MER-SR 716-05.02
MER County · est $0.3M
Bid dateThursday, January 14—
MER County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Miller Bros Const INC | R4Rietschlin Construction INC | R5Complete General Construction Company | R6R G Zachrich Construction INC | R7R B Jergens Contractors INC | R8Chagrin Valley Paving INC | R9Bcc Ohio INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 511E33413 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 46 CY | $1,150 | $1,850 | $1,300 | $1,225 | $1,600 | $1,200 | $1,952 | $1,200 | $1,301 | 19% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 160 SY |
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Miller Bros Const INC | R4Rietschlin Construction INC | R5Complete General Construction Company | R6R G Zachrich Construction INC | R7R B Jergens Contractors INC | R8Chagrin Valley Paving INC | R9Bcc Ohio INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $250 | $1,000 | $3,000 | $4,000 | $500 | $1,203 | $2,000 | $390 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 4 EACH | $300 | $200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $220 |
| $268 |
| $300 |
| $267 |
| $300 |
| $240 |
| $259 |
| $245 |
| $386 |
| 12% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $30,000 | $28,000 | $39,500 | $26,000 | $34,000 | $55,000 | $30,229 | $25,000 | $36,720 | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 135 CY | $180 | $172 | $210 | $186 | $172 | $172 | $179 | $210 | $221 | 9% |
| 509E40000 REINFORCING STEEL, MISC.: GALVANIZED COATED REINFO | 10,783 LB | $1.65 | $1.50 | $1.75 | $2.00 | $1.61 | $1.50 | $1.51 | $2.10 | $2.39 | 6% |
| 832E30000 EROSION CONTROL | 13,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 58 CY | $220 | $214 | $300 | $232 | $215 | $214 | $223 | $300 | $315 | 5% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 550 FT | $22.00 | $16.85 | $16.85 | $19.00 | $17.60 | $19.70 | $17.51 | $17.60 | $18.48 | 4% |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN (MASH 201 | 4 EACH | $2,400 | $2,450 | $2,450 | $2,420 | $2,240 | $2,350 | $2,545 | $2,240 | $2,352 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $9,500 | $10,000 | $10,000 | $30,000 | $10,000 | $22,000 | $17,789 | $31,250 | $18,458 | 3% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,200 | $2,175 | $2,175 | $2,214 | $2,050 | $2,200 | $2,260 | $2,050 | $2,153 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $8,700 | $9,000 | $7,875 | $5,400 | $5,000 | $5,000 | $5,315 | $3,500 | $3,900 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 49 FT | $160 | $147 | $147 | $174 | $155 | $147 | $153 | $151 | $163 | 3% |
| 304E20000 AGGREGATE BASE | 120 CY | $60.00 | $75.00 | $75.00 | $70.00 | $80.00 | $52.00 | $53.14 | $80.00 | $85.73 | 3% |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 80 CY | $80.00 | $90.00 | $120 | $110 | $95.00 | $90.00 | $102 | $120 | $130 | 2% |
| 202E38000 GUARDRAIL REMOVED | 1,005 FT | $6.00 | $2.10 | $1.40 | $3.00 | $1.80 | $2.00 | $1.45 | $1.00 | $1.89 | 2% |
| 202E23000 PAVEMENT REMOVED | 525 SY | $10.00 | $10.00 | $8.00 | $8.00 | $11.00 | $6.00 | $9.49 | $10.00 | $10.50 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 177 SY | $28.00 | $25.00 | $30.00 | $27.00 | $25.00 | $32.00 | $17.16 | $35.00 | $23.51 | 2% |
| 659E00300 TOPSOIL | 132 CY | $36.00 | $5.00 | $25.00 | $34.00 | $30.00 | $35.00 | $48.44 | $70.00 | $35.70 | 2% |
| 202E22900 APPROACH SLAB REMOVED | 118 SY | $40.00 | $35.00 | $37.00 | $51.00 | $42.00 | $40.00 | $32.23 | $29.00 | $54.76 | 2% |
| $200 |
| $360 |
| $245 |
| $195 |
| $208 |
| $265 |
| $257 |
| 203E10000 EXCAVATION | 143 CY | $20.00 | $21.00 | $20.00 | $21.00 | $25.00 | $20.00 | $19.06 | $35.00 | $11.70 |
| 203E20000 EMBANKMENT | 173 CY | $20.00 | $23.00 | $20.00 | $18.00 | $32.00 | $20.00 | $7.76 | $40.00 | $11.70 |
| 204E10000 SUBGRADE COMPACTION | 713 SY | $1.00 | $4.00 | $1.75 | $2.00 | $3.00 | $2.00 | $3.85 | $3.00 | $1.95 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 6 STA | $80.00 | $50.00 | $300 | $220 | $50.00 | $200 | $51.94 | $70.00 | $52.50 |
| 606E15050 GUARDRAIL, TYPE MGS | 225 FT | $20.00 | $15.80 | $15.80 | $17.50 | $16.20 | $18.00 | $16.41 | $16.20 | $17.01 |
| 659E10000 SEEDING AND MULCHING | 1,190 SY | $2.25 | $2.50 | $2.86 | $2.75 | $2.75 | $2.15 | $2.31 | $2.75 | $2.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.16 TON | $650 | $1,250 | $600 | $800 | $320 | $750 | $807 | $320 | $336 |
| 659E31000 LIME | 0.25 ACRE | $5.00 | $10.00 | $30.00 | $100 | $20.00 | $100 | $108 | $20.00 | $21.00 |
| 659E35000 WATER | 7 MGAL | $5.00 | $10.00 | $1.00 | $10.00 | $1.00 | $2.00 | $10.76 | $1.00 | $1.05 |
| 670E00500 SLOPE EROSION PROTECTION | 321 SY | $6.50 | $2.50 | $2.00 | $5.00 | $3.30 | $3.00 | $3.23 | $3.30 | $3.47 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $175 | $125 | $150 | $135 | $390 | $80.00 | $89.09 | $150 | $266 |
| 605E31100 AGGREGATE DRAINS | 33 FT | $18.00 | $12.00 | $24.00 | $27.00 | $22.00 | $12.00 | $24.37 | $30.00 | $20.90 |
| 611E01400 6" CONDUIT, TYPE E | 20 FT | $20.00 | $6.00 | $10.00 | $20.00 | $35.00 | $12.00 | $23.67 | $25.00 | $25.61 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $200 | $175 | $100 | $270 | $250 | $280 | $387 | $500 | $334 |
| 407E10000 TACK COAT | 88 GAL | $5.00 | $4.50 | $1.00 | $5.00 | $4.50 | $4.50 | $4.67 | $1.00 | $1.05 |
| 617E10100 COMPACTED AGGREGATE | 1 CY | $90.00 | $150 | $65.00 | $360 | $360 | $500 | $348 | $500 | $157 |
| 626E00116 BARRIER REFLECTOR, TYPE 5 (BIDIRECTIONAL) | 17 EACH | $20.00 | $10.00 | $18.00 | $9.00 | $8.00 | $18.00 | $18.70 | $8.00 | $8.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 10 FT | $10.00 | $22.00 | $14.00 | $24.00 | $22.00 | $9.00 | $14.54 | $22.00 | $23.10 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 0.67 SF | $100 | $50.00 | $550 | $54.00 | $50.00 | $100 | $571 | $50.00 | $52.51 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $50.00 | $10.00 | $70.00 | $11.00 | $10.00 | $45.00 | $72.72 | $10.00 | $10.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $25.00 | $16.50 | $35.00 | $18.00 | $16.50 | $15.00 | $36.36 | $16.50 | $17.33 |
| 646E10010 EDGE LINE, 6" | 0.1 MILE | $38,000 | $24,966 | $24,966 | $37,800 | $34,932 | $34,932 | $25,937 | $66,500 | $36,679 |
| 646E10200 CENTER LINE | 0.05 MILE | $77,000 | $47,667 | $47,667 | $75,500 | $69,880 | $69,880 | $49,521 | $66,500 | $73,374 |
| 202E23500 WEARING COURSE REMOVED | 195 SY | $18.00 | $12.00 | $10.42 | $10.00 | $18.00 | $8.00 | $7.42 | $17.00 | $13.91 |
| 203E10000 EXCAVATION | 6 CY | $25.00 | $50.00 | $75.00 | $200 | $360 | $20.00 | $62.32 | $900 | $48.75 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $1,500 | $4,500 | $5,500 | $8,500 | $7,000 | $10,287 | $10,460 | $5,000 | $1,602 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 94 EACH | $25.00 | $15.00 | $22.00 | $22.00 | $17.00 | $60.00 | $14.88 | $18.00 | $14.63 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 29 FT | $130 | $90.00 | $100 | $92.00 | $85.00 | $220 | $137 | $75.00 | $114 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 45 SF | $3.00 | $5.00 | $5.50 | $8.00 | $11.00 | $8.74 | $4.45 | $10.00 | $9.98 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 62 SF | $5.00 | $6.21 | $6.50 | $10.00 | $12.00 | $4.73 | $5.23 | $8.00 | $10.88 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 115 FT | $27.00 | $30.00 | $32.00 | $27.00 | $42.00 | $30.00 | $34.78 | $21.00 | $39.64 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 22 CY | $75.00 | $110 | $100 | $115 | $95.00 | $80.00 | $89.66 | $110 | $87.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 43 FT | $12.00 | $12.00 | $16.00 | $19.00 | $18.00 | $14.00 | $17.36 | $20.00 | $13.13 |
| 526E90020 TYPE B INSTALLATION | 47 SY | $70.00 | $40.00 | $27.03 | $80.00 | $60.00 | $35.00 | $137 | $140 | $54.26 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $6,500 | $4,000 | $4,500 | $4,000 | $6,000 | $4,763 | $4,500 | $5,010 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,000 | $2,500 | $600 | $4,200 | $3,000 | $4,380 | $4,708 | $3,000 | $1,502 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $800 | $1,500 | $2,000 | $1,764 | $2,000 | $1,200 | $1,058 | $500 | $2,085 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $3,700 | $4,750 | $3,000 | $3,000 | $6,500 | $5,870 | $7,000 | $1,725 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E33413 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 46 CY | $1,150 | $53k | 15% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 160 SY | $220 | $35k | 10% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $30,000 | $30k | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 135 CY | $180 | $24k | 7% |
| 509E40000 REINFORCING STEEL, MISC.: GALVANIZED COATED REINFO | 10,783 LB | $1.65 | $18k | 5% |
| 832E30000 EROSION CONTROL | 13,000 EACH | $1 | $13k | 4% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 58 CY | $220 | $13k | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 550 FT | $22 | $12k | 4% |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN (MASH 201 | 4 EACH | $2,400 | $10k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $9,500 | $9k | 3% |