| Item | Quantity | R1Cole Burton Contractors, LLC | R2Ronyak Paving INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC | R5Kokosing Construction Company INC | R6Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,393 CY | $220 | $215 | $229 | $200 | $240 | $250 | 59% |
| 253E02000 PAVEMENT REPAIR | 745 CY | $215 | $213 | $245 | $300 | $280 | $250 | 13% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 82,452 SY | $0.75 | $1.25 |
| Item | Quantity | R1Cole Burton Contractors, LLC | R2Ronyak Paving INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC | R5Kokosing Construction Company INC | R6Barbicas Construction Company INC |
|---|---|---|---|---|---|---|---|
| 209E60501 LINEAR GRADING, AS PER PLAN | 7.33 MILE | $405 | $350 | $1,500 | $500 | $2,000 | $1,500 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 7.33 MILE | $405 | $500 | $2,450 | $1,000 | $150 | $1,500 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $950 | $1,350 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.35 |
| $3.00 |
| $1.10 |
| $3.00 |
| 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $42,000 | $32,000 | $80,000 | $125,000 | $141,251 | $100,000 | 3% |
| 646E10010 EDGE LINE, 6" | 9.35 MILE | $3,350 | $3,350 | $3,350 | $3,350 | $3,750 | $3,750 | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $28.00 | $38.00 | $49.00 | $50.00 | $80.00 | $35.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,911 GAL | $4.00 | $3.00 | $3.00 | $2.00 | $2.50 | $5.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 82 CY | $300 | $350 | $310 | $500 | $360 | $250 | 2% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $375 | $300 | $415 | $650 | $580 | $450 | 2% |
| 646E10200 CENTER LINE | 5.07 MILE | $3,745 | $3,745 | $3,745 | $3,745 | $4,250 | $4,250 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $9,767 | $10,000 | $15,000 | $8,000 | $35,000 | 1% |
| 621E00100 RPM | 341 EACH | $37.00 | $37.00 | $37.00 | $37.00 | $39.50 | $39.50 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,050 | $900 | $900 | $900 | $550 | $900 | 1% |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 300 SF | $40.00 | $17.50 | $17.50 | $17.50 | $17.50 | $17.50 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 5.07 MILE | $2,300 | $1,500 | $4,950 | $750 | $5,500 | $4,000 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $210 | $125 | $250 | $75.00 | $125 | $150 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,250 | $1,750 | $2,000 | $1,500 | $2,000 | $1,100 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 9.35 MILE | $750 | $750 | $750 | $750 | $650 | $750 | 1% |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 15 EACH | $450 | $975 | $750 | $1,000 | $640 | $750 | 1% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 5.07 MILE | $1,300 | $1,275 | $1,275 | $1,275 | $1,275 | $3,000 | 1% |
| $1,200 |
| $1,500 |
| $2,300 |
| $1,000 |
| 690E98400 SPECIAL -INVENTORY EXISTING PAVEMENT MAKRINGS | 1 LS | $650 | $650 | $750 | $650 | $750 | $750 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $1,100 | $1,400 | $900 | $1,500 | $1,100 | $1,000 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $1,500 | $1,750 | $1,500 | $2,000 | $2,500 | $1,800 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 500 LB | $2.15 | $4.00 | $3.00 | $3.00 | $4.25 | $3.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 47 CY | $90.00 | $100 | $248 | $250 | $260 | $150 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 258 EACH | $1.00 | $1.00 | $6.00 | $1.00 | $2.00 | $1.00 |
| 646E10300 CHANNELIZING LINE, 8" | 337 FT | $1.50 | $1.50 | $1.50 | $1.50 | $3.50 | $3.50 |
| 646E10400 STOP LINE | 150 FT | $12.00 | $12.00 | $12.00 | $12.00 | $15.00 | $15.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 360 FT | $9.00 | $9.00 | $9.00 | $9.00 | $15.00 | $15.00 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 1 EACH | $675 | $675 | $675 | $675 | $850 | $850 |
| 646E20300 LANE ARROW | 6 EACH | $159 | $159 | $159 | $159 | $250 | $250 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 3 EACH | $1,500 | $1,500 | $1,350 | $1,350 | $1,350 | $1,350 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $45.00 | $85.00 | $85.00 | $100 | $80.00 | $70.00 |
| 614E12461 WORK ZONE MARKING SIGN, AS PER PLAN | 12 EACH | $110 | $85.00 | $85.00 | $75.00 | $85.00 | $80.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 5.07 MILE | $1,190 | $1,190 | $1,190 | $1,190 | $1,350 | $1,350 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.07 MILE | $880 | $880 | $880 | $880 | $1,350 | $1,350 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 9.35 MILE | $675 | $675 | $675 | $675 | $750 | $750 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 337 FT | $0.60 | $0.60 | $0.60 | $0.60 | $0.75 | $0.75 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 337 FT | $0.55 | $0.55 | $0.55 | $0.55 | $0.75 | $0.75 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 150 FT | $3.20 | $3.20 | $3.20 | $3.50 | $3.75 | $3.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 150 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.75 | $3.75 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 6 EACH | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $40.00 | $40.00 | $40.00 | $40.00 | $50.00 | $50.00 |
| 614E31744 WORK ZONE SCHOOL SYMBOL MARKING, 96", CLASS I, 642 | 1 EACH | $100 | $100 | $100 | $100 | $250 | $250 |
| 614E31750 WORK ZONE SCHOOL SYMBOL MARKING, 96", CLASS III, 6 | 1 EACH | $90.00 | $90.00 | $90.00 | $90.00 | $250 | $250 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $3,650 | $1,000 | $3,000 | $3,000 | $500 | $7,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $8,985 | $8,910 | $2,500 | $15,000 | $300 |
| 624E10000 MOBILIZATION | 1 LS | $6,000 | $40,000 | $45,000 | $70,000 | $40,000 | $100,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,393 CY | $220 | $746k | 56% |
| 253E02000 PAVEMENT REPAIR | 745 CY | $215 | $160k | 12% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 82,452 SY | $0.75 | $62k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $42,000 | $42k | 3% |
| 646E10010 EDGE LINE, 6" | 9.35 MILE | $3,350 | $31k | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $28 | $28k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 6,911 GAL | $4 | $28k | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 82 CY | $300 | $25k | 2% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $375 | $19k | 1% |
| 646E10200 CENTER LINE | 5.07 MILE | $3,745 | $19k | 1% |