LAK-Kirtland Road
LAK County · est $0.3M
Bid dateThursday, December 1—
LAK County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Barbicas Construction Company INC | R3Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 289 CY | $222 | $290 | $265 | 23% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (232 CY | $206 | $265 | $250 | 17% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $28,000 | $10,800 | $29,000 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $22,045 | $25,000 | $10,500 | 8% |
| 253E02000 PAVEMENT REPAIR | 45 CY | $475 | $225 | $450 | 8% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 250 SY | $75.00 | $30.00 | $70.00 | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, T | 8,247 SY |
| Item | Quantity | R1Ronyak Paving INC | R2Barbicas Construction Company INC | R3Chagrin Valley Paving INC |
|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 585 FT | $2.00 | $2.00 | $4.00 |
| 606E13001 GUARDRAIL, TYPE 5, AS PER PLAN | 87.5 FT | $20.40 | $20.40 | $28.00 |
| 606E20050 ROUNDED END SECTION | 1 EACH | $65.00 | $65.00 | $50.00 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 1 EACH | $1,520 | $1,520 | $1,200 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $940 | $940 | $1,200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2.00 |
| $4.00 |
| $4.00 |
| 6% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,830 | $2,830 | $2,350 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 425 FT | $19.20 | $19.20 | $28.00 | 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 3,212 FT | $2.20 | $2.20 | $2.20 | 3% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 5,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 646E10000 EDGE LINE, 4" | 1.22 MILE | $3,400 | $5,000 | $3,400 | 1% |
| 646E10200 CENTER LINE | 0.61 MILE | $6,500 | $10,000 | $6,500 | 1% |
| 606E32500 BRIDGE TERMINAL ASSEMBLY, TYPE F | 2 EACH | $1,945 | $1,945 | $2,200 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,583 | $8,000 | $3,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $200 | $500 | 1% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 5 CY | $665 | $290 | $500 | 1% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $1,100 | $430 | $1,000 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,244 GAL | $2.50 | $4.00 | $2.00 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.22 MILE | $1,800 | $1,200 | $1,800 | 1% |
| 623E38501 MONUMENT ASSEMBLY, TYPE C, AS PER PLAN | 1 EACH | $2,000 | $1,500 | $1,250 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 1 EACH | $1,550 | $880 | $1,000 |
| 616E10000 WATER | 5 MGAL | $25.00 | $10.00 | $100 |
| 616E20000 CALCIUM CHLORIDE | 2 TON | $20.00 | $100 | $200 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 500 LB | $3.00 | $2.30 | $3.00 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, T | 105 SY | $20.00 | $10.00 | $5.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 3 CY | $410 | $500 | $500 |
| 617E20001 SHOULDER PREPARATION, AS PER PLAN | 55 SY | $30.00 | $10.00 | $30.00 |
| 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $1,600 | $430 | $1,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.61 MILE | $1,800 | $2,500 | $1,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 289 CY | $222 | $64k | 21% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (232 CY | $206 | $48k | 16% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $28,000 | $28k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $22,045 | $22k | 7% |
| 253E02000 PAVEMENT REPAIR | 45 CY | $475 | $21k | 7% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 250 SY | $75 | $19k | 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, T | 8,247 SY | $2 | $16k | 6% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,830 | $11k | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 425 FT | $19.2 | $8k | 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 3,212 FT | $2.2 | $7k | 2% |