MOE-CR 28-00.54
MOE County · est $0.8M
Bid dateThursday, November 17—
MOE County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Buds INC | R3Black Horse Bridge Construction INC | R4Ohio-west Virginia Excavating CO | R5Complete General Construction Company | R6George J Igel & CO INC | R7Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 515E12090 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $29,000 | $31,600 | $35,000 | $41,000 | $34,500 | $39,625 | $40,000 | 26% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 90 CY | $945 | $785 | $575 | $675 | $1,050 | $800 | $900 | 13% |
| Item | Quantity | R1Shelly & Sands INC | R2Buds INC | R3Black Horse Bridge Construction INC | R4Ohio-west Virginia Excavating CO | R5Complete General Construction Company | R6George J Igel & CO INC | R7Alan Stone CO INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $750 | $3,000 | $8,500 | $2,500 | $5,000 | $8,000 | $7,000 |
| 202E23000 PAVEMENT REMOVED | 466 SY | $10.00 | $25.00 | $11.00 | $22.00 | $15.00 | $10.00 | $10.00 |
| 202E53100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK |
| 52 CY |
| $1,450 |
| $1,295 |
| $1,225 |
| $1,100 |
| $1,000 |
| $1,100 |
| $1,750 |
| 11% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 186 FT | $195 | $195 | $250 | $250 | $215 | $191 | $250 | 5% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 98 FT | $350 | $375 | $400 | $274 | $450 | $500 | $200 | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 13,870 LB | $2.27 | $1.45 | $2.00 | $3.00 | $2.00 | $2.00 | $2.00 | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $30,000 | $15,000 | $25,000 | $43,000 | $38,000 | $58,000 | $50,000 | 4% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 60 FT | $485 | $515 | $500 | $350 | $475 | $300 | $650 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 97 CY | $295 | $295 | $295 | $300 | $295 | $295 | $350 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $14,000 | $20,000 | $20,000 | $20,000 | $20,000 | $21,000 | 3% |
| 203E10000 EXCAVATION | 907 CY | $22.00 | $25.00 | $30.00 | $20.00 | $35.00 | $35.00 | $29.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 62 CY | $295 | $295 | $295 | $300 | $295 | $295 | $425 | 3% |
| 304E20000 AGGREGATE BASE | 123 CY | $120 | $120 | $110 | $150 | $125 | $135 | $129 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 133 CY | $108 | $105 | $110 | $120 | $150 | $170 | $150 | 2% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 232 SY | $60.00 | $193 | $84.00 | $68.00 | $100 | $75.00 | $72.00 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 20 CF | $674 | $450 | $625 | $875 | $675 | $673 | $900 | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 73 CY | $175 | $100 | $140 | $165 | $275 | $245 | $125 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,000 | $3,500 | $7,500 | $3,000 | $3,000 | $7,500 | $10,000 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,550 | $2,550 | $2,680 | $2,800 | $2,120 | $2,120 | $13.00 | 2% |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 24 EACH | $250 | $238 | $225 | $275 | $240 | $315 | $250 | 1% |
| 1 EACH |
| $40.00 |
| $50.00 |
| $200 |
| $75.00 |
| $250 |
| $50.00 |
| $100 |
| 203E20000 EMBANKMENT | 107 CY | $25.00 | $32.00 | $22.00 | $35.00 | $20.00 | $25.00 | $17.00 |
| 204E10000 SUBGRADE COMPACTION | 721 SY | $4.50 | $5.00 | $5.00 | $8.00 | $7.00 | $7.00 | $4.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 125 FT | $21.50 | $21.50 | $22.40 | $65.00 | $36.44 | $36.45 | $37.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $2,700 | $2,700 | $2,870 | $3,200 | $2,350 | $2,350 | $2,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,250 | $1,250 | $1,360 | $1,900 | $1,120 | $1,120 | $1,200 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $150 | $200 | $185 | $100 | $500 | $200 | $193 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $98.00 | $25.00 | $100 | $150 | $150 | $150 | $150 |
