DAR-SWEITZER ST.
DAR County · est $2.0M
Bid dateThursday, March 8—
DAR County · est $2.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 92 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Outdoor Enterprise LLC | R3Vtf Excavation LLC | R4R B Jergens Contractors INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,445 CY | $135 | $147 | $160 | $143 | $134 | 15% |
| 608E10000 4" CONCRETE WALK | 29,709 SF | $5.00 | $5.50 | $5.84 | $4.45 | $5.26 | 11% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 5,560 FT | $20.00 | $19.40 | $20.96 | $19.00 | $21.92 | 9% |
| 611E04400 12" CONDUIT, TYPE B |
| Item | Quantity | R1Brumbaugh Construction INC | R2Outdoor Enterprise LLC | R3Vtf Excavation LLC | R4R B Jergens Contractors INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 32,301 SF | $0.65 | $0.50 | $1.23 | $0.90 | $1.20 |
| 202E30200 STEPS REMOVED | 554 FT | $11.00 | $13.00 | $3.65 | $16.00 | $10.15 |
| 202E32000 CURB REMOVED | 4,978 FT | $3.00 | $2.50 | $1.85 | $2.90 | $0.86 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 264 FT | $3.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2,063 FT |
| $44.00 |
| $50.00 |
| $48.14 |
| $48.70 |
| $67.16 |
| 7% |
| 304E20000 AGGREGATE BASE | 2,028 CY | $37.00 | $46.00 | $36.20 | $35.00 | $47.53 | 6% |
| AA2 625E27403 LUMINAIRE, POST TOP, SOLID STATE (LED), AS PER PLA | 31 EACH | $2,100 | $2,150 | $2,349 | $2,085 | $2,027 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 432 CY | $150 | $164 | $177 | $158 | $171 | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (432 CY | $145 | $152 | $166 | $148 | $151 | 5% |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN | 494 FT | $112 | $115 | $127 | $254 | $68.49 | 4% |
| AA2 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN (ALTERNATE 2) | 31 EACH | $1,700 | $1,800 | $1,947 | $1,728 | $1,680 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $50,000 | $60,000 | $25,933 | $54,450 | $58,403 | 4% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 10,376 SY | $4.50 | $4.25 | $2.84 | $8.20 | $9.74 | 4% |
| 610E50010 RETAINING WALL, MISC.:MODULAR RETAINING WALL | 1,164 SF | $38.00 | $40.00 | $51.20 | $45.00 | $32.75 | 3% |
| 611E98180 CATCH BASIN, NO. 3A | 26 EACH | $1,700 | $2,200 | $2,446 | $2,230 | $1,972 | 3% |
| 608E52000 CURB RAMP | 3,280 SF | $12.00 | $11.50 | $12.30 | $9.65 | $10.65 | 3% |
| 611E08900 21" CONDUIT, TYPE B | 538 FT | $66.00 | $75.00 | $61.87 | $77.70 | $90.51 | 3% |
| 517E73500 RAILING, PIPE | 215 FT | $160 | $90.00 | $179 | $155 | $155 | 3% |
| AA2 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN (ALTERNATE 2) | 31 EACH | $1,100 | $1,170 | $1,271 | $1,127 | $1,096 | 3% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 11 EACH | $2,100 | $2,200 | $2,408 | $2,117 | $2,077 | 2% |
| AA2 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE (ALTERNATE 2 | 8,184 FT | $2.75 | $2.95 | $3.20 | $2.85 | $2.76 | 2% |
| $10.00 |
| $11.97 |
| $20.90 |
| $12.71 |
| 202E38000 GUARDRAIL REMOVED | 41 FT | $4.75 | $15.00 | $3.60 | $10.70 | $5.64 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $600 | $900 | $606 | $1,027 | $419 |
| 202E58100 CATCH BASIN REMOVED | 14 EACH | $300 | $650 | $264 | $606 | $419 |
| 202E98200 REMOVAL MISC.: RETAINING WALL REMOVED | 437 FT | $10.00 | $7.00 | $1.79 | $8.75 | $29.61 |
| 202E98600 ABANDON MISC.: FIRE CISTERN ABANDONED | 2 EACH | $5,000 | $6,200 | $345 | $8,795 | $1,238 |
| 203E10000 EXCAVATION | 576 CY | $15.50 | $23.00 | $26.79 | $19.70 | $17.78 |
| 203E20000 EMBANKMENT | 377 CY | $17.00 | $20.00 | $14.63 | $9.00 | $19.50 |
| 204E10000 SUBGRADE COMPACTION | 11,680 SY | $1.00 | $0.60 | $0.90 | $1.50 | $2.08 |
| 204E13000 EXCAVATION OF SUBGRADE | 450 CY | $10.00 | $20.00 | $13.40 | $20.20 | $21.19 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 450 CY | $30.00 | $40.00 | $34.41 | $33.50 | $48.48 |
| 204E45000 PROOF ROLLING | 16 HOUR | $75.00 | $100 | $133 | $319 | $212 |
| 608E41001 CONCRETE STEPS, TYPE B, AS PER PLAN | 48 FT | $135 | $115 | $126 | $205 | $68.55 |
