CLA-US 42-08.20
CLA County · est $1.3M
Bid dateThursday, November 14—
CLA County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Buds INC | R2Miller Bros Const INC | R3Eagle Bridge CO | R4Brumbaugh Construction INC | R5Sunesis Construction CO | R6Shelly & Sands INC | R7John R Jurgensen Company | R8Heavy Highway Construction Company LLC | R9George J Igel & CO INC | R10R B Jergens Contractors INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $12,860 | $11,750 | $10,600 | $11,000 | $14,070 | $12,800 | $12,862 | $12,000 | $13,500 | $14,330 | 18% |
| Item | Quantity | R1Buds INC | R2Miller Bros Const INC | R3Eagle Bridge CO | R4Brumbaugh Construction INC | R5Sunesis Construction CO | R6Shelly & Sands INC | R7John R Jurgensen Company | R8Heavy Highway Construction Company LLC | R9George J Igel & CO INC | R10R B Jergens Contractors INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $1,000 | $1.00 | $500 | $504 | $3,000 | $2,650 | $10,000 | $5,000 | $15,066 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 90 CY | $775 | $775 | $700 | $600 | $733 | $880 | $1,303 | $685 | $900 | $1,043 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 284 CY | $240 | $212 | $212 | $270 | $212 | $194 | $265 | $265 | $230 | $230 | 9% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $67,330 | $6,000 | $17,500 | $20,000 | $2,641 | $19,000 | $20,113 | $30,000 | $25,000 | $16,311 | 9% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 51 CY | $975 | $1,100 | $1,350 | $1,400 | $820 | $1,660 | $1,375 | $1,150 | $1,300 | $1,114 | 6% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 111 FT | $425 | $429 | $429 | $570 | $429 | $432 | $429 | $450 | $429 | $576 | 6% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 196 SY | $225 | $168 | $170 | $150 | $247 | $325 | $249 | $200 | $185 | $254 | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 34,222 LB | $1.28 | $1.32 | $1.20 | $1.00 | $1.34 | $1.17 | $1.08 | $2.00 | $1.20 | $1.72 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $35,500 | $47,500 | $80,000 | $31,408 | $39,000 | $35,205 | $65,000 | $55,000 | $36,866 | 5% |
| 304E20000 AGGREGATE BASE | 383 CY | $87.00 | $73.00 | $85.00 | $70.00 | $102 | $86.00 | $75.83 | $65.00 | $130 | $88.47 | 4% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,080 FT | $27.00 | $35.00 | $40.00 | $40.00 | $28.75 | $24.00 | $29.49 | $30.00 | $30.00 | $29.56 | 4% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (98 CY | $245 | $260 | $260 | $350 | $260 | $239 | $335 | $335 | $270 | $283 | 3% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 84 CY | $260 | $260 | $260 | $400 | $260 | $234 | $385 | $385 | $300 | $283 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $16,500 | $47,000 | $45,000 | $17,428 | $39,443 | $40,000 | $40,000 | $34,001 | $55,000 | $40,108 | 2% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 9,816 LB | $1.68 | $2.05 | $1.80 | $2.00 | $2.05 | $1.83 | $1.79 | $2.50 | $2.00 | $2.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 1,592 SY | $9.50 | $7.00 | $10.00 | $15.00 | $9.09 | $7.00 | $9.40 | $20.00 | $9.00 | $6.76 | 2% |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 102 FT | $135 | $142 | $170 | $200 | $174 | $201 | $308 | $235 | $195 | $222 | 2% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 53 SF | $250 | $200 | $185 | $130 | $302 | $175 | $175 | $110 | $175 | $176 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 4 EACH | $2,500 | $2,400 | $2,400 | $2,600 | $2,400 | $2,500 | $2,400 | $2,500 | $2,530 | $2,674 | 1% |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,500 | $2,325 | $2,325 | $3,300 | $2,325 | $2,500 | $2,325 | $2,500 | $2,325 | $3,297 | 1% |
