CUY-West 14th Street
CUY County · est $1.4M
Bid dateThursday, December 17—
CUY County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Perk Company INC | R3Vandra Brothers Construction INC | R4Chagrin Valley Paving INC | R5Vallejo Company | R6Shelly Company | R7Karvo Companies INC | R8Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,455 SY | $89.00 | $50.00 | $105 | $75.00 | $67.39 | $92.50 | $90.00 | $175 | 21% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,125 CY | $165 | $211 | $171 | $167 | $202 |
| Item | Quantity | R1Ronyak Paving INC | R2Perk Company INC | R3Vandra Brothers Construction INC | R4Chagrin Valley Paving INC | R5Vallejo Company | R6Shelly Company | R7Karvo Companies INC | R8Barbicas Construction Company INC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $50,000 | $1,000 | $50.00 | $3,295 | $500 | $250 | $1,500 |
| 608E13001 6" CONCRETE WALK, AS PER PLAN | 909 SF | $10.00 | $9.50 | $9.00 | $10.00 | $8.46 | $10.00 | $13.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $185 |
| $180 |
| $200 |
| 17% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (936 CY | $150 | $152 | $142 | $156 | $168 | $155 | $150 | $180 | 13% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 3,250 SY | $36.00 | $10.00 | $15.00 | $15.00 | $45.00 | $15.25 | $35.00 | $28.00 | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, T | 26,984 SY | $2.00 | $5.95 | $2.00 | $4.00 | $3.10 | $1.75 | $2.70 | $6.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $52,775 | $40,000 | $73,800 | $90,000 | $49,500 | $40,000 | $76,000 | $80,000 | 5% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $52,500 | $34,160 | $91,010 | $92,700 | $48,000 | $191,750 | $100,000 | $125,000 | 5% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,787 SF | $21.00 | $31.90 | $20.00 | $20.00 | $28.82 | $20.00 | $22.00 | $15.00 | 4% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL(WPC & CWD) | 22,000 LB | $1.50 | $0.75 | $1.40 | $1.50 | $1.74 | $1.75 | $1.75 | $5.00 | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 55 EACH | $550 | $850 | $400 | $400 | $321 | $700 | $750 | $650 | 3% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 28 EACH | $750 | $300 | $900 | $750 | $661 | $950 | $950 | $700 | 2% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 23 EACH | $750 | $300 | $650 | $700 | $595 | $850 | $875 | $575 | 2% |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 1.74 MILE | $9,800 | $9,800 | $9,800 | $9,800 | $8,925 | $9,800 | $9,800 | $9,800 | 2% |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 15 EACH | $900 | $350 | $700 | $850 | $793 | $1,000 | $1,000 | $825 | 1% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (91 CY | $135 | $152 | $150 | $180 | $168 | $155 | $150 | $170 | 1% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 12,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $75.00 | $75.00 | $65.00 | $75.00 | $75.53 | $65.00 | $75.00 | $75.00 | 1% |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 2,262 FT | $5.25 | $5.25 | $5.25 | $5.25 | $5.51 | $5.25 | $5.25 | $5.25 | 1% |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 12 EACH | $950 | $400 | $1,200 | $900 | $926 | $1,100 | $1,100 | $1,000 | 1% |
| 644E01630 BIKE LANE SYMBOL MARKING | 30 EACH | $375 | $375 | $375 | $375 | $394 | $375 | $375 | $375 | 1% |
| $4.00 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 150 SF | $50.00 | $25.00 | $25.00 | $25.00 | $112 | $95.00 | $50.00 | $30.00 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 60 FT | $38.50 | $47.00 | $40.00 | $100 | $46.48 | $52.00 | $42.00 | $30.00 |
