HIG-US 50-06.76 Brdg Replace
HIG County · est $1.6M
Bid dateThursday, February 15—
HIG County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 74 more items below.
| Item | Quantity | R1Double Z Construction Company | R2Axis Civil Construction LLC | R3Coopers Excavating LLC | R4Complete General Construction Company | R5R C Construction Company And Son | R6INC George J Igel & CO INC | R7John R Jurgensen Company | R8Shelly & Sands INC | R9Sunesis Construction CO | R10Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 76 FT | $3,200 | $3,400 | $3,816 | $1,700 | $3,200 | $3,900 | $4,434 | $3,375 | $4,704 | $5,500 |
| Item | Quantity | R1Double Z Construction Company | R2Axis Civil Construction LLC | R3Coopers Excavating LLC | R4Complete General Construction Company | R5R C Construction Company And Son | R6INC George J Igel & CO INC | R7John R Jurgensen Company | R8Shelly & Sands INC | R9Sunesis Construction CO | R10Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 3 EACH | $400 | $400 | $250 | $500 | $500 | $450 | $1,220 | $200 | $325 | $406 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 21% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 986 CY | $142 | $142 | $154 | $142 | $145 | $142 | $131 | $142 | $145 | $146 | 12% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 560 CY | $170 | $170 | $151 | $170 | $175 | $170 | $174 | $170 | $170 | $175 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $68,000 | $208,000 | $65,000 | $45,000 | $39,800 | $71,180 | $109,700 | $188,803 | $72,519 | 7% |
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 88 FT | $700 | $1,110 | $675 | $580 | $600 | $680 | $531 | $675 | $760 | $1,304 | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 3,846 FT | $12.00 | $9.75 | $9.50 | $10.00 | $17.00 | $12.00 | $9.50 | $13.00 | $10.55 | $23.04 | 4% |
| 304E20000 AGGREGATE BASE | 650 CY | $65.00 | $58.00 | $58.50 | $75.00 | $55.00 | $50.00 | $60.59 | $45.00 | $57.67 | $56.52 | 4% |
| 203E10000 EXCAVATION | 2,196 CY | $19.00 | $14.00 | $8.25 | $10.00 | $10.00 | $22.00 | $5.63 | $26.00 | $15.18 | $15.59 | 4% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,360 FT | $30.00 | $32.00 | $44.10 | $35.00 | $34.00 | $32.00 | $30.95 | $30.00 | $37.76 | $33.49 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 16 EACH | $2,500 | $1,800 | $1,800 | $1,820 | $1,200 | $1,820 | $1,800 | $1,820 | $1,800 | $1,855 | 3% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $40,000 | $22,000 | $25,000 | $70,000 | $10,000 | $40,000 | $50,025 | $23,500 | $21,796 | $17,002 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $50,000 | $40,000 | $25,000 | $40,000 | $40,000 | $40,000 | $62,850 | $100,000 | 3% |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 493 CY | $80.00 | $95.00 | $71.10 | $125 | $100 | $86.00 | $99.76 | $83.00 | $89.62 | $101 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (171 CY | $210 | $210 | $174 | $210 | $215 | $210 | $213 | $210 | $210 | $216 | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $35,000 | $42,000 | $31,000 | $65,000 | $40,000 | $60,000 | $55,108 | $85,000 | $27,904 | $49,692 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $33,000 | $10,000 | $5,000 | $30,000 | $10,000 | $20,000 | $20,800 | $20,000 | $6,577 | $45,000 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 77 CY | $400 | $455 | $355 | $525 | $500 | $500 | $685 | $700 | $489 | $599 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $30,000 | $25,000 | $20,000 | $35,000 | $6,500 | $62,000 | $11,305 | $13,000 | $17,137 | $23,767 | 3% |
