MAR-SR 423-02.14
MAR County · est $0.7M
Bid dateThursday, September 15—
MAR County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2Adena Corporation | R3Eagle Bridge CO | R4Park Enterprise Construction CO INC | R5R G Zachrich Construction INC | R6Shelly & Sands INC | R7Complete General Construction Company | R8Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E95800 12' X 6' CONDUIT, TYPE A, 706.05 | 96 FT | $1,175 | $2,072 | $1,550 | $2,162 | $1,200 | $2,370 | $3,200 | $2,345 | 26% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 242 CY | $195 | $257 | $204 | $204 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Adena Corporation | R3Eagle Bridge CO | R4Park Enterprise Construction CO INC | R5R G Zachrich Construction INC | R6Shelly & Sands INC | R7Complete General Construction Company | R8Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $13,820 | $10,000 | $15,444 | $16,000 | $25,000 | $15,000 | $18,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 83 FT | $10.00 | $6.25 | $10.00 | $63.49 | $30.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $210 |
| $300 |
| $300 |
| $338 |
| 11% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $10,471 | $20,000 | $16,238 | $40,000 | $20,000 | $20,000 | $40,863 | 9% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 80 CY | $375 | $318 | $300 | $325 | $325 | $330 | $225 | $431 | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 97 CY | $265 | $289 | $262 | $262 | $270 | $375 | $375 | $584 | 6% |
| 832E30000 EROSION CONTROL | 18,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 21 CY | $850 | $771 | $900 | $1,204 | $650 | $2,910 | $1,500 | $1,900 | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 25 CY | $700 | $697 | $600 | $871 | $900 | $1,525 | $670 | $1,055 | 4% |
| 304E20000 AGGREGATE BASE | 222 CY | $65.00 | $73.73 | $75.00 | $63.60 | $60.00 | $68.00 | $115 | $89.00 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 6,280 LB | $2.25 | $1.66 | $2.00 | $3.14 | $2.00 | $2.00 | $2.25 | $4.00 | 3% |
| 203E10000 EXCAVATION | 1,264 CY | $10.00 | $29.05 | $18.00 | $30.37 | $12.00 | $19.25 | $30.00 | $36.00 | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $12,500 | $12,761 | $20,000 | $11,974 | $30,000 | $20,000 | $35,000 | $10,881 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 437.5 FT | $28.00 | $29.72 | $26.00 | $34.25 | $27.30 | $21.20 | $21.20 | $23.18 | 3% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $12,000 | $5,144 | $6,500 | $2,968 | $7,500 | $5,000 | $5,000 | $5,228 | 3% |
| 659E00300 TOPSOIL | 209 CY | $50.00 | $34.97 | $10.00 | $44.60 | $35.00 | $35.00 | $40.00 | $81.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 930 SY | $10.00 | $13.20 | $9.00 | $4.25 | $8.50 | $6.00 | $9.00 | $5.00 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,300 | $2,458 | $2,150 | $3,539 | $2,258 | $2,925 | $2,925 | $3,165 | 2% |
| 642E00114 EDGE LINE, 6", TYPE 1A | 10 MILE | $850 | $866 | $800 | $913 | $800 | $800 | $800 | $1,059 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $8,500 | $22,770 | $125,000 | $23,473 | $30,000 | $20,000 | $25,000 | $11,400 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $3,109 | $7,500 | $17,893 | $6,000 | $540 | $3,000 | $9,937 | 2% |
| $10.00 |
| $40.00 |
| $25.00 |
| 202E38000 GUARDRAIL REMOVED | 782 FT | $2.00 | $6.18 | $4.00 | $4.37 | $15.00 | $2.00 | $2.00 | $2.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 6 EACH | $250 | $398 | $250 | $143 | $250 | $265 | $265 | $310 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 1 EACH | $200 | $7,346 | $50.00 | $108 | $1,000 | $200 | $380 | $276 |
| 202E75000 FENCE REMOVED | 578 FT | $5.00 | $0.79 | $3.00 | $4.44 | $11.00 | $4.50 | $4.50 | $6.00 |
| 203E10000 EXCAVATION | 46 CY | $20.00 | $21.41 | $50.00 | $88.28 | $25.00 | $25.00 | $40.00 | $33.00 |
| 203E20000 EMBANKMENT | 168 CY | $20.00 | $23.45 | $45.00 | $53.14 | $30.00 | $26.00 | $45.00 | $33.00 |
| 204E10000 SUBGRADE COMPACTION | 1,097 SY | $2.00 | $2.03 | $3.50 | $1.50 | $5.00 | $5.00 | $3.00 | $1.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $200 | $155 | $125 | $264 | $850 | $243 | $115 | $318 |
| 209E10000 DITCH CLEANOUT | 275 FT | $3.00 | $10.71 | $10.00 | $18.29 | $25.00 | $13.50 | $35.00 | $38.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 162.5 FT | $31.00 | $33.15 | $29.00 | $39.96 | $30.45 | $22.80 | $22.80 | $26.18 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,250 | $1,315 | $1,150 | $2,266 | $1,208 | $1,430 | $1,430 | $1,519 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 1 EACH | $1,400 | $1,790 | $3,250 | $1,415 | $1,500 | $2,400 | $900 | $2,763 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $20.00 | $1,064 | $1.00 | $52.00 | $150 | $1.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $250 | $100 | $150 | $114 | $98.00 | $98.00 | $150 | $102 |
| 659E10000 SEEDING AND MULCHING | 1,886 SY | $2.00 | $1.44 | $2.20 | $6.16 | $1.66 | $1.66 | $2.20 | $1.72 |
| 659E14000 REPAIR SEEDING AND MULCHING | 94 SY | $2.00 | $2.00 | $2.20 | $13.70 | $0.78 | $0.79 | $2.20 | $0.81 |
| 659E15000 INTER-SEEDING | 94 SY | $2.00 | $2.00 | $2.20 | $13.70 | $0.78 | $0.79 | $2.20 | $0.81 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $800 | $1,697 | $1,400 | $1,199 | $930 | $930 | $1,400 | $963 |
| 659E31000 LIME | 0.39 ACRE | $400 | $1,530 | $80.00 | $114 | $154 | $154 | $80.00 | $167 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.00 | $1.00 | $11.42 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 566 SY | $4.00 | $2.23 | $2.50 | $2.74 | $1.45 | $1.45 | $2.50 | $2.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $1,500 | $1,283 | $1,500 | $3,017 | $1,424 | $2,400 | $1,600 | $1,693 |
| 605E31100 AGGREGATE DRAINS | 111 FT | $10.00 | $5.51 | $15.00 | $53.74 | $1,610 | $15.50 | $18.00 | $18.00 |
| 611E07200 18" CONDUIT, TYPE A, 706.02, 707.33 WITH WELDED BE | 83 FT | $70.00 | $163 | $180 | $220 | $150 | $175 | $135 | $125 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 648 SY | $12.00 | $19.43 | $14.00 | $21.76 | $10.00 | $25.00 | $25.00 | $6.15 |
| 407E20000 NON-TRACKING TACK COAT | 198 GAL | $5.00 | $9.14 | $8.00 | $8.00 | $8.24 | $4.00 | $4.00 | $3.10 |
| 617E10100 COMPACTED AGGREGATE | 35 CY | $80.00 | $40.82 | $110 | $125 | $60.00 | $250 | $115 | $325 |
| 617E25000 WATER | 1 MGAL | $1.00 | $1.00 | $10.00 | $1,064 | $1.00 | $52.00 | $150 | $124 |
| 621E00100 RPM | 11 EACH | $340 | $264 | $353 | $453 | $400 | $245 | $400 | $411 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BIDIRECTIONAL | 21 EACH | $12.00 | $12.57 | $11.00 | $31.97 | $11.55 | $11.00 | $11.00 | $12.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 38.5 FT | $20.00 | $21.73 | $19.00 | $20.55 | $19.00 | $15.60 | $15.60 | $22.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 46 FT | $21.00 | $22.86 | $20.00 | $22.83 | $20.00 | $17.90 | $17.90 | $24.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $26.00 | $28.57 | $25.00 | $114 | $25.00 | $45.00 | $45.00 | $74.00 |
