POR-SR 88-13.71
POR County · est $1.0M
Bid dateThursday, August 25—
POR County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Shelly Company | R3Chagrin Valley Paving INC | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,810 CY | $210 | $207 | $220 | $275 | 45% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $70.00 | $45.00 | $47.00 | $28.00 | 8% |
| 422E25000 EMULSION, CHIP SEAL @ 0.4 GAL/SY | 17,372 GAL | $3.40 | $3.50 | $3.00 | $3.50 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $57,475 | $107,000 | $79,000 | $80,000 | 7% |
| 422E11001 AGGREGATE, SINGLE CHIP SEAL, TYPE A, AS PER PLAN(I | 43,435 SY | $1.00 | $1.50 | $0.90 | $1.50 | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $1.45 | $1.75 | $2.70 |
| Item | Quantity | R1Ronyak Paving INC | R2Shelly Company | R3Chagrin Valley Paving INC | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 34 CY | $40.00 | $25.00 | $50.00 | $40.00 |
| 209E60200 LINEAR GRADING | 288 STA | $20.00 | $55.00 | $20.00 | $25.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 24 EACH | $25.00 | $32.50 | $32.50 | $32.50 |
| 659E20000 COMMERCIAL FERTILIZER | 1.08 TON | $650 | $916 | $916 | $250 |
| 659E31000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.75 |
| 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (T=1.5") | 21,718 SY | $1.25 | $1.75 | $2.70 | $1.75 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $27,000 | $20,000 | $50,000 | $80,000 | 3% |
| 253E01000 PAVEMENT REPAIR | 200 SY | $120 | $130 | $160 | $90.00 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 354 CY | $67.00 | $75.00 | $100 | $90.00 | 3% |
| 646E10010 EDGE LINE, 6" | 5.46 MILE | $3,676 | $3,750 | $3,750 | $3,750 | 2% |
| 407E20000 NON-TRACKING TACK COAT @ 0.09 GAL/SY | 3,910 GAL | $3.00 | $2.50 | $2.00 | $5.00 | 1% |
| 646E10200 CENTER LINE | 2.73 MILE | $4,150 | $6,000 | $6,000 | $6,000 | 1% |
| 621E00100 RPM | 182 EACH | $50.00 | $39.50 | $39.50 | $39.50 | 1% |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 5.46 MILE | $1,615 | $1,500 | $1,200 | $3,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 8,000 SY | $1.00 | $1.00 | $1.00 | $1.50 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN @ 0.40 GAL/SY | 2,548 GAL | $3.00 | $4.25 | $2.00 | $9.00 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $1,500 | $2,000 | $1,750 | $750 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,126 | $3,500 | $10,000 | $15,000 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 5.46 MILE | $1,175 | $1,500 | $1,500 | $1,500 | 1% |
| 1.65 ACRE |
| $650 |
| $154 |
| $154 |
| $50.00 |
| 659E35000 WATER | 43.2 MGAL | $10.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,200 FT | $1.15 | $3.00 | $2.00 | $4.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 34 CY | $40.00 | $50.00 | $100 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 145 EACH | $1.00 | $6.00 | $1.00 | $4.00 |
| 646E10400 STOP LINE | 14 FT | $16.00 | $15.00 | $15.00 | $15.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $85.00 | $75.00 | $100 | $80.00 |
| 614E12460 WORK ZONE MARKING SIGN | 20 EACH | $75.00 | $75.00 | $75.00 | $70.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $125 | $120 | $300 | $175 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $900 | $900 | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 2.73 MILE | $995 | $1,500 | $1,500 | $1,500 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.46 MILE | $650 | $750 | $750 | $750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,400 | $3,000 | $100 | $250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,810 CY | $210 | $380k | 43% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $70 | $70k | 8% |
| 422E25000 EMULSION, CHIP SEAL @ 0.4 GAL/SY | 17,372 GAL | $3.4 | $59k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $57,475 | $57k | 7% |
| 422E11001 AGGREGATE, SINGLE CHIP SEAL, TYPE A, AS PER PLAN(I | 43,435 SY | $1 | $43k | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $1.45 | $31k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (T=1.5") | 21,718 SY | $1.25 | $27k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $27,000 | $27k | 3% |
| 253E01000 PAVEMENT REPAIR | 200 SY | $120 | $24k | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 354 CY | $67 | $24k | 3% |