $10.00 | $4.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 58 SF | $7.50 | $8.50 | $12.00 | $10.00 | $11.50 | $12.00 | $5.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 101 FT | $30.00 | $32.00 | $40.00 | $35.00 | $42.00 | $40.00 | $30.00 |
| 516E43201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 8 EACH | $275 | $285 | $250 | $2,070 | $1,300 | $1,600 | $1,500 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $7,000 | $9,400 | $7,500 | $8,000 | $9,000 | $5,000 | $5,000 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 203 FT | $16.00 | $13.50 | $14.00 | $15.00 | $14.00 | $12.00 | $12.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 116 FT | $9.00 | $8.00 | $15.00 | $6.00 | $10.00 | $10.00 | $10.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 98 FT | $18.00 | $8.00 | $20.00 | $6.00 | $11.00 | $10.00 | $10.00 |
| 507E93300 STEEL POINTS OR SHOES | 16 EACH | $125 | $100 | $125 | $130 | $100 | $100 | $150 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,500 | $8,198 | $5,000 | $8,000 | $10,000 | $4,650 | $4,850 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $1,600 | $600 | $1,750 | $800 | $1,800 | $2,700 | $400 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,100 | $6,000 | $10,000 | $10,000 | $3,000 | $4,180 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10221 STRUCTURAL STEEL MEMBERS, LEVEL 1, AS PER PLAN | 111,058 LB | $2 | $222k | 24% |
| 511E21520 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 118 CY | $1,000 | $118k | 13% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $58,000 | $58k | 6% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 178 SY | $300 | $53k | 6% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 36,784 LB | $1.35 | $50k | 5% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 75 CY | $600 | $45k | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 179 FT | $245 | $44k | 5% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 720 FT | $54 | $39k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 149 CY | $225 | $34k | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $20,000 | $20k | 2% |