| 659E00300 TOPSOIL | 97 CY | $42.00 | $20.00 | $62.00 | $45.00 | $20.00 | $28.00 | $25.00 |
| 659E10000 SEEDING AND MULCHING | 874 SY | $3.90 | $2.80 | $4.50 | $5.00 | $4.50 | $7.15 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 44 SY | $0.88 | $0.05 | $1.00 | $5.00 | $4.50 | $4.50 | $7.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $911 | $800 | $925 | $1,500 | $1,400 | $1,400 | $1,200 |
| 659E31000 LIME | 0.18 ACRE | $157 | $600 | $200 | $90.00 | $80.00 | $80.00 | $900 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.01 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 45 FT | $12.00 | $4.00 | $7.00 | $10.00 | $20.00 | $15.00 | $40.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE DEPTH | 233 SY | $15.00 | $20.00 | $15.00 | $13.00 | $15.00 | $15.00 | $42.00 |
| 407E10000 TACK COAT | 114 GAL | $4.00 | $4.00 | $4.00 | $12.00 | $4.00 | $4.00 | $4.00 |
| 609E26000 CURB, TYPE 6 | 21 FT | $116 | $75.00 | $100 | $75.00 | $200 | $50.00 | $200 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 8 EACH | $10.00 | $10.00 | $12.00 | $12.00 | $10.00 | $10.00 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 71 FT | $15.00 | $15.00 | $17.00 | $25.00 | $13.00 | $13.00 | $17.00 |
| 630E80100 SIGN, FLAT SHEET | 16 SF | $20.00 | $20.00 | $23.00 | $90.00 | $30.00 | $30.00 | $30.00 |
| 630E85200 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY | 7 EACH | $150 | $25.00 | $20.00 | $50.00 | $100 | $22.50 | $28.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 7 EACH | $100 | $10.00 | $15.00 | $50.00 | $100 | $22.50 | $28.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,650 | $5,000 | $6,500 | $5,000 | $5,000 | $10,000 | $5,700 |
| 202E23500 WEARING COURSE REMOVED | 120 SY | $12.00 | $20.00 | $9.00 | $18.00 | $75.00 | $20.00 | $3.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $4,000 | $10,000 | $15,000 | $18,000 | $15,000 | $18,000 | $5,000 |
| 512E10000 SEALING OF CONCRETE SURFACES | 145 SY | $18.00 | $25.00 | $34.00 | $35.00 | $18.00 | $18.00 | $42.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 44 SF | $8.00 | $15.00 | $15.00 | $6.00 | $15.00 | $12.00 | $2.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 64 FT | $30.00 | $35.00 | $30.00 | $28.00 | $40.00 | $35.00 | $45.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 12 EACH | $30.00 | $45.00 | $35.00 | $65.00 | $40.00 | $65.00 | $40.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 34 CY | $130 | $160 | $120 | $185 | $175 | $215 | $180 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 106 FT | $18.00 | $18.00 | $18.00 | $23.00 | $18.00 | $18.00 | $50.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 94 FT | $6.00 | $18.00 | $16.00 | $10.00 | $15.00 | $12.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $5.25 | $23.00 | $18.00 | $10.00 | $25.00 | $22.00 | $8.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,050 | $6,500 | $9,500 | $12,000 | $9,000 | $4,600 | $7,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,200 | $4,500 | $7,600 | $4,000 | $5,000 | $7,500 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12090 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $29,000 | $174k | 23% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 90 CY | $945 | $85k | 11% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 52 CY | $1,450 | $75k | 10% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 186 FT | $195 | $36k | 5% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 98 FT | $350 | $34k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 13,870 LB | $2.27 | $31k | 4% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $30,000 | $30k | 4% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 60 FT | $485 | $29k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 97 CY | $295 | $29k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |