LIC-US 40-14.90
LIC County · est $0.6M
Bid dateThursday, January 28—
LIC County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Buds INC | R2Tucson INC | R3Eclipse CO LLC | R4Axis Civil Construction LLC | R5Complete General Construction Company | R6Double Z Construction Company | R7Ohio-west Virginia Excavating CO | R8Shelly & Sands INC | R9M Campbell Contracting LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E95701 12' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN | 59 FT | $1,246 | $1,170 | $920 | $1,180 | $1,300 | $1,250 | $1,400 | $1,300 | $1,192 | 21% |
| 611E05900 15" CONDUIT, TYPE B | 723 FT | $55.00 | $55.00 |
| Item | Quantity | R1Buds INC | R2Tucson INC | R3Eclipse CO LLC | R4Axis Civil Construction LLC | R5Complete General Construction Company | R6Double Z Construction Company | R7Ohio-west Virginia Excavating CO | R8Shelly & Sands INC | R9M Campbell Contracting LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $1,500 | $2,939 | $5,000 | $4,000 | $2,500 | $3,500 | $3,000 | $1,500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 225 FT | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $69.50 |
| $62.00 |
| $92.00 |
| $75.00 |
| $52.00 |
| $81.00 |
| $56.90 |
| 11% |
| 608E10000 4" CONCRETE WALK | 5,713 SF | $6.55 | $7.50 | $7.00 | $5.70 | $5.50 | $6.00 | $6.50 | $6.25 | $8.50 | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 95 CY | $200 | $230 | $222 | $240 | $195 | $200 | $220 | $195 | $305 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 39 CY | $475 | $718 | $556 | $460 | $450 | $525 | $600 | $825 | $835 | 5% |
| 638E98600 WATER WORK, MISC.:8" WATER LINE | 75 FT | $195 | $100 | $199 | $180 | $240 | $100 | $225 | $225 | $162 | 4% |
| 304E20000 AGGREGATE BASE | 160 CY | $90.00 | $55.00 | $82.50 | $115 | $75.00 | $110 | $100 | $108 | $70.75 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 40 CY | $350 | $319 | $247 | $360 | $350 | $370 | $285 | $350 | $515 | 4% |
| 611E98450 CATCH BASIN, NO. 2-2A | 6 EACH | $2,200 | $1,200 | $2,516 | $2,500 | $1,500 | $2,000 | $2,000 | $2,510 | $1,522 | 4% |
| 611E16400 36" CONDUIT, TYPE B | 148 FT | $85.00 | $125 | $121 | $145 | $155 | $150 | $140 | $125 | $107 | 4% |
| 611E10400 24" CONDUIT, TYPE B | 187 FT | $66.00 | $85.00 | $90.50 | $85.00 | $130 | $100 | $115 | $97.00 | $86.00 | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $12,000 | $3,000 | $4,371 | $9,500 | $10,000 | $17,000 | $5,000 | $5,000 | $10,100 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 14 CY | $850 | $1,625 | $1,262 | $1,150 | $1,400 | $1,700 | $975 | $3,675 | $1,380 | 3% |
| 203E20000 EMBANKMENT | 645 CY | $18.00 | $9.00 | $12.00 | $24.00 | $18.00 | $25.00 | $48.00 | $25.00 | $24.30 | 3% |
| 517E76300 RAILING, MISC.: DECORATIVE STEEL RAILING | 75 FT | $147 | $156 | $396 | $267 | $267 | $145 | $280 | $105 | $387 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $9,000 | $16,500 | $58,140 | $20,000 | $20,000 | $40,000 | $20,000 | $20,000 | $33,700 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $7,000 | $8,810 | $4,000 | $5,000 | $4,200 | $10,000 | $4,000 | $11,000 | 2% |
| 202E30000 WALK REMOVED | 5,580 SF | $1.35 | $1.50 | $0.50 | $1.55 | $1.75 | $1.50 | $1.50 | $0.50 | $3.50 | 2% |
| 638E11608 SPECIAL - 12" WATER MAIN DIP AND FITTINGS (VILLAGE | 100 FT | $75.00 | $148 | $169 | $200 | $225 | $100 | $210 | $268 | $168 | 2% |
| 202E23000 PAVEMENT REMOVED | 498 SY | $15.00 | $8.50 | $8.50 | $12.00 | $15.00 | $14.00 | $10.00 | $8.50 | $10.60 | 2% |
| $13.00 |
| $29.50 |
| $24.00 |
| $10.00 |
| $6.00 |
| $23.00 |
| $21.00 |
| $10.80 |
| 202E35200 PIPE REMOVED, OVER 24" | 150 FT | $22.00 | $13.00 | $24.00 | $24.00 | $20.00 | $10.00 | $35.00 | $10.50 | $15.00 |
| 203E10000 EXCAVATION | 251 CY | $16.00 | $8.00 | $11.50 | $24.00 | $30.00 | $20.00 | $25.00 | $16.25 | $31.70 |
| 204E10000 SUBGRADE COMPACTION | 1,507 SY | $3.00 | $1.50 | $3.00 | $2.00 | $4.00 | $6.00 | $4.00 | $2.75 | $1.80 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $200 | $200 | $336 | $300 | $125 | $250 | $100 | $225 | $250 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 45 CY | $90.00 | $115 | $78.00 | $88.00 | $120 | $90.00 | $115 | $127 | $107 |
| 659E10000 SEEDING AND MULCHING | 1,850 SY | $2.25 | $3.50 | $1.50 | $1.60 | $1.60 | $5.00 | $3.00 | $1.38 | $9.15 |
| 659E14000 REPAIR SEEDING AND MULCHING | 93 SY | $0.05 | $1.00 | $1.50 | $1.60 | $1.60 | $1.60 | $2.00 | $0.68 | $1.30 |
| 659E15000 INTER-SEEDING | 93 SY | $0.05 | $1.00 | $1.50 | $1.60 | $1.60 | $1.60 | $2.00 | $0.68 | $1.30 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $500 | $1,235 | $641 | $610 | $610 | $610 | $300 | $642 | $1,042 |
| 659E31000 LIME | 0.38 ACRE | $300 | $73.00 | $84.00 | $80.00 | $80.00 | $80.00 | $200 | $155 | $207 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.15 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $26.25 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 28 GAL | $2.00 | $3.50 | $16.00 | $3.00 | $1.75 | $4.50 | $10.00 | $1.75 | $8.40 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 26 SY | $130 | $130 | $149 | $110 | $85.00 | $95.00 | $176 | $132 | $107 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 1 EACH | $5,000 | $1,200 | $2,243 | $2,500 | $1,500 | $800 | $1,500 | $2,600 | $1,254 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $400 | $99.00 | $575 | $200 | $200 | $200 | $400 | $775 | $243 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.05 MILE | $13,000 | $16,000 | $2,329 | $2,218 | $14,950 | $2,218 | $16,000 | $2,218 | $15,697 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $13,000 | $27,540 | $3,297 | $3,140 | $25,500 | $3,140 | $27,000 | $3,140 | $26,775 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $9,800 | $9,571 | $24,000 | $10,000 | $25,000 | $23,000 | $6,300 | $35,400 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $650 | $972 | $630 | $1,800 | $1,000 | $700 | $1,700 | $1,100 | $1,575 |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $4,000 | $4,500 | $3,228 | $3,200 | $2,000 | $2,500 | $3,000 | $2,300 | $966 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,000 | $4,500 | $8,136 | $7,500 | $8,000 | $5,000 | $15,000 | $9,650 | $7,045 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $4,000 | $4,000 | $3,493 | $8,500 | $10,000 | $11,000 | $9,000 | $10,000 | $11,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,845 LB | $1.45 | $1.81 | $2.00 | $1.90 | $1.25 | $2.00 | $2.00 | $2.00 | $1.20 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $1,500 | $3,315 | $1,649 | $600 | $1,500 | $2,000 | $850 | $1,230 | $720 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 62 SY | $25.00 | $70.00 | $19.00 | $30.00 | $20.00 | $50.00 | $30.00 | $42.00 | $40.00 |
| 512E33000 TYPE 2 WATERPROOFING | 95 SY | $18.00 | $38.00 | $22.50 | $18.00 | $25.00 | $25.00 | $29.00 | $23.50 | $31.00 |
| 512E33010 TYPE 3 WATERPROOFING | 105 SY | $40.00 | $38.00 | $44.00 | $30.00 | $35.00 | $35.00 | $39.00 | $35.00 | $30.70 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 28 SF | $15.00 | $30.00 | $5.00 | $5.00 | $9.00 | $15.00 | $4.00 | $1.50 | $24.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 27 CY | $100 | $275 | $95.00 | $125 | $100 | $110 | $125 | $280 | $191 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $4,500 | $6,875 | $10,000 | $3,000 | $8,000 | $2,500 | $9,500 | $5,830 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95701 12' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN | 59 FT | $1,246 | $74k | 17% |
| 611E05900 15" CONDUIT, TYPE B | 723 FT | $55 | $40k | 9% |
| 608E10000 4" CONCRETE WALK | 5,713 SF | $6.55 | $37k | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 95 CY | $200 | $19k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 39 CY | $475 | $19k | 4% |
| 638E98600 WATER WORK, MISC.:8" WATER LINE | 75 FT | $195 | $15k | 3% |
| 304E20000 AGGREGATE BASE | 160 CY | $90 | $14k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 40 CY | $350 | $14k | 3% |
| 611E98450 CATCH BASIN, NO. 2-2A | 6 EACH | $2,200 | $13k | 3% |
| 611E16400 36" CONDUIT, TYPE B | 148 FT | $85 | $13k | 3% |