STA-SR 183-06.47
STA County · est $2.0M
Bid dateThursday, October 13—
STA County · est $2.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Shelly Company | R2Superior Paving & Materials INC | R3Chagrin Valley Paving INC | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (4875 CY | $222 | $235 | $250 | $320 | 55% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 174,227 SY | $1.05 | $1.80 | $3.00 | $2.00 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $150,000 | $130,000 | $125,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $100,000 | $93,300 | $150,000 | 4% |
| 646E10010 EDGE LINE, 6" | 19.46 MILE | $3,875 | $3,405 | $3,875 | $3,405 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,500 SY | $45.00 | $28.00 | $70.00 |
| Item | Quantity | R1Shelly Company | R2Superior Paving & Materials INC | R3Chagrin Valley Paving INC | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 340 SY | $1.00 | $20.00 | $10.00 | $29.00 |
| 202E30000 WALK REMOVED | 99 SF | $11.00 | $25.00 | $10.00 | $10.00 |
| 608E52000 CURB RAMP | 247 SF | $25.00 | $11.00 | $18.25 | $20.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 9 EACH | $725 | $950 | $1,500 | $1,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40.00 |
| 3% |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING (SAFETY EDG | 525 STA | $100 | $16.00 | $15.00 | $60.00 | 3% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 87,332 FT | $0.50 | $0.50 | $0.25 | $1.50 | 2% |
| 646E10200 CENTER LINE | 9.73 MILE | $4,450 | $3,776 | $4,450 | $3,776 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,296 CY | $30.00 | $54.00 | $75.00 | $60.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 15,185 GAL | $2.00 | $3.50 | $2.00 | $5.00 | 2% |
| 621E00100 RPM | 855 EACH | $32.00 | $32.00 | $31.60 | $36.00 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 9,322 GAL | $2.50 | $4.00 | $2.00 | $7.75 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 19.86 MILE | $800 | $690 | $800 | $690 | 1% |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 16.54 MILE | $785 | $785 | $785 | $1,500 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,000 | $1,950 | $1,500 | $750 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 9.73 MILE | $1,200 | $1,200 | $1,200 | $1,200 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 9.73 MILE | $1,200 | $1,100 | $1,200 | $1,100 | 1% |
| 209E60200 LINEAR GRADING | 809 STA | $10.00 | $22.00 | $10.00 | $15.00 | 0% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 8 SNMT | $1,000 | $1,200 | $1,000 | $2,000 | 0% |
| 22,473 SY |
| $0.20 |
| $1.00 |
| $0.90 |
| $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 3.03 TON | $200 | $500 | $1,400 | $1,000 |
| 659E31000 LIME | 4.64 ACRE | $25.00 | $75.00 | $80.00 | $20.00 |
| 659E35000 WATER | 121.35 MGAL | $0.10 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $950 | $2,000 | $2,500 | $600 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 100 LB | $2.00 | $5.00 | $5.00 | $4.50 |
| 609E26000 CURB, TYPE 6 | 30 FT | $28.00 | $70.00 | $200 | $40.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 685 EACH | $5.00 | $7.25 | $1.00 | $4.00 |
| 646E10400 STOP LINE | 131 FT | $20.00 | $12.00 | $20.00 | $12.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $75.00 | $80.00 | $100 | $80.00 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $55.00 | $60.00 | $55.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $80.00 | $200 | $250 | $200 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 54 FT | $5.00 | $3.25 | $5.00 | $3.20 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 54 FT | $5.00 | $3.25 | $5.00 | $3.10 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $28,500 | $20,000 | $40,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $6,500 | $3,000 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (4875 CY | $222 | $1.08M | 54% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 174,227 SY | $1.05 | $183k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $130k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $80k | 4% |
| 646E10010 EDGE LINE, 6" | 19.46 MILE | $3,875 | $75k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,500 SY | $45 | $68k | 3% |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING (SAFETY EDG | 525 STA | $100 | $53k | 3% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 87,332 FT | $0.5 | $44k | 2% |
| 646E10200 CENTER LINE | 9.73 MILE | $4,450 | $43k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,296 CY | $30 | $39k | 2% |