| 690E50600 SPECIAL - BOLLARD | 12 EACH | $510 | $310 | $508 | $445 | $438 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 1,000 SY | $2.00 | $3.00 | $1.69 | $2.45 | $2.31 |
| 659E00300 TOPSOIL | 310 CY | $32.00 | $70.00 | $31.48 | $43.40 | $44.33 |
| 659E10000 SEEDING AND MULCHING | 3,451 SY | $3.75 | $2.00 | $1.61 | $1.40 | $1.39 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $600 | $800 | $896 | $788 | $773 |
| 659E35000 WATER | 150 MGAL | $4.00 | $10.00 | $1.19 | $10.50 | $5.15 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $1,200 | $14,084 | $16,325 | $2,138 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $18,000 | $4,000 | $5,732 | $15,750 | $4,946 |
| 611E05900 15" CONDUIT, TYPE B | 4 FT | $100 | $85.00 | $103 | $501 | $95.90 |
| 611E97200 CONDUIT, MISC.:SANITARY CLEAN OUT ADJUSTED TO GRAD | 27 EACH | $100 | $150 | $105 | $150 | $275 |
| 611E97400 CONDUIT, MISC.:SCHEDULE 40 DOWNSPOUT EXTENSION | 100 FT | $100 | $30.00 | $10.56 | $16.50 | $15.31 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $2,450 | $2,800 | $4,153 | $2,900 | $2,561 |
| 611E99690 MANHOLE, MISC.:ELECTRICAL, ADJUSTED TO GRADE | 2 EACH | $400 | $250 | $302 | $945 | $773 |
| 611E99690 MANHOLE, MISC.:SANITARY, ADJUSTED TO GRADE | 9 EACH | $600 | $750 | $302 | $612 | $550 |
| 611E99690 MANHOLE, MISC.:STORM, ADJUSTED TO GRADE | 2 EACH | $500 | $750 | $302 | $612 | $550 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 77 EACH | $150 | $36.00 | $75.40 | $139 | $275 |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $22,000 | $22,500 | $27,991 | $21,500 | $24,249 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE ,3" | 352 SY | $16.00 | $17.40 | $18.86 | $16.80 | $15.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 10 CY | $35.00 | $65.00 | $94.16 | $45.00 | $51.71 |
| 407E10000 TACK COAT | 1,105 GAL | $5.00 | $6.00 | $5.97 | $5.30 | $2.50 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $525 | $600 | $608 | $545 | $305 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4 CY | $400 | $500 | $451 | $404 | $300 |
| 452E11011 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS | 184 SY | $85.00 | $76.00 | $75.78 | $76.90 | $103 |
| 452E13011 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS | 216 SY | $90.00 | $87.00 | $83.16 | $104 | $78.90 |
| 609E26000 CURB, TYPE 6 | 145 FT | $32.00 | $35.00 | $28.66 | $19.00 | $22.03 |
| 609E28001 CURB, TYPE 7, AS PER PLAN | 120 FT | $63.00 | $70.00 | $64.49 | $42.50 | $33.37 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 30 EACH | $150 | $100 | $75.40 | $220 | $275 |
| 625E00450 CONNECTION, FUSED PULL APART | 22 EACH | $90.00 | $100 | $107 | $93.80 | $92.03 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 28 EACH | $88.00 | $93.00 | $101 | $89.10 | $87.42 |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, TYPE 2 | 11 EACH | $2,000 | $2,100 | $2,277 | $2,002 | $1,965 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 4,962 FT | $2.25 | $2.40 | $2.59 | $2.30 | $2.24 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 4,962 FT | $2.45 | $2.65 | $2.89 | $2.55 | $2.49 |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 180 FT | $3.50 | $3.60 | $3.89 | $3.40 | $3.36 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 3,058 FT | $2.00 | $1.80 | $1.96 | $1.70 | $1.69 |
| 625E25408 CONDUIT, 2", 725.051 | 1,546 FT | $5.00 | $5.30 | $5.71 | $5.00 | $4.93 |
| 625E25504 CONDUIT, 3", 725.051 | 108 FT | $6.00 | $6.35 | $6.89 | $6.05 | $5.95 |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 3" | 30 FT | $100 | $110 | $47.38 | $101 | $99.07 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 11 EACH | $415 | $450 | $485 | $427 | $418 |
| 625E29002 TRENCH, 24" DEEP | 1,561 FT | $8.00 | $8.75 | $4.54 | $8.35 | $8.17 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $800 | $830 | $903 | $794 | $779 |
| 625E32000 GROUND ROD | 12 EACH | $200 | $215 | $231 | $203 | $199 |
| 625E34000 POWER SERVICE | 2 EACH | $2,900 | $3,000 | $3,314 | $2,914 | $2,859 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 2 EACH | $4,400 | $4,800 | $5,157 | $4,534 | $4,449 |