| 595 FT |
| $2.00 |
| $6.00 |
| $3.50 |
| $10.00 |
| $10.00 |
| $2.80 |
| $10.00 |
| $1.00 |
| $5.00 |
| $5.19 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $200 | $425 | $250 | $500 | $500 | $290 | $500 | $250 | $200 | $130 |
| 203E10000 EXCAVATION | 350 CY | $28.00 | $22.00 | $25.00 | $20.00 | $32.12 | $19.00 | $26.93 | $17.00 | $25.00 | $27.30 |
| 203E20000 EMBANKMENT | 323 CY | $28.00 | $22.00 | $25.00 | $20.00 | $19.02 | $35.00 | $30.25 | $25.00 | $35.00 | $18.71 |
| 204E10000 SUBGRADE COMPACTION | 2,297 SY | $2.00 | $4.00 | $4.50 | $1.00 | $4.26 | $4.00 | $3.15 | $1.50 | $4.00 | $4.66 |
| 606E15050 GUARDRAIL, TYPE MGS | 350 FT | $20.00 | $21.00 | $21.00 | $25.00 | $21.00 | $20.00 | $21.00 | $20.00 | $21.00 | $24.92 |
| 659E00300 TOPSOIL | 160 CY | $20.00 | $44.00 | $5.00 | $60.00 | $31.06 | $48.00 | $25.38 | $50.00 | $20.00 | $52.78 |
| 659E10000 SEEDING AND MULCHING | 1,437 SY | $2.40 | $3.75 | $3.50 | $2.00 | $2.83 | $2.40 | $3.75 | $2.40 | $5.00 | $3.89 |
| 659E14000 REPAIR SEEDING AND MULCHING | 72 SY | $0.10 | $1.00 | $3.00 | $1.00 | $2.59 | $2.40 | $1.00 | $2.40 | $2.40 | $1.04 |
| 659E15000 INTER-SEEDING | 72 SY | $0.10 | $0.01 | $3.00 | $1.00 | $2.59 | $2.40 | $0.01 | $2.40 | $2.40 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.23 TON | $600 | $1,500 | $1,500 | $800 | $1,811 | $1,250 | $1,500 | $1,250 | $1,250 | $1,558 |
| 659E31000 LIME | 0.33 ACRE | $300 | $200 | $5.00 | $1.00 | $582 | $150 | $200 | $150 | $150 | $208 |
| 659E35000 WATER | 8 MGAL | $0.50 | $1.00 | $10.00 | $5.00 | $1.39 | $1.00 | $1.00 | $1.00 | $1.00 | $1.04 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,925 | $2,250 | $1,600 | $1,925 | $2,000 | $1,925 | $2,000 | $1,925 | $1,558 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,100 | $3,060 | $9,500 | $8,000 | $2,100 | $5,100 | $4,625 | $8,100 | $4,096 | $7,269 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $3,000 | $3,546 | $4,000 | $5,000 | $3,546 | $3,600 | $3,546 | $4,000 | $3,000 | $4,154 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 152 FT | $15.00 | $17.00 | $12.00 | $10.00 | $40.34 | $22.00 | $68.11 | $20.00 | $34.00 | $12.17 |
| 611E05200 12" CONDUIT, TYPE F | 10 FT | $10.00 | $50.00 | $25.00 | $90.00 | $51.15 | $80.00 | $95.53 | $100 | $87.00 | $130 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 60 FT | $3.00 | $3.00 | $5.00 | $5.00 | $14.58 | $15.00 | $14.58 | $8.00 | $2.00 | $4.71 |
| 407E10000 TACK COAT | 221 GAL | $5.00 | $2.50 | $2.50 | $5.00 | $2.50 | $3.05 | $5.00 | $5.00 | $5.00 | $2.72 |
| 614E12420 DETOUR SIGNING | 1 LS | $9,000 | $8,542 | $12,500 | $9,000 | $8,920 | $8,543 | $8,542 | $10,000 | $10,000 | $8,871 |
| 626E00116 BARRIER REFLECTOR, TYPE 5(BI-DIRECTIONAL) | 16 EACH | $33.00 | $11.00 | $11.00 | $10.00 | $11.00 | $32.00 | $11.00 | $20.00 | $11.00 | $25.96 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 0.7 SF | $51.00 | $67.24 | $20.00 | $20.00 | $20.00 | $50.00 | $67.24 | $67.24 | $20.00 | $69.83 |
| 646E10010 EDGE LINE, 6" | 0.22 MILE | $11,000 | $10,620 | $10,620 | $20,000 | $10,620 | $10,620 | $10,620 | $10,620 | $19,740 | $11,029 |
| 646E10200 CENTER LINE | 0.11 MILE | $10,000 | $9,825 | $9,825 | $22,000 | $9,825 | $9,825 | $9,825 | $9,825 | $21,430 | $10,203 |
| 202E22900 APPROACH SLAB REMOVED | 107 SY | $35.00 | $58.00 | $45.00 | $80.00 | $42.39 | $23.00 | $33.93 | $80.00 | $40.00 | $28.57 |
| 202E23500 WEARING COURSE REMOVED | 283 SY | $8.00 | $6.00 | $12.00 | $20.00 | $8.03 | $8.00 | $8.96 | $45.00 | $13.00 | $13.45 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,000 | $7,700 | $25,000 | $15,000 | $12,896 | $22,000 | $6,421 | $10,000 | $30,000 | $17,850 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $6,000 | $26,000 | $35,000 | $15,000 | $41,808 | $16,000 | $20,227 | $8,000 | $40,000 | $12,309 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 990 FT | $3.00 | $14.00 | $5.00 | $5.00 | $37.02 | $26.00 | $39.07 | $20.00 | $27.00 | $17.75 |
| 507E93300 STEEL POINTS OR SHOES | 18 EACH | $140 | $150 | $140 | $150 | $179 | $129 | $226 | $135 | $145 | $133 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 208 SY | $25.00 | $40.00 | $28.50 | $25.00 | $51.75 | $28.50 | $28.50 | $28.00 | $28.50 | $31.12 |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 20 FT | $85.00 | $158 | $95.00 | $110 | $56.67 | $95.00 | $95.00 | $70.00 | $95.00 | $293 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 15 SF | $12.00 | $17.00 | $13.00 | $6.00 | $6.39 | $10.00 | $33.11 | $10.00 | $16.00 | $6.32 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 126 FT | $35.00 | $31.00 | $35.00 | $36.00 | $51.20 | $40.00 | $40.00 | $30.00 | $40.00 | $53.94 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 22 EACH | $50.00 | $42.00 | $30.00 | $70.00 | $34.16 | $99.00 | $146 | $65.00 | $40.00 | $72.04 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 44 EACH | $130 | $172 | $160 | $175 | $211 | $108 | $242 | $200 | $160 | $186 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 64 CY | $120 | $130 | $125 | $75.00 | $151 | $125 | $154 | $125 | $130 | $108 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 109 FT | $15.00 | $20.00 | $15.00 | $16.00 | $24.65 | $14.00 | $14.00 | $18.00 | $25.00 | $33.04 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 133 FT | $15.00 | $12.00 | $12.00 | $30.00 | $4.58 | $7.00 | $9.20 | $12.00 | $7.00 | $13.21 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 30 FT | $15.00 | $21.00 | $15.00 | $20.00 | $40.63 | $25.00 | $62.68 | $12.00 | $40.00 | $27.15 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,300 | $6,500 | $5,000 | $5,000 | $5,134 | $4,000 | $3,280 | $7,500 | $4,500 | $4,673 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 98 CY | $100 | $108 | $80.00 | $100 | $144 | $131 | $166 | $120 | $125 | $190 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $2,500 | $10,980 | $8,000 | $10,000 | $14,807 | $16,000 | $13,750 | $5,000 | $15,750 | $10,385 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $4,806 | $15,000 | $15,000 | $6,310 | $5,800 | $7,591 | $45,000 | $6,000 | $13,444 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $1,900 | $3,000 | $1,000 | $1,336 | $3,000 | $8,870 | $15,000 | $6,000 | $20,398 |
| 619E16000 FIELD OFFICE, TYPE A | 5 MNTH | $300 | $3,600 | $2,500 | $1,000 | $1,485 | $4,000 | $2,011 | $2,500 | $1,520 | $2,438 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $14,300 | $12,500 | $10,000 | $15,600 | $15,000 | $5,581 | $8,500 | $12,000 | $31,986 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $12,860 | $141k | 15% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 90 CY | $775 | $70k | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 284 CY | $240 | $68k | 7% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $67,330 | $67k | 7% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 51 CY | $975 | $50k | 5% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 111 FT | $425 | $47k | 5% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 196 SY | $225 | $44k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 34,222 LB | $1.28 | $44k | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $35k | 4% |
| 304E20000 AGGREGATE BASE | 383 CY | $87 | $33k | 4% |