| 832E30000 EROSION CONTROL | 28,866 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 357 CY | $80.00 | $88.00 | $81.50 | $80.00 | $55.00 | $65.00 | $122 | $80.00 | $100 | $94.96 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 2,475 SY | $9.00 | $8.90 | $6.71 | $7.00 | $10.00 | $9.15 | $10.91 | $11.50 | $8.92 | $10.97 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 72 FT | $20.00 | $18.00 | $4.16 | $18.00 | $30.00 | $25.00 | $45.42 | $18.50 | $17.59 | $25.16 |
| 202E35200 PIPE REMOVED, OVER 24" | 392 FT | $20.00 | $23.00 | $9.27 | $20.00 | $50.00 | $25.00 | $34.67 | $25.00 | $12.85 | $19.26 |
| 202E38000 GUARDRAIL REMOVED | 711 FT | $3.00 | $3.00 | $2.00 | $3.50 | $3.00 | $2.50 | $3.50 | $3.50 | $3.55 | $6.29 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 286 FT | $8.00 | $23.00 | $20.50 | $25.00 | $110 | $16.00 | $39.14 | $25.00 | $25.74 | $28.80 |
| 202E75000 FENCE REMOVED | 1,347 FT | $2.00 | $2.50 | $1.00 | $2.45 | $7.00 | $3.00 | $2.45 | $2.45 | $1.88 | $5.82 |
| 203E20000 EMBANKMENT | 2,794 CY | $7.00 | $14.00 | $8.75 | $12.00 | $15.00 | $10.00 | $7.05 | $13.00 | $14.81 | $6.98 |
| 204E10000 SUBGRADE COMPACTION | 4,033 SY | $1.50 | $1.50 | $0.75 | $1.50 | $1.00 | $1.75 | $1.67 | $2.00 | $4.58 | $2.55 |
| 204E45000 PROOF ROLLING | 3 HOUR | $100 | $180 | $1.00 | $250 | $100 | $90.00 | $170 | $175 | $132 | $244 |
| 623E38500 MONUMENT ASSEMBLY | 8 EACH | $1,000 | $400 | $350 | $1,000 | $750 | $1,300 | $716 | $1,200 | $230 | $975 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $125 | $175 | $100 | $435 | $150 | $435 | $177 | $435 | $33.76 | $195 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $10,000 | $10,000 | $7,000 | $13,000 | $15,000 | $11,820 | $9,000 | $9,500 | $9,950 | $12,365 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 133 CY | $130 | $98.00 | $95.00 | $80.00 | $55.00 | $45.00 | $194 | $110 | $103 | $87.51 |
| 659E00300 TOPSOIL | 310 CY | $40.00 | $20.00 | $37.00 | $25.00 | $20.00 | $13.00 | $50.34 | $12.00 | $20.44 | $47.30 |
| 659E10000 SEEDING AND MULCHING | 7,339 SY | $0.72 | $0.72 | $0.72 | $0.72 | $2.00 | $0.72 | $0.65 | $0.65 | $1.92 | $0.67 |
| 659E14000 REPAIR SEEDING AND MULCHING | 367 SY | $0.72 | $0.72 | $0.72 | $0.72 | $1.00 | $0.72 | $0.50 | $0.50 | $2.00 | $0.52 |
| 659E20000 COMMERCIAL FERTILIZER | 0.99 TON | $625 | $625 | $625 | $625 | $1,200 | $625 | $750 | $750 | $400 | $773 |
| 659E31000 LIME | 1.52 ACRE | $75.00 | $75.00 | $75.00 | $75.00 | $800 | $75.00 | $200 | $200 | $40.00 | $206 |
| 659E35000 WATER | 40 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 | $1.03 |
| 670E00500 SLOPE EROSION PROTECTION | 2,786 SY | $1.78 | $1.78 | $1.78 | $1.78 | $5.00 | $1.78 | $1.75 | $1.75 | $2.15 | $1.80 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,000 | $3,000 | $5,500 | $1,975 | $10,000 | $8,740 | $3,625 | $1,200 | $13,914 | $1,108 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $9,000 | $9,030 | $12,500 | $17,500 | $25,000 | $16,200 | $12,150 | $20,500 | $6,660 | $5,564 |
| 602E20000 CONCRETE MASONRY | 0.33 CY | $2,000 | $2,500 | $400 | $3,000 | $1,500 | $2,100 | $2,455 | $2,000 | $2,335 | $1,448 |
| 605E31100 AGGREGATE DRAINS | 514 FT | $6.00 | $8.00 | $10.00 | $20.00 | $10.00 | $11.00 | $15.06 | $14.00 | $9.09 | $14.97 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $12.00 | $10.00 | $4.00 | $30.00 | $20.00 | $31.25 | $28.86 | $20.00 | $26.66 | $15.98 |
| 611E03300 10" CONDUIT, TYPE C | 8 FT | $25.00 | $45.00 | $35.00 | $55.00 | $40.00 | $80.00 | $120 | $85.00 | $157 | $37.16 |
