MOE-CR 29-06.93
MOE County · est $0.7M
Bid dateThursday, February 9—
MOE County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Buds INC | R2Ohio-west Virginia Excavating CO | R3George J Igel & CO INC | R4Shelly & Sands INC | R5Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $15,000 | $21,325 | $11,000 | $12,000 | $13,000 | 17% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 135 FT | $400 | $300 | $420 | $238 | $250 | 10% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 70 CY | $700 | $725 | $765 | $1,000 | $1,500 | 9% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 120 FT | $360 | $300 | $305 | $267 | $245 | 8% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 31 CY | $1,200 | $1,100 | $1,250 | $2,133 | $1,800 | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) |
| Item | Quantity | R1Buds INC | R2Ohio-west Virginia Excavating CO | R3George J Igel & CO INC | R4Shelly & Sands INC | R5Alan Stone CO INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $4,500 | $5,000 | $5,300 | $10,000 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $500 | $400 | $200 | $105 | $292 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 9 FT | $65.00 | $100 | $70.00 | $24.00 | $30.00 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $50.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 113 CY |
| $230 |
| $250 |
| $240 |
| $230 |
| $230 |
| 5% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $25,000 | $2,500 | $20,000 | $39,000 | $4,500 | 5% |
| 304E20000 AGGREGATE BASE | 230 CY | $95.00 | $110 | $120 | $142 | $100 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 110 FT | $195 | $300 | $263 | $195 | $260 | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 55 CY | $350 | $300 | $367 | $350 | $360 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,000 | $10,000 | $44,850 | $45,000 | $45,000 | 3% |
| 502E11101 STRUCTURE FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $15,000 | $18,000 | $25,000 | $26,000 | $80,000 | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $15,000 | $10,000 | $42,000 | $24,000 | $12,000 | 3% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 591 SY | $25.00 | $32.00 | $15.00 | $30.00 | $30.00 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 9,121 LB | $1.34 | $2.25 | $2.00 | $5.39 | $2.40 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $20,000 | $20,000 | $20,000 | $18,000 | 2% |
| 202E23000 PAVEMENT REMOVED | 419 SY | $28.00 | $18.00 | $5.00 | $6.00 | $15.00 | 2% |
| 203E10000 EXCAVATION | 376 CY | $28.00 | $24.00 | $20.00 | $25.00 | $20.00 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 105 CY | $100 | $115 | $120 | $97.00 | $220 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,550 | $2,300 | $2,150 | $2,550 | $2,550 | 2% |
| $75.00 |
| $125 |
| $42.00 |
| $50.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 12" | 33 FT | $110 | $50.00 | $30.00 | $53.00 | $70.00 |
| 202E75000 FENCE REMOVED | 136 FT | $5.00 | $8.00 | $4.00 | $10.75 | $4.50 |
| 203E20000 EMBANKMENT | 104 CY | $30.00 | $40.00 | $35.00 | $20.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 1,234 SY | $3.75 | $2.50 | $6.00 | $4.00 | $4.50 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $200 | $100 | $400 | $150 | $167 |
| 690E72000 SPECIAL - ASBESTOS NOTIFICATION | 1 LS | $300 | $500 | $75.00 | $3,500 | $280 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $50.00 | $150 | $150 | $180 |
| 659E00300 TOPSOIL | 65 CY | $15.00 | $40.00 | $20.00 | $63.00 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 585 SY | $5.00 | $6.00 | $8.00 | $5.45 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 29 SY | $0.01 | $6.00 | $5.45 | $5.45 | $7.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $800 | $1,200 | $1,400 | $1,400 | $1,000 |
| 659E31000 LIME | 0.12 ACRE | $400 | $150 | $100 | $100 | $700 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1.1 CY | $1,500 | $2,500 | $2,500 | $4,300 | $3,500 |
| 611E04400 12" CONDUIT, TYPE B | 78 FT | $72.00 | $75.00 | $97.00 | $139 | $95.00 |
| 611E05900 15" CONDUIT, TYPE B | 10 FT | $25.00 | $110 | $98.00 | $155 | $100 |
| 611E07900 18" CONDUIT, TYPE D | 128 FT | $78.00 | $70.00 | $85.00 | $99.00 | $100 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,000 | $2,500 | $1,700 | $4,100 | $2,500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 39 FT | $5.00 | $10.00 | $8.00 | $13.00 | $25.00 |
| 407E10000 TACK COAT | 73 GAL | $3.50 | $10.00 | $3.50 | $3.50 | $4.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $10.00 | $12.00 | $10.00 | $10.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 58 FT | $15.00 | $20.00 | $20.00 | $15.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $20.00 | $25.00 | $20.00 | $20.00 | $20.00 |
| 630E85200 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY | 6 EACH | $25.00 | $50.00 | $25.00 | $150 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $30.00 | $25.00 | $20.00 | $37.13 |
| 204E10000 SUBGRADE COMPACTION | 591 SY | $3.75 | $5.00 | $2.00 | $6.00 | $4.62 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,500 | $4,200 | $10,000 | $3,800 | $7,000 |
| 202E23500 WEARING COURSE REMOVED | 71 SY | $20.00 | $22.00 | $32.00 | $8.50 | $22.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $7,500 | $20,300 | $10,000 | $1,400 | $2,300 |
| 512E10000 SEALING OF CONCRETE SURFACES | 80 SY | $22.00 | $32.00 | $22.50 | $22.50 | $25.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $15.00 | $6.00 | $9.00 | $16.00 | $10.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 54 FT | $32.00 | $30.00 | $45.00 | $34.00 | $50.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 12 EACH | $25.00 | $38.00 | $30.00 | $25.00 | $50.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 24 EACH | $210 | $190 | $175 | $164 | $200 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 20 CY | $150 | $140 | $180 | $170 | $200 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 118 FT | $18.00 | $15.00 | $16.00 | $15.50 | $40.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 80 FT | $14.00 | $10.00 | $8.00 | $5.50 | $8.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $18.00 | $10.00 | $16.00 | $5.50 | $9.50 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 46 CY | $103 | $210 | $180 | $143 | $150 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 20 CF | $400 | $850 | $720 | $728 | $700 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $10,000 | $3,500 | $4,400 | $7,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $2,500 | $6,000 | $10,500 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $15,000 | $90k | 15% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 135 FT | $400 | $54k | 9% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 70 CY | $700 | $49k | 8% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 120 FT | $360 | $43k | 7% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 31 CY | $1,200 | $37k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 113 CY | $230 | $26k | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 4% |
| 304E20000 AGGREGATE BASE | 230 CY | $95 | $22k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 110 FT | $195 | $21k | 3% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 55 CY | $350 | $19k | 3% |