GRE-CR 17-02.23
GRE County · est $1.3M
Bid dateThursday, February 1—
GRE County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 157 more items below.
| Item | Quantity | R1Double Z Construction Company | R2Complete General Construction Company | R3R B Jergens Contractors INC | R4Eagle Bridge CO | R5Sunesis Construction CO | R6John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 305E13010 9" CONCRETE BASE, CLASS QC1 | 2,601 SY | $60.00 | $60.00 | $57.30 | $67.00 | $77.40 | $60.75 | 18% |
| AA1 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 640 SY | $188 | $74.00 | $146 | $193 | $223 | $314 | 14% |
| 607E40000 SPECIAL - VANDAL PROTECTION FENCE | 292 FT | $195 | $318 |
| Item | Quantity | R1Double Z Construction Company | R2Complete General Construction Company | R3R B Jergens Contractors INC | R4Eagle Bridge CO | R5Sunesis Construction CO | R6John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $11,000 | $3,000 | $7,000 | $3,000 | $4,104 | $5,261 |
| 202E23000 PAVEMENT REMOVED | 2,597 SY | $6.00 | $10.00 | $16.90 | $12.00 | $7.67 | $7.93 |
| 202E30600 CONCRETE MEDIAN REMOVED | 12 SY | $38.00 | $36.00 | $12.30 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $206 |
| $195 |
| $195 |
| $287 |
| 7% |
| 608E10000 4" CONCRETE WALK | 7,259 SF | $7.00 | $4.00 | $4.30 | $4.98 | $5.34 | $6.09 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $30,000 | $34,565 | $44,000 | $57,979 | $56,026 | 6% |
| 809E69100 STOP-BAR RADAR DETECTION | 6 EACH | $8,250 | $6,000 | $9,011 | $8,269 | $6,728 | $6,608 | 6% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 218 CY | $196 | $226 | $214 | $226 | $225 | $250 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | $46,028 | $40,000 | 5% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 902 CY | $40.00 | $36.00 | $39.20 | $45.00 | $61.37 | $61.73 | 4% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $8,500 | $6,500 | $9,284 | $8,520 | $7,299 | $7,168 | 4% |
| 832E30000 EROSION CONTROL | 31,284 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 304E20000 AGGREGATE BASE | 521 CY | $57.00 | $50.00 | $44.10 | $56.00 | $78.77 | $66.35 | 3% |
| 511E34449 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET), AS PER | 33 CY | $800 | $900 | $807 | $1,000 | $826 | $1,170 | 3% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 97 CY | $260 | $320 | $436 | $400 | $510 | $563 | 3% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 125 CY | $196 | $251 | $214 | $251 | $250 | $359 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 991 FT | $20.00 | $32.00 | $19.50 | $20.28 | $21.27 | $25.73 | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 2,401 FT | $8.00 | $15.00 | $5.90 | $10.03 | $8.32 | $11.34 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $55,000 | $42,500 | $32,000 | $23,498 | $15,842 | 2% |
| 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 16 FT | $1,000 | $1,200 | $977 | $1,000 | $347 | $1,645 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 15,998 LB | $1.00 | $1.15 | $1.20 | $1.00 | $1.41 | $1.16 | 2% |
| $50.00 |
| $56.10 |
| $42.20 |
| 202E32000 CURB REMOVED | 112 FT | $5.00 | $7.50 | $6.25 | $8.00 | $6.21 | $17.60 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 32 FT | $5.00 | $24.00 | $13.20 | $10.00 | $7.11 | $21.49 |
| 202E38000 GUARDRAIL REMOVED | 1,275 FT | $2.50 | $2.00 | $2.65 | $2.51 | $2.50 | $2.30 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $500 | $460 | $555 | $175 | $396 | $1,875 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 200 FT | $8.00 | $13.00 | $10.70 | $25.00 | $16.05 | $15.81 |
| 203E10000 EXCAVATION | 661 CY | $22.00 | $28.00 | $13.80 | $22.00 | $17.68 | $15.81 |
| 203E20000 EMBANKMENT | 1,698 CY | $7.00 | $6.00 | $11.70 | $27.00 | $10.79 | $18.23 |
| 204E10000 SUBGRADE COMPACTION | 3,181 SY | $2.00 | $1.00 | $1.50 | $2.75 | $1.75 | $1.71 |