| 611E07600 18" CONDUIT, TYPE C | 115 FT | $40.00 | $45.00 | $31.50 | $150 | $75.00 | $40.00 | $94.34 | $65.00 | $58.84 | $49.31 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,800 | $2,200 | $650 | $2,500 | $2,500 | $1,100 | $1,152 | $2,250 | $1,571 | $1,534 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,000 | $3,200 | $1,200 | $2,500 | $3,500 | $1,600 | $1,843 | $3,100 | $2,197 | $2,550 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2") | 1,534 SY | $7.00 | $8.00 | $5.00 | $7.00 | $10.00 | $7.00 | $7.82 | $7.00 | $7.19 | $7.21 |
| 407E10000 TACK COAT | 523 GAL | $2.50 | $5.00 | $4.00 | $2.50 | $3.00 | $2.50 | $2.50 | $2.50 | $2.50 | $2.58 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 34 CY | $60.00 | $80.00 | $75.00 | $80.00 | $55.00 | $80.00 | $60.04 | $60.00 | $94.00 | $66.98 |
| 621E00100 RPM | 35 EACH | $28.00 | $28.00 | $56.05 | $70.86 | $125 | $100 | $56.05 | $56.00 | $56.05 | $57.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 35 EACH | $10.00 | $10.00 | $10.00 | $20.00 | $50.00 | $10.00 | $18.36 | $10.00 | $1.00 | $11.44 |
| 642E00090 EDGE LINE, 4" | 1.02 MILE | $1,450 | $1,300 | $1,300 | $1,450 | $1,450 | $1,450 | $1,300 | $1,300 | $1,300 | $1,364 |
| 642E00290 CENTER LINE | 0.52 MILE | $2,875 | $1,450 | $1,450 | $2,875 | $2,875 | $2,875 | $1,450 | $1,450 | $1,450 | $2,729 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $40.00 | $48.00 | $150 | $75.00 | $30.00 | $30.00 | $60.52 | $45.00 | $71.92 | $62.16 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $65.00 | $65.00 | $50.00 | $77.50 | $50.00 | $73.50 | $67.28 | $67.00 | $65.00 | $66.98 |
| 614E11630 INCREASED BARRIER DELINEATION | 3,966 FT | $1.00 | $1.40 | $2.50 | $1.40 | $3.00 | $1.10 | $2.50 | $0.50 | $2.50 | $2.58 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 91 EACH | $10.00 | $8.00 | $8.00 | $30.00 | $30.00 | $13.00 | $8.00 | $7.00 | $12.49 | $8.24 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 5 EACH | $12.00 | $10.00 | $8.00 | $30.00 | $30.00 | $10.00 | $8.00 | $10.00 | $12.44 | $8.24 |
| 614E13360 OBJECT MARKER, TWO WAY | 96 EACH | $12.00 | $13.00 | $13.00 | $30.00 | $30.00 | $16.00 | $13.00 | $12.00 | $13.00 | $13.40 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.4 MILE | $10,460 | $10,480 | $4,075 | $10,460 | $7,500 | $10,460 | $4,075 | $4,075 | $4,075 | $9,305 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.97 MILE | $4,380 | $4,380 | $3,930 | $4,380 | $5,500 | $4,380 | $3,930 | $3,930 | $3,930 | $4,659 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 52 FT | $12.75 | $12.75 | $2.50 | $12.75 | $40.00 | $12.75 | $2.50 | $2.50 | $2.50 | $5.15 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 436 SY | $52.00 | $75.00 | $52.80 | $80.00 | $95.00 | $54.00 | $30.42 | $95.00 | $51.43 | $95.17 |
| 616E10000 WATER | 18 MGAL | $10.00 | $1.00 | $1.00 | $55.00 | $1.00 | $30.00 | $79.11 | $35.00 | $7.53 | $42.88 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 120 FT | $20.00 | $14.00 | $13.50 | $18.50 | $20.00 | $17.00 | $13.50 | $35.00 | $17.70 | $25.75 |
| 202E23500 WEARING COURSE REMOVED | 70 SY | $5.00 | $24.00 | $10.00 | $20.00 | $40.00 | $20.00 | $5.47 | $5.00 | $15.73 | $46.37 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $16,000 | $40,970 | $40,970 | $35,000 | $40,000 | $11,750 | $6,988 | $25,000 | $13,616 | $25,760 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,200 FT | $10.00 | $20.00 | $3.00 | $30.00 | $40.00 | $21.50 | $21.94 | $30.00 | $26.44 | $16.49 |