| 625E36000 PLASTIC CAUTION TAPE | 1,561 FT | $0.15 | $0.15 | $0.17 | $0.15 | $0.14 |
| AA2 625E00450 CONNECTION, FUSED PULL APART (ALTERNATE 2) | 62 EACH | $50.00 | $50.00 | $54.00 | $47.90 | $46.59 |
| AA2 625E00480 CONNECTION, UNFUSED PERMANENT (ALTERNATE 2) | 68 EACH | $45.00 | $45.00 | $48.65 | $43.20 | $41.98 |
| AA2 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE (ALTERNATE 2 | 9,660 FT | $2.05 | $2.17 | $2.35 | $2.10 | $2.03 |
| AA2 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE (ALTERNATE 2 | 3,984 FT | $2.25 | $2.45 | $2.65 | $2.35 | $2.29 |
| AA2 625E23400 NO. 10 AWG POLE AND BRACKET CABLE (ALTERNATE 2) | 2,976 FT | $1.75 | $1.80 | $1.96 | $1.75 | $1.69 |
| AA2 625E25408 CONDUIT, 2", 725.051 (ALTERNATE 2) | 2,522 FT | $5.00 | $5.27 | $5.72 | $5.10 | $4.94 |
| AA2 625E25504 CONDUIT, 3", 725.051 (ALTERNATE 2) | 1,425 FT | $6.00 | $6.20 | $6.75 | $6.00 | $5.82 |
| AA2 625E29002 TRENCH, 24" DEEP (ALTERNATE 2) | 2,758 FT | $6.25 | $6.60 | $4.89 | $6.35 | $6.15 |
| AA2 625E29400 TRENCH IN PAVED AREA (ALTERNATE 2) | 235 FT | $60.00 | $62.00 | $40.56 | $59.20 | $57.55 |
| AA2 625E30700 PULL BOX, 725.08, 18" (ALTERNATE 2) | 3 EACH | $800 | $830 | $903 | $801 | $779 |
| AA2 625E32000 GROUND ROD (ALTERNATE 2) | 32 EACH | $200 | $215 | $231 | $205 | $199 |
| AA2 625E36000 PLASTIC CAUTION TAPE (ALTERNATE 2) | 2,993 FT | $0.15 | $0.15 | $0.17 | $0.15 | $0.14 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 264 FT | $10.00 | $11.00 | $11.94 | $9.45 | $9.27 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 210 FT | $10.00 | $11.00 | $14.33 | $12.60 | $12.36 |
| 630E80100 SIGN, FLAT SHEET | 16 SF | $13.00 | $14.00 | $28.66 | $33.60 | $32.97 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 8 EACH | $10.00 | $11.00 | $11.94 | $21.00 | $20.61 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 42 EACH | $45.00 | $50.00 | $59.71 | $52.50 | $51.52 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 42 EACH | $15.00 | $16.50 | $11.94 | $21.00 | $20.61 |
| 644E00300 CENTER LINE | 0.44 MILE | $8,200 | $9,000 | $9,673 | $8,620 | $8,459 |
| 644E00500 STOP LINE | 184 FT | $6.50 | $7.00 | $7.40 | $4.90 | $4.79 |
| 644E00600 CROSSWALK LINE | 942 FT | $3.00 | $3.50 | $3.88 | $2.80 | $2.73 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $500 | $540 | $585 | $473 | $464 |
| 410E10001 TRAFFIC COMPACTED SURFACE, TYPE A, AS PER PLAN | 25 CY | $70.00 | $60.00 | $74.13 | $45.00 | $64.57 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $15,300 | $11,062 | $5,020 | $4,925 |
| 690E70000 SPECIAL - ENVIRONMENTAL , ARCHAEOLOGICAL MONITORIN | 1 LS | $2,000 | $500 | $1,791 | $10,000 | $5,000 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $3,000 | $3,000 | $17,913 | $4,500 | $3,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,000 | $20,000 | $12,202 | $14,750 | $56,081 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20,000 | $39,971 | $21,000 | $21,730 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $1,600 | $2,388 | $1,200 | $1,100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $15,000 | $18,850 | $20,000 | $18,547 |
| 624E10000 MOBILIZATION | 1 LS | $9,511 | $20,000 | $54,969 | $75,000 | $100,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,445 CY | $135 | $195k | 10% |
| 608E10000 4" CONCRETE WALK | 29,709 SF | $5 | $149k | 8% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 5,560 FT | $20 | $111k | 6% |
| 611E04400 12" CONDUIT, TYPE B | 2,063 FT | $44 | $91k | 5% |
| 304E20000 AGGREGATE BASE | 2,028 CY | $37 | $75k | 4% |
| AA2 625E27403 LUMINAIRE, POST TOP, SOLID STATE (LED), AS PER PLA | 31 EACH | $2,100 | $65k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 432 CY | $150 | $65k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (432 CY | $145 | $63k | 3% |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN | 494 FT | $112 | $55k | 3% |
| AA2 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN (ALTERNATE 2) | 31 EACH | $1,700 | $53k | 3% |