| 613E41250 LOW STRENGTH MORTAR BACKFILL (TYPE 1) | 120 CY | $60.00 | $66.00 | $60.00 | $200 | $91.22 | $130 | $130 | $80.00 |
| 623E38501 MONUMENT ASSEMBLY, AS PER PLAN | 5 EACH | $830 | $1,000 | $1,100 | $1,250 | $842 | $1,000 | $1,100 | $1,000 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 11 EACH | $575 | $950 | $700 | $400 | $321 | $685 | $725 | $500 |
| 623E40900 MONUMENT, MISC.:MONUMENT REFERENCING | 15 EACH | $125 | $125 | $10.00 | $200 | $245 | $200 | $233 | $200 |
| 659E00501 SEEDING AND MULCHING, CLASS 1, AS PER PLAN, HIGH Q | 95 SY | $10.00 | $25.00 | $3.00 | $35.00 | $10.67 | $15.00 | $2.50 | $4.00 |
| 611E99690 MANHOLE, MISC.:ELECTRICAL MANHOLE ADJUSTED TO GRAD | 2 EACH | $650 | $900 | $650 | $1,000 | $661 | $850 | $875 | $1,000 |
| 611E99690 MANHOLE, MISC.:ELECTRICAL MANHOLE RECONSTRUCTED TO | 2 EACH | $650 | $1,100 | $700 | $1,500 | $925 | $1,100 | $1,100 | $1,110 |
| 611E99690 MANHOLE, MISC.:ELECTRICAL VAULT ADJUSTED TO GRADE | 2 EACH | $650 | $900 | $850 | $1,000 | $661 | $900 | $875 | $1,000 |
| 611E99690 MANHOLE, MISC.:ELECTRICAL VAULT RECONSTRUCTED TO G | 2 EACH | $650 | $1,100 | $900 | $1,500 | $925 | $1,100 | $1,100 | $1,100 |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 800 SY | $4.00 | $6.00 | $3.50 | $6.00 | $4.61 | $8.00 | $2.25 | $6.00 |
| 407E13900 TACK COAT, 702.13 | 2,030 GAL | $2.50 | $2.95 | $3.50 | $3.00 | $4.00 | $3.50 | $2.50 | $2.50 |
| 407E20000 NON-TRACKING TACK COAT | 2,703 GAL | $2.00 | $3.65 | $3.00 | $3.00 | $6.00 | $2.50 | $2.50 | $3.50 |
| 452E12051 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, | 42 SY | $100 | $125 | $90.00 | $150 | $96.31 | $130 | $100 | $89.00 |
| 690E98700 SPECIAL -CONCRETE MIX DESIGN FOR CLASS QC MS CONCR | 60 CY | $10.00 | $20.00 | $12.00 | $25.00 | $11.81 | $10.00 | $10.00 | $20.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,175 LB | $5.00 | $1.65 | $3.80 | $2.00 | $2.00 | $2.75 | $0.70 | $2.00 |
| 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN | 13 EACH | $100 | $10.00 | $75.00 | $400 | $63.36 | $350 | $375 | $200 |
| 638E98000 WATER WORK, MISC.:WATER MANHOLE ADJUSTED TO GRADE, | 5 EACH | $525 | $100 | $700 | $700 | $595 | $850 | $875 | $550 |
| 638E98000 WATER WORK, MISC.:WATER MANHOLE RECONSTRUCTED TO G | 3 EACH | $525 | $950 | $750 | $850 | $793 | $1,100 | $1,100 | $825 |
| 638E98000 WATER WORK, MISC.:WATER METER ADJUSTED TO GRADE, A | 3 EACH | $525 | $850 | $400 | $700 | $595 | $500 | $575 | $1,000 |
| 644E00100 EDGE LINE, 4" | 1.81 MILE | $2,800 | $2,800 | $2,800 | $2,800 | $2,940 | $2,800 | $2,800 | $2,800 |
| 644E00200 LANE LINE, 4" | 0.05 MILE | $1,500 | $1,500 | $1,500 | $1,500 | $1,575 | $1,500 | $1,500 | $1,500 |
| 644E00200 LANE LINE, 4", DOTTED | 0.16 MILE | $8,900 | $8,900 | $8,900 | $8,900 | $9,345 | $8,900 | $8,900 | $8,900 |
| 644E00300 CENTER LINE | 1 MILE | $4,500 | $4,500 | $4,500 | $4,500 | $4,725 | $4,500 | $4,500 | $4,500 |
| 644E00400 CHANNELIZING LINE, 8" | 1,646 FT | $0.95 | $0.95 | $0.95 | $0.95 | $1.00 | $0.95 | $0.95 | $0.95 |
| 644E00500 STOP LINE | 303 FT | $5.50 | $5.50 | $5.50 | $5.50 | $5.78 | $5.50 | $5.50 | $5.50 |
| 644E00600 CROSSWALK LINE | 1,246 FT | $2.75 | $2.75 | $2.75 | $2.75 | $2.89 | $2.75 | $2.75 | $2.75 |
| 644E01300 LANE ARROW | 32 EACH | $95.00 | $95.00 | $95.00 | $95.00 | $99.75 | $95.00 | $95.00 | $95.00 |
| 644E01514 DOTTED LINE, 8" | 611 FT | $2.50 | $2.50 | $2.50 | $2.50 | $2.63 | $2.50 | $2.50 | $2.50 |