| 204E13000 EXCAVATION OF SUBGRADE | 902 CY | $8.00 | $14.00 | $21.50 | $15.00 | $19.75 | $28.74 |
| 204E45000 PROOF ROLLING | 2 HOUR | $100 | $90.00 | $248 | $150 | $250 | $201 |
| 204E50000 GEOTEXTILE FABRIC | 2,705 SY | $1.00 | $2.00 | $2.50 | $1.10 | $0.88 | $3.51 |
| 606E15050 GUARDRAIL, TYPE MGS | 937.5 FT | $17.00 | $17.00 | $18.00 | $17.04 | $17.00 | $15.75 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 100 FT | $17.50 | $18.00 | $18.50 | $17.54 | $17.50 | $17.75 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 100 FT | $24.50 | $25.00 | $25.90 | $24.56 | $24.50 | $21.75 |
| 606E15200 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 25 FT | $25.50 | $30.20 | $27.00 | $25.56 | $25.50 | $25.00 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 62.5 FT | $37.50 | $37.00 | $39.70 | $37.59 | $37.50 | $31.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,100 | $1,985 | $2,221 | $2,105 | $2,100 | $2,100 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $850 | $835 | $899 | $852 | $850 | $935 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $1,850 | $2,140 | $1,956 | $1,854 | $1,850 | $1,825 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $400 | $475 | $423 | $401 | $400 | $275 |
| 608E52000 CURB RAMP | 654 SF | $12.00 | $11.00 | $9.50 | $10.99 | $11.86 | $14.70 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $8,000 | $7,200 | $10,065 | $7,500 | $7,500 | $10,000 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 6 SY | $150 | $140 | $81.10 | $175 | $156 | $129 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 12 CY | $200 | $100 | $111 | $100 | $82.00 | $149 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $60.00 | $105 | $250 | $100 | $101 |
| 659E00300 TOPSOIL | 481 CY | $30.00 | $34.00 | $41.10 | $20.00 | $36.40 | $62.67 |
| 659E10000 SEEDING AND MULCHING | 4,329 SY | $1.05 | $1.12 | $1.10 | $2.00 | $2.08 | $1.05 |
| 659E14000 REPAIR SEEDING AND MULCHING | 216 SY | $1.00 | $1.12 | $1.05 | $1.00 | $1.45 | $1.00 |
| 659E15000 INTER-SEEDING | 216 SY | $1.00 | $0.60 | $1.05 | $1.00 | $0.30 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.97 TON | $605 | $600 | $635 | $850 | $700 | $605 |
| 659E31000 LIME | 0.89 ACRE | $75.00 | $30.00 | $78.70 | $50.00 | $60.00 | $75.00 |
| 659E35000 WATER | 25 MGAL | $1.00 | $1.00 | $1.05 | $25.00 | $10.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,000 | $3,000 | $13,965 | $3,200 | $1,900 | $5,850 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $6,200 | $15,745 | $15,000 | $27,600 | $13,475 |
| 602E20000 CONCRETE MASONRY | 1.26 CY | $2,500 | $2,100 | $2,867 | $2,200 | $3,615 | $3,200 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 1,240 FT | $8.00 | $14.00 | $8.50 | $12.00 | $10.39 | $20.28 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 69 FT | $8.00 | $20.00 | $9.15 | $13.50 | $11.57 | $32.61 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 275 FT | $8.00 | $12.00 | $11.10 | $18.89 | $34.14 | $37.24 |
| 611E04400 12" CONDUIT, TYPE B | 50 FT | $15.00 | $74.00 | $54.40 | $49.48 | $49.83 | $81.41 |
| 611E04600 12" CONDUIT, TYPE C | 81 FT | $40.00 | $64.00 | $48.40 | $47.85 | $44.50 | $91.81 |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21 | 141 FT | $50.00 | $70.00 | $67.10 | $69.14 | $58.18 | $151 |
| 611E98180 CATCH BASIN, NO. 3A | 6 EACH | $2,200 | $2,300 | $2,043 | $2,200 | $1,898 | $2,534 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $200 | $250 | $238 | $200 | $284 | $432 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 2,656 SY | $5.00 | $2.20 | $5.45 | $4.01 | $4.00 | $5.16 |
| 407E20000 NON-TRACKING TACK COAT | 585 GAL | $4.35 | $1.00 | $4.75 | $1.00 | $1.00 | $3.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 1,556 FT | $9.75 | $1.85 | $10.20 | $6.00 | $1.76 | $2.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 52 SY | $80.00 | $62.00 | $63.30 | $62.71 | $52.20 | $67.09 |
| 452E19250 NON-REINFORCED CONCRETE PAVEMENT, MISC.: CONCRETE | 224 SF | $9.00 | $10.00 | $6.80 | $18.36 | $6.75 | $6.75 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 50 FT | $45.00 | $37.00 | $28.40 | $31.80 | $33.43 | $37.23 |
| 609E71000 CONCRETE MEDIAN | 115 SF | $22.00 | $42.00 | $13.00 | $16.97 | $13.25 | $22.27 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,339 LB | $2.00 | $3.00 | $4.35 | $3.76 | $2.75 | $1.44 |
| AA1 255E20000 FULL DEPTH PAVEMENT SAWING | 1,900 FT | $2.00 | $2.25 | $1.95 | $1.60 | $1.75 | $2.20 |
| AA1 614E18002 MAINTAINING TRAFFIC, MISC.: LANE CLOSURES FOR PAVE | 1 LS | $6,000 | $10,800 | $9,000 | $10,000 | $6,000 | $53,000 |
| 202E62000 JUNCTION BOX REMOVED | 1 EACH | $150 | $500 | $273 | $150 | $200 | $196 |
| 625E00450 CONNECTION, FUSED PULL APART | 6 EACH | $60.00 | $100 | $65.50 | $60.14 | $107 | $105 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 6 EACH | $70.00 | $125 | $76.50 | $70.16 | $112 | $110 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 16 EACH | $55.00 | $150 | $60.10 | $55.13 | $106 | $104 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 1,026 FT | $3.15 | $2.50 | $3.45 | $3.16 | $2.57 | $2.52 |
| 625E24000 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 600 VOLT CABL | 2,626 FT | $5.25 | $4.50 | $5.75 | $5.26 | $6.20 | $6.09 |
| 625E25400 CONDUIT, 2", 725.04 | 44 FT | $8.60 | $10.00 | $9.40 | $8.62 | $14.47 | $14.21 |
| 625E25401 CONDUIT, 2", 725.04, AS PER PLAN | 284 FT | $10.60 | $30.00 | $11.60 | $10.62 | $15.30 | $15.03 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 72 FT | $35.00 | $50.00 | $38.20 | $35.08 | $57.86 | $56.83 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 83 FT | $1.00 | $1.25 | $1.10 | $1.00 | $1.32 | $1.30 |
| 625E29000 TRENCH | 1,349 FT | $9.25 | $4.00 | $10.10 | $9.27 | $8.09 | $7.95 |
| 625E30706 PULL BOX, 725.08, 24" | 9 EACH | $815 | $1,200 | $890 | $817 | $798 | $784 |
| 625E31510 PULL BOX REMOVED | 7 EACH | $50.00 | $200 | $54.60 | $50.12 | $222 | $218 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $3,000 | $5,000 | $3,277 | $3,007 | $6,272 | $6,160 |
| 625E36000 PLASTIC CAUTION TAPE | 1,349 FT | $0.10 | $0.25 | $0.11 | $0.10 | $0.14 | $0.14 |
| 625E39520 PULL BOX CLEANED | 1 EACH | $100 | $75.00 | $109 | $100 | $123 | $120 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $7,500 | $5,000 | $8,192 | $7,517 | $8,588 | $8,434 |
| 625E75550 DISTRIBUTION CABLE REMOVED | 1,754 FT | $1.00 | $1.00 | $1.10 | $1.00 | $1.01 | $0.99 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 18 EACH | $100 | $75.00 | $109 | $100 | $111 | $109 |
| 621E00100 RPM | 74 EACH | $44.90 | $35.80 | $37.60 | $36.00 | $35.80 | $45.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 41 EACH | $4.41 | $6.50 | $70.90 | $7.02 | $21.15 | $21.62 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 23 EACH | $7.00 | $8.00 | $7.60 | $7.02 | $8.00 | $7.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 415 FT | $9.50 | $10.00 | $10.30 | $9.52 | $10.00 | $9.25 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 88 FT | $15.50 | $17.00 | $16.80 | $15.54 | $17.00 | $17.75 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 37 FT | $21.50 | $24.00 | $23.30 | $21.55 | $24.00 | $24.25 |
| 630E08600 SIGN POST REFLECTOR | 14 EACH | $40.00 | $40.00 | $43.40 | $40.09 | $40.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 6 EACH | $350 | $400 | $380 | $351 | $400 | $400 |
| 630E80100 SIGN, FLAT SHEET | 208 SF | $15.50 | $18.00 | $16.80 | $15.54 | $18.00 | $16.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 6 EACH | $950 | $750 | $1,031 | $952 | $750 | $875 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 21 EACH | $15.00 | $15.00 | $16.30 | $15.03 | $15.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $100 | $65.00 | $109 | $100 | $65.00 | $46.00 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 3 EACH | $500 | $250 | $543 | $501 | $250 | $900 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 24 EACH | $15.00 | $20.00 | $16.30 | $15.03 | $20.00 | $15.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 6 EACH | $300 | $200 | $326 | $301 | $200 | $225 |
| 644E00104 EDGE LINE, 6" | 0.41 MILE | $3,595 | $3,595 | $3,774 | $3,603 | $3,595 | $3,595 |
| 644E00204 LANE LINE, 6" | 0.01 MILE | $2,470 | $2,470 | $2,593 | $2,476 | $2,470 | $2,470 |
| 644E00300 CENTER LINE | 0.01 MILE | $6,130 | $6,130 | $6,435 | $6,144 | $6,130 | $6,130 |
| 644E00400 CHANNELIZING LINE, 8" | 23 FT | $1.40 | $1.40 | $1.45 | $1.40 | $1.40 | $1.40 |
| 644E00404 CHANNELIZING LINE, 12" | 1,452 FT | $1.50 | $1.50 | $1.55 | $1.50 | $1.50 | $1.50 |
| 644E00500 STOP LINE | 72 FT | $4.90 | $4.90 | $5.15 | $4.91 | $4.90 | $4.90 |
| 644E00600 CROSSWALK LINE | 345 FT | $2.90 | $2.90 | $3.05 | $2.91 | $2.90 | $2.90 |
| 644E01300 LANE ARROW | 24 EACH | $75.00 | $75.00 | $78.70 | $75.17 | $75.00 | $75.00 |
| 644E01360 WRONG WAY ARROW | 2 EACH | $65.00 | $65.00 | $68.20 | $65.15 | $65.00 | $65.00 |
| 644E01500 DOTTED LINE, 4" | 45 FT | $1.25 | $1.25 | $1.30 | $1.25 | $1.25 | $1.25 |
| 646E10000 EDGE LINE, 4" | 0.33 MILE | $2,810 | $2,810 | $2,950 | $2,816 | $2,810 | $2,810 |
| 646E10100 LANE LINE, 4" | 0.58 MILE | $2,130 | $2,310 | $2,236 | $2,135 | $2,130 | $2,130 |
| 646E10200 CENTER LINE | 0.13 MILE | $4,415 | $4,415 | $4,635 | $4,425 | $4,415 | $4,415 |
| 646E10300 CHANNELIZING LINE, 8" | 828 FT | $1.25 | $1.25 | $1.30 | $1.25 | $1.25 | $1.25 |
| 646E10400 STOP LINE | 200 FT | $9.15 | $9.15 | $9.60 | $9.17 | $9.15 | $9.15 |
| 646E10500 CROSSWALK LINE | 407 FT | $5.30 | $5.30 | $5.55 | $5.31 | $5.30 | $5.30 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 290 FT | $7.25 | $7.25 | $7.60 | $7.27 | $7.25 | $7.25 |
| 646E10800 ISLAND MARKING | 204 SF | $4.15 | $4.15 | $4.35 | $4.16 | $4.15 | $4.15 |
| 646E20300 LANE ARROW | 12 EACH | $150 | $150 | $158 | $150 | $150 | $150 |
| 646E20400 WORD ON PAVEMENT, 72" | 1 EACH | $175 | $175 | $184 | $175 | $175 | $175 |
| 646E20502 DOTTED LINE, 4" | 98 FT | $1.20 | $1.20 | $1.25 | $1.20 | $1.20 | $1.20 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 310 FT | $7.65 | $7.65 | $8.05 | $7.67 | $7.65 | $7.65 |
| 625E25408 CONDUIT, 2", 725.051 | 18 FT | $3.20 | $6.00 | $3.50 | $3.21 | $10.74 | $10.55 |
| 625E29000 TRENCH | 9 FT | $9.25 | $26.00 | $10.10 | $9.27 | $12.07 | $11.85 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $815 | $1,200 | $890 | $817 | $798 | $784 |
| 625E31510 PULL BOX REMOVED | 5 EACH | $50.00 | $240 | $54.60 | $50.12 | $222 | $218 |
| 625E32000 GROUND ROD | 1 EACH | $195 | $175 | $213 | $195 | $191 | $188 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 3 EACH | $850 | $840 | $929 | $852 | $832 | $818 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,400 | $1,500 | $1,529 | $1,403 | $1,321 | $1,298 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 3 EACH | $25.00 | $50.00 | $27.30 | $25.06 | $13.69 | $13.45 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 1 EACH | $270 | $220 | $295 | $271 | $174 | $171 |
| 632E40200 SIGNAL CABLE, 2 CONDUCTOR, NO. 14 AWG | 40 FT | $1.50 | $1.85 | $1.65 | $1.50 | $2.24 | $2.20 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 240 FT | $2.15 | $4.00 | $2.35 | $2.15 | $2.71 | $2.66 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $1,250 | $1,000 | $1,365 | $1,253 | $1,215 | $1,193 |
| 632E89802 PEDESTAL, 5', TRANSFORMER BASE | 1 EACH | $475 | $600 | $519 | $476 | $559 | $549 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, PEDE | 1 EACH | $100 | $85.00 | $109 | $100 | $99.78 | $98.00 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, PUSH | 1 EACH | $200 | $500 | $219 | $200 | $99.78 | $98.00 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, SIGN | 2 EACH | $150 | $250 | $164 | $150 | $200 | $196 |