| 630E80100 SIGN, FLAT SHEET | 25.3 SF | $18.00 | $19.47 | $17.00 | $43.38 | $17.00 | $20.00 | $20.00 | $47.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $75.00 | $28.57 | $25.00 | $45.66 | $25.00 | $10.00 | $10.00 | $29.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $55.00 | $57.15 | $50.00 | $91.33 | $50.00 | $65.00 | $65.00 | $140 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $100 | $28.57 | $25.00 | $45.67 | $25.00 | $15.00 | $15.00 | $44.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $850 | $14,435 | $800 | $913 | $800 | $800 | $800 | $18,569 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $1,000 | $26,290 | $950 | $1,084 | $950 | $950 | $950 | $33,819 |
| 642E00310 CENTER LINE, TYPE 1A | 5 MILE | $1,000 | $1,229 | $950 | $1,084 | $950 | $950 | $950 | $1,581 |
| 642E01000 RAILROAD SYMBOL MARKING, TYPE 1 | 4 EACH | $500 | $264 | $400 | $456 | $400 | $400 | $400 | $340 |
| 647E18050 STOP LINE, TYPE A90 | 12 FT | $35.00 | $24.79 | $30.00 | $34.23 | $30.00 | $30.00 | $30.00 | $32.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $150 | $150 | $65.00 | $79.91 | $150 | $73.00 | $85.00 | $71.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $4,572 | $7,500 | $8,379 | $8,000 | $10,000 | $4,000 | $9,727 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $11,673 | $29,000 | $6,868 | $10,000 | $23,250 | $9,000 | $28,592 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 47 SY | $30.00 | $43.48 | $55.00 | $39.96 | $35.00 | $75.00 | $75.00 | $35.00 |
| 512E33000 TYPE 2 WATERPROOFING | 322 SY | $25.00 | $15.75 | $22.00 | $17.09 | $25.00 | $24.50 | $24.50 | $32.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 48 SF | $20.00 | $4.47 | $7.00 | $5.71 | $5.00 | $2.50 | $12.00 | $10.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 22 CY | $65.00 | $154 | $185 | $195 | $100 | $145 | $79.00 | $115 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 42 FT | $12.00 | $6.53 | $13.00 | $30.16 | $6.00 | $4.00 | $18.00 | $18.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 35 FT | $12.00 | $5.22 | $25.00 | $88.07 | $7.00 | $37.00 | $25.00 | $21.00 |
| 601E21001 CONCRETE SLOPE PROTECTION, AS PER PLAN | 18 SY | $100 | $320 | $550 | $391 | $50.00 | $1,690 | $230 | $1,075 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 30 CY | $125 | $148 | $120 | $180 | $80.00 | $202 | $120 | $155 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $6,859 | $12,500 | $8,000 | $12,000 | $5,000 | $7,000 | $15,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $6,367 | $10,000 | $8,621 | $10,000 | $19,000 | $5,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95800 12' X 6' CONDUIT, TYPE A, 706.05 | 96 FT | $1,175 | $113k | 20% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 242 CY | $195 | $47k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 7% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 80 CY | $375 | $30k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 97 CY | $265 | $26k | 5% |
| 832E30000 EROSION CONTROL | 18,000 EACH | $1 | $18k | 3% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 21 CY | $850 | $18k | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 25 CY | $700 | $18k | 3% |
| 304E20000 AGGREGATE BASE | 222 CY | $65 | $14k | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 6,280 LB | $2.25 | $14k | 3% |