CLA-Geo Rogers Clark Pk Lower Br
CLA County · est $0.1M
Bid dateThursday, November 3—
CLA County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 12 more items below.
| Item | Quantity | R1Fillmore Construction | R2Eagle Bridge CO | R3Brumbaugh Construction INC | R4Complete General Construction Company | R5Righter Company INC | R6John R Jurgensen Company | R7Outdoor Enterprise LLC | R8Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E94980 10' X 4' CONDUIT, TYPE A, 706.05 | 36 FT | $2,000 | $1,350 | $1,290 | $1,600 | $2,590 | $1,793 | $2,000 | $1,963 | 40% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 28 CY | $600 | $750 | $650 | $900 | $2,000 | $1,247 |
| Item | Quantity | R1Fillmore Construction | R2Eagle Bridge CO | R3Brumbaugh Construction INC | R4Complete General Construction Company | R5Righter Company INC | R6John R Jurgensen Company | R7Outdoor Enterprise LLC | R8Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|---|
| 204E10000 SUBGRADE COMPACTION | 145 SY | $10.00 | $9.00 | $2.00 | $9.00 | $5.00 | $5.14 | $7.00 | $15.95 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 4 CY | $500 | $185 | $135 | $300 | $250 | $722 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $500 |
| $1,124 |
| 9% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 10 CY | $1,000 | $1,650 | $1,525 | $1,700 | $1,000 | $2,525 | $520 | $1,490 | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 2,906 LB | $3.00 | $2.10 | $1.25 | $2.00 | $3.00 | $2.54 | $5.00 | $2.91 | 5% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $7,500 | $15,000 | $19,750 | $9,000 | $4,000 | $5,094 | $20,000 | $10,283 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 9 CY | $800 | $970 | $665 | $400 | $400 | $942 | $700 | $400 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 13 CY | $500 | $590 | $630 | $300 | $300 | $692 | $700 | $300 | 4% |
| 512E33010 TYPE 3 WATERPROOFING | 55 SY | $100 | $45.00 | $54.00 | $52.00 | $36.89 | $52.00 | $55.00 | $52.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $3,500 | $4,000 | $7,500 | $4,000 | $5,646 | $8,000 | $8,650 | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $5,000 | $15,000 | $11,500 | $19,000 | $10,000 | $10,573 | $15,000 | $16,714 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $9,500 | $27,000 | $9,000 | $10,000 | $5,674 | $20,000 | $17,779 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $7,500 | $1,450 | $2,500 | $4,000 | $1,323 | $4,000 | $2,022 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $10,000 | $14,354 | $10,000 | $10,000 | $10,000 | $12,000 | $57,184 | 3% |
| 840E26050 AESTHETIC SURFACE TREATMENT | 240 SF | $15.00 | $20.00 | $25.00 | $25.00 | $15.00 | $11.54 | $42.00 | $23.61 | 2% |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $3,500 | $2,000 | $1,600 | $5,000 | $2,000 | $6,326 | $3,500 | $3,354 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $5,000 | $2,500 | $1,000 | $5,000 | $5,440 | $5,000 | $2,350 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 29 SY | $100 | $80.00 | $55.00 | $45.00 | $47.07 | $45.00 | $65.00 | $45.00 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 52 SY | $50.00 | $35.00 | $27.00 | $35.00 | $24.37 | $35.00 | $45.00 | $35.00 | 1% |
| 202E23000 PAVEMENT REMOVED | 25 SY | $100 | $35.00 | $30.00 | $90.00 | $35.00 | $35.78 | $150 | $53.30 | 1% |
| 203E10000 EXCAVATION | 25 CY | $100 | $40.00 | $50.00 | $45.00 | $100 | $53.67 | $150 | $64.43 | 1% |
| $250 |
| $551 |
| 659E10000 SEEDING AND MULCHING | 145 SY | $10.00 | $15.00 | $10.00 | $36.20 | $10.00 | $20.00 | $6.00 | $4.15 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $1,000 | $1,250 | $750 | $1,550 | $750 | $1,500 | $800 | $346 |
| 659E35000 WATER | 0.01 MGAL | $1,000 | $10.00 | $5.00 | $150 | $10.00 | $1.00 | $100 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 225 FT | $10.00 | $2.00 | $3.00 | $7.50 | $3.00 | $2.50 | $4.00 | $1.50 |
| 304E20000 AGGREGATE BASE | 20 CY | $100 | $150 | $87.00 | $195 | $150 | $398 | $130 | $218 |
| 407E20000 NON-TRACKING TACK COAT (0.085 GAL/SY) | 22 GAL | $10.00 | $33.00 | $25.00 | $5.00 | $5.00 | $76.57 | $30.00 | $5.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $2,000 | $2,250 | $1,975 | $5,000 | $1,000 | $6,228 | $3,100 | $1,842 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $20.00 | $7.00 | $13.00 | $10.00 | $10.00 | $11.30 | $36.00 | $6.55 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $3,750 | $2,900 | $5,000 | $1,500 | $12,295 | $5,000 | $1,984 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94980 10' X 4' CONDUIT, TYPE A, 706.05 | 36 FT | $2,000 | $72k | 37% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 28 CY | $600 | $17k | 9% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 10 CY | $1,000 | $10k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 2,906 LB | $3 | $9k | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $7,500 | $8k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 9 CY | $800 | $7k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 13 CY | $500 | $7k | 3% |
| 512E33010 TYPE 3 WATERPROOFING | 55 SY | $100 | $6k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5k | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $5,000 | $5k | 3% |