| 632E90200 REUSE OF VEHICULAR SIGNAL HEAD | 3 EACH | $250 | $300 | $273 | $251 | $342 | $336 |
| 632E90500 SIGNALIZATION, MISC.:UNLASH AND RELASH MESSENGER W | 335 FT | $8.50 | $5.00 | $9.30 | $8.52 | $3.13 | $3.07 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $65.00 | $75.00 | $75.00 | $75.00 | $75.00 | $80.49 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $2,000 | $1,800 | $1,890 | $2,000 | $1,800 | $4,328 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 88 EACH | $5.00 | $4.00 | $4.20 | $4.00 | $4.00 | $14.77 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 9 EACH | $20.00 | $8.00 | $8.40 | $6.10 | $8.00 | $8.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 9 EACH | $20.00 | $11.00 | $11.60 | $11.00 | $11.00 | $28.84 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.11 MILE | $3,410 | $3,410 | $3,580 | $3,418 | $3,410 | $3,410 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.9 MILE | $3,525 | $3,525 | $3,701 | $3,533 | $3,525 | $3,525 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.41 MILE | $3,435 | $3,435 | $3,606 | $3,443 | $3,435 | $3,435 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 718 FT | $1.16 | $1.16 | $1.20 | $1.16 | $1.16 | $1.16 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,452 FT | $1.13 | $1.13 | $1.20 | $1.13 | $1.13 | $1.13 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT | 540 FT | $1.11 | $1.11 | $1.15 | $1.11 | $1.11 | $1.11 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 32 FT | $3.11 | $3.11 | $3.25 | $3.12 | $3.11 | $3.11 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 72 FT | $3.08 | $3.08 | $3.25 | $3.09 | $3.08 | $3.08 |
| 616E10000 WATER | 5 MGAL | $5.00 | $65.68 | $60.00 | $30.88 | $12.22 | $93.52 |
| 622E41000 PORTABLE BARRIER, 32" | 420 FT | $15.00 | $19.23 | $21.10 | $20.00 | $19.50 | $19.50 |
| 202E75260 VANDAL PROTECTION FENCE REMOVED | 290 FT | $25.00 | $20.00 | $26.40 | $25.06 | $25.00 | $28.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $100 | $1,500 | $2,537 | $1,000 | $163 | $218 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 744 EACH | $16.00 | $11.00 | $14.70 | $15.00 | $12.11 | $6.94 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 329 SY | $7.25 | $7.25 | $13.10 | $7.27 | $11.03 | $7.25 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 345 SY | $20.00 | $20.00 | $24.00 | $22.43 | $29.73 | $20.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 72 SY | $30.00 | $30.00 | $14.80 | $30.00 | $48.64 | $30.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 29 SF | $10.00 | $10.00 | $5.15 | $6.00 | $3.84 | $4.22 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 5 EACH | $2,200 | $2,000 | $1,393 | $2,000 | $2,777 | $4,977 |
| 518E12801 SCUPPER, MODIFICATION, AS PER PLAN | 13 EACH | $700 | $585 | $317 | $600 | $511 | $1,123 |
| 517E75401 RAILING (UPGRADING EXISTING), AS PER PLAN | 94 FT | $65.00 | $113 | $68.70 | $65.15 | $73.44 | $107 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10,000 | $9,800 | $10,000 | $8,630 | $10,562 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $15,000 | $14,295 | $15,000 | $6,138 | $7,148 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 305E13010 9" CONCRETE BASE, CLASS QC1 | 2,601 SY | $60 | $156k | 12% |
| AA1 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 640 SY | $188 | $120k | 9% |
| 607E40000 SPECIAL - VANDAL PROTECTION FENCE | 292 FT | $195 | $57k | 4% |
| 608E10000 4" CONCRETE WALK | 7,259 SF | $7 | $51k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $50k | 4% |
| 809E69100 STOP-BAR RADAR DETECTION | 6 EACH | $8,250 | $50k | 4% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 218 CY | $196 | $43k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 902 CY | $40 | $36k | 3% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $8,500 | $34k | 3% |