| 507E93300 STEEL POINTS OR SHOES | 32 EACH | $100 | $40.00 | $85.00 | $85.00 | $100 | $210 | $99.45 | $85.00 | $116 | $103 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 11,504 LB | $1.20 | $1.70 | $1.10 | $0.75 | $2.50 | $1.05 | $1.11 | $1.10 | $1.17 | $2.03 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 8 EACH | $30.00 | $35.00 | $37.50 | $40.00 | $100 | $40.00 | $9.13 | $15.00 | $10.11 | $27.39 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 21 CY | $1,000 | $1,100 | $850 | $660 | $500 | $1,200 | $1,455 | $1,000 | $1,222 | $1,626 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 80 SY | $25.00 | $28.00 | $28.00 | $25.00 | $40.00 | $25.00 | $25.00 | $25.00 | $28.42 | $36.81 |
| 512E33000 TYPE 2 WATERPROOFING | 173 SY | $16.54 | $20.00 | $21.00 | $16.54 | $30.00 | $16.54 | $16.54 | $16.50 | $30.43 | $39.85 |
| 512E33010 TYPE 3 WATERPROOFING | 303 SY | $28.00 | $36.00 | $28.00 | $28.00 | $35.00 | $28.00 | $28.00 | $28.00 | $30.17 | $42.79 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 60 SF | $8.00 | $3.00 | $2.00 | $8.00 | $20.00 | $11.20 | $5.07 | $2.50 | $2.20 | $10.19 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 10 CY | $70.00 | $250 | $200 | $135 | $55.00 | $180 | $124 | $190 | $74.97 | $126 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $3,400 | $2,500 | $3,500 | $5,000 | $10,000 | $3,500 | $5,351 | $7,000 | $6,134 | $4,122 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $10,000 | $28,000 | $20,000 | $75,000 | $15,000 | $51,000 | $38,292 | $59,825 | $29,887 | $56,131 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $8,500 | $10,000 | $20,000 | $6,500 | $10,250 | $33,128 | $11,500 | $12,637 | $7,360 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,303 LB | $1.41 | $1.70 | $1.25 | $0.75 | $2.50 | $1.25 | $1.04 | $1.50 | $1.22 | $1.98 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 6 CY | $2,800 | $1,850 | $1,250 | $1,900 | $500 | $2,100 | $2,635 | $2,800 | $2,418 | $3,054 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 20 CY | $600 | $450 | $525 | $975 | $500 | $530 | $810 | $1,000 | $512 | $803 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 30 SY | $35.00 | $36.00 | $28.00 | $35.00 | $40.00 | $35.00 | $35.00 | $35.00 | $41.45 | $32.05 |
| 512E33000 TYPE 2 WATERPROOFING | 214 SY | $22.00 | $16.00 | $21.00 | $22.00 | $30.00 | $22.00 | $22.00 | $22.00 | $23.07 | $39.71 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 30 SF | $8.00 | $5.00 | $2.00 | $10.00 | $20.00 | $20.50 | $4.49 | $3.50 | $2.76 | $11.93 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 3 CY | $500 | $295 | $200 | $235 | $55.00 | $450 | $127 | $300 | $105 | $135 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10,000 | $30,000 | $15,000 | $45,000 | $9,800 | $8,714 | $14,226 | $10,363 | $75,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $1,000 | $1,700 | $100 | $1,500 | $1,500 | $1,700 | $1,264 | $2,500 | $1,494 | $800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $15,000 | $10,000 | $9,000 | $2,000 | $15,000 | $7,917 | $20,000 | $1,215 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 76 FT | $3,200 | $243k | 15% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 986 CY | $142 | $140k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 560 CY | $170 | $95k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $85k | 5% |
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 88 FT | $700 | $62k | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 3,846 FT | $12 | $46k | 3% |
| 304E20000 AGGREGATE BASE | 650 CY | $65 | $42k | 3% |
| 203E10000 EXCAVATION | 2,196 CY | $19 | $42k | 3% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,360 FT | $30 | $41k | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 16 EACH | $2,500 | $40k | 3% |