MOE-TR 1206-00.01
MOE County · est $0.3M
Bid dateThursday, April 18—
MOE County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2R C Construction Company And Son INC | R3Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 55 CY | $900 | $1,000 | $980 | 18% |
| 515E12010 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 3 EACH | $15,350 | $18,000 | $15,000 | 16% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 8,483 LB | $4.50 | $3.00 | $3.00 | 14% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 9 CY | $3,250 | $1,000 | $4,100 | 10% |
| 517E72204 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 64 FT | $195 | $140 | $160 | 4% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 59 FT | $205 | $375 | $310 | 4% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2R C Construction Company And Son INC | R3Alan Stone CO INC |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 11 CY | $115 | $25.00 | $90.00 |
| 204E10000 SUBGRADE COMPACTION | 79 SY | $12.00 | $2.00 | $8.50 |
| 606E13000 GUARDRAIL, TYPE 5 | 50 FT | $35.00 | $52.00 | $35.00 |
| 659E10000 SEEDING AND MULCHING | 86 SY | $40.00 | $75.00 | $20.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 5 SY | $40.00 | $0.20 | $110 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 30 FT |
| $360 |
| $300 |
| $270 |
| 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $15,000 | $14,000 | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 72 CY | $135 | $100 | $100 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 34 CY | $225 | $150 | $240 | 3% |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 4 EACH | $1,800 | $1,600 | $2,000 | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $7,000 | $15,000 | $15,000 | 2% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $6,500 | $35,000 | $64,000 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 48 SY | $125 | $50.00 | $60.00 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $6,000 | $25,000 | $7,600 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $18,000 | $5,700 | 2% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $1,200 | $1,000 | $1,200 | 2% |
| 304E20000 AGGREGATE BASE | 24 CY | $175 | $150 | $220 | 1% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $4,000 | $2,500 | $10,000 | 1% |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 5 SY |
| $40.00 |
| $0.20 |
| $110 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $1,500 | $2,200 | $880 |
| 659E31000 LIME | 0.02 ACRE | $200 | $1,200 | $1,000 |
| 659E35000 WATER | 1 MGAL | $1.00 | $1.00 | $130 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 46 FT | $40.00 | $40.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $130 | $100 | $30.00 |
| 630E84901 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, AS PE | 4 EACH | $300 | $225 | $80.00 |
| 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $300 | $250 | $50.00 |
| 616E10000 WATER | 1 MGAL | $10.00 | $1.00 | $1.50 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,000 | $15,000 | $42,000 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 19 SF | $20.00 | $25.00 | $20.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 31 FT | $40.00 | $100 | $70.00 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 6 EACH | $150 | $25.00 | $70.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 12 EACH | $200 | $250 | $140 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 60 FT | $25.00 | $40.00 | $40.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 58 FT | $12.00 | $25.00 | $30.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 20 FT | $12.00 | $25.00 | $35.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 11 CY | $50.00 | $150 | $360 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $15,000 | $9,400 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 55 CY | $900 | $50k | 16% |
| 515E12010 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 3 EACH | $15,350 | $46k | 15% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 8,483 LB | $4.5 | $38k | 12% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 9 CY | $3,250 | $29k | 9% |
| 517E72204 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 64 FT | $195 | $12k | 4% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 59 FT | $205 | $12k | 4% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 30 FT | $360 | $11k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 503E21100 UNCLASSIFIED EXCAVATION | 72 CY | $135 | $10k | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 34 CY | $225 | $8k | 2% |