| 644E19000 SHARED LANE MARKING | 15 EACH | $400 | $400 | $400 | $400 | $420 | $400 | $400 | $400 |
| 644E50400 PAVEMENT MARKING, MISC.:BIKE LANE DOTTED | 0.3 MILE | $8,900 | $8,900 | $8,900 | $8,900 | $9,345 | $8,900 | $8,900 | $8,900 |
| 644E50400 PAVEMENT MARKING, MISC.:BIKE LANE LINE | 0.94 MILE | $3,800 | $3,800 | $3,800 | $3,800 | $3,990 | $3,800 | $3,800 | $3,800 |
| 646E10000 EDGE LINE, 4" | 0.08 MILE | $7,500 | $7,500 | $7,500 | $7,500 | $7,875 | $7,500 | $7,500 | $7,500 |
| 646E10200 CENTER LINE | 0.12 MILE | $9,500 | $9,500 | $9,500 | $9,500 | $9,975 | $9,500 | $9,500 | $9,500 |
| 646E10300 CHANNELIZING LINE, 8" | 2,080 FT | $1.90 | $1.90 | $1.90 | $1.90 | $2.00 | $1.90 | $1.90 | $1.90 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 421 FT | $7.00 | $7.00 | $7.00 | $7.00 | $7.35 | $7.00 | $7.00 | $7.00 |
| 646E20506 DOTTED LINE, 8" | 80 FT | $5.00 | $5.00 | $5.00 | $5.00 | $5.25 | $5.00 | $5.00 | $5.00 |
| 646E20600 BIKE LANE SYMBOL MARKING | 8 EACH | $275 | $275 | $275 | $275 | $289 | $275 | $275 | $275 |
| 646E90000 PAVEMENT MARKING, MISC.:BIKE LANE LINE | 20 FT | $10.00 | $10.00 | $10.00 | $10.00 | $10.50 | $10.00 | $10.00 | $10.00 |
| 646E90010 PAVEMENT MARKING, MISC.:BIKE LANE DOTTED | 0.03 MILE | $12,000 | $12,000 | $12,000 | $12,000 | $12,600 | $12,000 | $12,000 | $12,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $125 | $300 | $75.00 | $125 | $125 | $115 | $200 | $150 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 5 SNMT | $500 | $500 | $500 | $500 | $945 | $500 | $500 | $500 |
| 616E10000 WATER | 30 MGAL | $5.00 | $1.00 | $1.00 | $1.00 | $46.79 | $10.00 | $1.00 | $10.00 |
| 616E20000 CALCIUM CHLORIDE | 3 TON | $45.00 | $200 | $100 | $10.00 | $1,098 | $100 | $5.00 | $200 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.72 MILE | $2,500 | $2,500 | $2,500 | $2,500 | $1,313 | $2,500 | $2,500 | $2,500 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.26 MILE | $1,100 | $1,100 | $1,100 | $1,100 | $1,050 | $1,100 | $1,100 | $1,100 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.26 MILE | $5,200 | $5,200 | $5,200 | $5,200 | $4,463 | $5,200 | $5,200 | $5,200 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 160 FT | $3.50 | $3.50 | $3.50 | $3.50 | $3.41 | $3.50 | $3.50 | $3.50 |
| 614E27000 WORK ZONE CROSSWALK LINE, CLASS I | 600 FT | $2.00 | $2.00 | $2.00 | $2.00 | $2.99 | $2.00 | $2.00 | $2.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $17,140 | $13,000 | $9,000 | $8,071 | $4,000 | $15,000 | $50,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 5 MNTH | $2,000 | $2,500 | $2,500 | $1,500 | $2,433 | $2,500 | $2,000 | $750 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $8,581 | $3,500 | $5,000 | $100 | $8,888 | $3,000 | $12,000 | $240 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,455 SY | $89 | $218k | 18% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,125 CY | $165 | $186k | 15% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (936 CY | $150 | $140k | 11% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 3,250 SY | $36 | $117k | 10% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, T | 26,984 SY | $2 | $54k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $52,775 | $53k | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $52,500 | $53k | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,787 SF | $21 | $38k | 3% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL(WPC & CWD) | 22,000 LB | $1.5 | $33k | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 55 EACH | $550 | $30k | 2% |