STA-SR 297/SR 627-00.66/00.37
STA County · est $1.3M
Bid dateThursday, November 17—
STA County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Superior Paving & Materials INC | R2Shelly Company | R3Chagrin Valley Paving INC | R4Karvo Companies INC | R5Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1959 CY | $220 | $245 | $200 | $240 | $275 | 44% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 70,371 SY | $1.50 | $1.65 | $3.00 | $1.75 | $3.65 | 11% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 9 EACH | $8,750 | $8,750 | $8,750 | $10,100 | $8,000 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $78,000 | $124,000 | $135,000 | $100,562 | $50,000 | 8% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 6 EACH | $9,050 | $9,050 | $9,050 | $10,600 | $8,000 | 6% |
| 624E10000 |
| Item | Quantity | R1Superior Paving & Materials INC | R2Shelly Company | R3Chagrin Valley Paving INC | R4Karvo Companies INC | R5Barbicas Construction Company INC |
|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 9 SY | $50.00 | $55.00 | $50.00 | $20.00 | $100 |
| 202E30000 WALK REMOVED | 40 SF | $6.25 | $15.00 | $30.00 | $12.00 | $10.00 |
| 209E60200 LINEAR GRADING | 228 STA | $22.00 | $25.00 | $20.00 | $40.00 | $30.00 |
| 608E10000 4" CONCRETE WALK | 20 SF | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $40,000 |
| $40,000 |
| $50,000 |
| $100,000 |
| $100,000 |
| 4% |
| 621E00100 RPM | 623 EACH | $36.50 | $36.50 | $35.00 | $35.00 | $36.50 | 2% |
| 407E20000 NON-TRACKING TACK COAT AT 0.08 GAL/SY | 5,630 GAL | $3.50 | $2.50 | $2.00 | $3.00 | $4.00 | 2% |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 4 EACH | $4,750 | $1,800 | $1,800 | $1,800 | $2,200 | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 800 SY | $22.00 | $65.00 | $70.00 | $60.00 | $30.00 | 2% |
| 646E10200 CENTER LINE | 3.71 MILE | $4,000 | $4,450 | $4,450 | $4,000 | $4,000 | 2% |
| 646E10010 EDGE LINE, 6" | 4.62 MILE | $3,000 | $3,620 | $3,620 | $3,000 | $3,000 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T=2") | 282 CY | $49.00 | $75.00 | $110 | $80.00 | $60.00 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 16 EACH | $800 | $1,500 | $1,400 | $1,200 | $1,000 | 1% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 17 EACH | $750 | $1,450 | $1,000 | $1,700 | $1,500 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN AT 0.40 GAL/SY | 3,483 GAL | $3.50 | $4.50 | $2.00 | $5.00 | $5.00 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,800 | $2,000 | $1,600 | $2,500 | $750 | 1% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $10,000 | $5,000 | $5,000 | $5,000 | $15,000 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $80.00 | $75.00 | $125 | $75.00 | $100 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $5,000 | $10,000 | $15,000 | $20,000 | 1% |
| $85.00 |
| $100 |
| $50.00 |
| $30.00 |
| 608E52000 CURB RAMP | 20 SF | $26.50 | $110 | $150 | $75.00 | $100 |
| 202E32000 CURB REMOVED | 155 FT | $12.00 | $10.00 | $20.00 | $16.00 | $20.00 |
| 203E10000 EXCAVATION | 2 CY | $150 | $45.00 | $200 | $40.00 | $40.00 |
| 203E20000 EMBANKMENT | 2 CY | $150 | $45.00 | $250 | $175 | $100 |
| 659E10000 SEEDING AND MULCHING | 12,678 SY | $0.20 | $1.00 | $0.70 | $1.00 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 1.7 TON | $400 | $1,200 | $898 | $1,200 | $200 |
| 659E31000 LIME | 2.61 ACRE | $75.00 | $0.10 | $157 | $0.50 | $100 |
| 659E35000 WATER | 68.4 MGAL | $1.00 | $0.10 | $1.00 | $0.01 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 4 EACH | $1,700 | $1,900 | $2,000 | $1,500 | $1,500 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 7 EACH | $1,000 | $1,700 | $1,300 | $1,650 | $1,800 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.75 | $2.65 | $3.00 | $0.50 | $3.00 |
| 609E26000 CURB, TYPE 6 | 155 FT | $38.20 | $45.00 | $70.00 | $35.00 | $100 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $700 | $1,300 | $1,000 | $1,625 | $2,000 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 505 EACH | $7.00 | $5.50 | $1.00 | $1.00 | $1.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $395 | $200 | $395 | $500 | $50.00 |
| 646E10110 LANE LINE, 6" | 0.59 MILE | $2,500 | $2,250 | $2,250 | $2,500 | $2,500 |
| 646E10300 CHANNELIZING LINE, 8" | 380 FT | $2.50 | $1.65 | $1.65 | $2.50 | $2.50 |
| 646E10310 CHANNELIZING LINE, 12" | 1,225 FT | $3.75 | $1.88 | $1.88 | $3.75 | $3.75 |
| 646E10400 STOP LINE | 292 FT | $15.00 | $12.00 | $12.00 | $15.00 | $15.00 |
| 646E10520 CROSSWALK LINE, 24" | 60 FT | $15.00 | $16.00 | $16.00 | $15.00 | $15.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 280 FT | $15.00 | $8.00 | $8.00 | $15.00 | $15.00 |
| 646E10800 ISLAND MARKING | 266.5 SF | $10.00 | $8.00 | $8.00 | $10.00 | $10.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 5 EACH | $650 | $625 | $625 | $650 | $1,000 |
| 646E20300 LANE ARROW | 35 EACH | $175 | $160 | $160 | $175 | $200 |
| 614E12460 WORK ZONE MARKING SIGN | 72 EACH | $75.00 | $75.00 | $75.00 | $75.00 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $200 | $115 | $300 | $300 | $150 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $450 | $900 | $1,000 | $600 | $1,000 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 0.59 MILE | $1,000 | $950 | $950 | $1,000 | $1,000 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.59 MILE | $1,000 | $940 | $940 | $1,000 | $1,000 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 3.71 MILE | $1,350 | $1,550 | $1,550 | $1,350 | $1,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.71 MILE | $1,350 | $1,275 | $1,275 | $1,350 | $1,500 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 4.62 MILE | $350 | $655 | $655 | $350 | $350 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 286 FT | $3.00 | $3.20 | $3.20 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 286 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I | 5 EACH | $200 | $275 | $275 | $200 | $200 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 5 EACH | $200 | $270 | $270 | $200 | $200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $5,000 | $3,680 | $2,750 | $250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1959 CY | $220 | $431k | 40% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 70,371 SY | $1.5 | $106k | 10% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 9 EACH | $8,750 | $79k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $78,000 | $78k | 7% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 6 EACH | $9,050 | $54k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 621E00100 RPM | 623 EACH | $36.5 | $23k | 2% |
| 407E20000 NON-TRACKING TACK COAT AT 0.08 GAL/SY | 5,630 GAL | $3.5 | $20k | 2% |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 4 EACH | $4,750 | $19k | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 800 SY | $22 | $18k | 2% |