| Item | Quantity | R1Shelly Company | R2Ronyak Paving INC | R3Kokosing Construction Company INC | R4Barbicas Construction Company INC | R5Karvo Companies INC | R6Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1533 CY | $155 | $155 | $182 | $200 | $180 | $190 | 24% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,092 CY | $197 | $185 | $226 | $250 | $220 | $210 | 22% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $135,750 | $79,050 | $84,599 |
| Item | Quantity | R1Shelly Company | R2Ronyak Paving INC | R3Kokosing Construction Company INC | R4Barbicas Construction Company INC | R5Karvo Companies INC | R6Chagrin Valley Paving INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $5,500 | $3,500 | $1,500 | $250 | $100 |
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 25 EACH | $10.00 | $5.00 | $4.00 | $50.00 | $5.00 | $4.00 |
| 203E10000 EXCAVATION | 260 CY | $25.00 | $30.00 | $30.70 | $40.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40,000 |
| $95,000 |
| $195,000 |
| 14% |
| 253E02000 PAVEMENT REPAIR | 400 CY | $225 | $295 | $295 | $210 | $300 | $325 | 9% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,555 SY | $36.00 | $32.00 | $35.00 | $27.00 | $55.00 | $55.00 | 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 31,103 SY | $1.75 | $3.00 | $1.60 | $4.00 | $4.00 | $5.00 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $75,600 | $40,000 | $20,000 | $94,251 | $140,000 | 4% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 20,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 39 CY | $465 | $275 | $380 | $350 | $500 | $350 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 282 CY | $55.00 | $75.00 | $30.00 | $60.00 | $85.00 | $75.00 | 2% |
| 304E20000 AGGREGATE BASE | 260 CY | $50.00 | $45.00 | $55.00 | $50.00 | $32.00 | $75.00 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,000 | $1,500 | $2,200 | $750 | $2,000 | $1,500 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $930 | $930 | $930 | $930 | $930 | $930 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 4,376 GAL | $2.50 | $4.00 | $2.00 | $2.90 | $3.00 | $2.00 | 1% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 5,200 LB | $1.90 | $2.00 | $2.00 | $1.60 | $3.00 | $2.00 | 1% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $1,600 | $1,100 | $1,100 | $1,500 | $2,500 | $1,100 | 1% |
| 646E20300 LANE ARROW | 60 EACH | $150 | $165 | $150 | $150 | $150 | $165 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $2,200 | $1,150 | $1,150 | $1,200 | $1,250 | $1,150 | 1% |
| 646E10000 EDGE LINE, 4" | 2.58 MILE | $3,371 | $1,950 | $3,371 | $3,371 | $3,371 | $1,950 | 1% |
| 646E10010 EDGE LINE, 6" | 2.2 MILE | $3,944 | $2,450 | $3,944 | $3,944 | $3,944 | $2,450 | 1% |
| $15.00 |
| $25.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 18 STA | $300 | $385 | $675 | $200 | $850 | $675 |
| 209E60200 LINEAR GRADING | 141 STA | $45.00 | $25.00 | $100 | $25.00 | $80.00 | $50.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 141 STA | $55.00 | $25.00 | $20.00 | $60.00 | $17.00 | $50.00 |
| 690E98000 SPECIAL - VERTICAL CLEARANCE | 2 EACH | $640 | $1,500 | $875 | $1,000 | $640 | $1,280 |
| 690E98400 SPECIAL - PRECONSTRUCTION VIDEO | 1 LS | $800 | $2,000 | $774 | $500 | $1,250 | $950 |
| 659E10000 SEEDING AND MULCHING | 3,720 SY | $0.90 | $1.65 | $1.65 | $0.60 | $0.90 | $1.45 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $1,200 | $700 | $700 | $100 | $1,200 | $1,400 |
| 659E31000 LIME | 0.77 ACRE | $0.10 | $450 | $450 | $100 | $0.01 | $80.00 |
| 659E35000 WATER | 10 MGAL | $0.10 | $1.00 | $1.00 | $5.00 | $0.01 | $1.00 |
| 611E98644 CATCH BASIN GRATE, TYPE 3 | 4 EACH | $360 | $950 | $950 | $800 | $1,500 | $950 |
| 408E10001 PRIME COAT, AS PER PLAN | 1,232 GAL | $3.50 | $4.00 | $3.65 | $5.50 | $6.00 | $2.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 3 CY | $300 | $350 | $350 | $600 | $160 | $500 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,843 LB | $1.75 | $2.00 | $0.65 | $4.00 | $1.00 | $2.00 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $1,500 | $1,000 | $1,000 | $900 | $3,000 | $1,000 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 25 EACH | $15.00 | $15.00 | $22.00 | $15.00 | $24.00 | $22.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 270.2 FT | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $9.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28.2 FT | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 109.7 SF | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 | $16.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $35.00 |
| 646E10200 CENTER LINE | 1.46 MILE | $4,816 | $4,800 | $4,816 | $4,816 | $4,816 | $4,800 |
| 646E10300 CHANNELIZING LINE, 8" | 383 FT | $1.60 | $1.90 | $1.60 | $1.60 | $1.60 | $1.90 |
| 646E10400 STOP LINE | 194 FT | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 369 FT | $7.00 | $10.00 | $7.00 | $7.00 | $7.00 | $10.00 |
| 646E20504 DOTTED LINE, 6" | 810 FT | $2.00 | $3.50 | $2.00 | $2.00 | $2.00 | $3.50 |
| 646E20600 BIKE LANE SYMBOL MARKING | 50 EACH | $125 | $275 | $125 | $125 | $125 | $275 |
| 646E20650 SHARED LANE MARKING | 8 EACH | $155 | $295 | $155 | $155 | $155 | $295 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $85.00 | $67.50 | $80.00 | $303 | $125 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 2.7 MILE | $950 | $1,100 | $950 | $950 | $950 | $1,100 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.35 MILE | $950 | $1,100 | $950 | $950 | $950 | $1,100 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 5.4 MILE | $650 | $600 | $650 | $650 | $650 | $600 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 2.7 MILE | $650 | $600 | $650 | $650 | $650 | $600 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 800 FT | $0.50 | $0.95 | $0.50 | $0.50 | $0.50 | $0.95 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 400 FT | $0.50 | $0.95 | $0.50 | $0.50 | $0.50 | $0.95 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 180 FT | $3.85 | $3.00 | $3.85 | $3.85 | $3.85 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 90 FT | $3.85 | $3.00 | $3.85 | $3.85 | $3.85 | $3.00 |
| 616E10000 WATER | 50 MGAL | $10.00 | $10.00 | $1.00 | $40.04 | $0.01 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $10,374 | $4,500 | $9,000 | $20,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1533 CY | $155 | $238k | 22% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,092 CY | $197 | $215k | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $135,750 | $136k | 13% |
| 253E02000 PAVEMENT REPAIR | 400 CY | $225 | $90k | 8% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,555 SY | $36 | $56k | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 31,103 SY | $1.75 | $54k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 20,000 EACH | $1 | $20k | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 39 CY | $465 | $18k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 282 CY | $55 | $16k | 1% |